IFTIKHAR AHMED

IFTIKHAR AHMED

Followers of IFTIKHAR AHMED55 followers
location of IFTIKHAR AHMEDPakistan

Connect with IFTIKHAR AHMED to Send Message

Connect

Connect with IFTIKHAR AHMED to Send Message

Connect
  • Timeline

  • About me

    Unit Manager Machinery at Agritech limited (formerly Pak American Fertilizer Limited)

  • Education

    • University of Engineering & Technology Peshawar

      -
      Bachelor of Science (Mechanical) Mechanical
  • Experience

    • Agritech limited (formerly Pak American Fertilizer Limited)

      Jan 1994 - now

      • Overall Supervision for overhauling of main equipments in collaboration of respective vendor’s specialist of all pumps, compressors and Turbines of the Fertilizer plant.• Coordinate for developing and maintaining the history records and daily maintenance sheets & level setting of spares.• Established & organized a department named C&T department for the plant & also prepared a skilled & qualified team for it.• Supervision for overhauling of following main equipment in collaboration of respective vendor’s specialist i.e M/s Turbomach, M/s Mitsubishi Heavy Industries Japan, M/s Shinko Japan & M/s PM Control Singapore. - Turbine for Power Generation at Power House of 11MW.- Synthesis Gas Compressor’s Turbine (A-103-J/JT) of 7.6 MW.- CO2 Compressor’s Train (UGB-GT - 101) of 4.6 MW Turbine.- Cooling Water Circulation pump’s Turbines (CGT-3301 A~C) of 863 KW.• Developed and maintained the history records and daily maintenance sheets & level setting of spares.• Worked on an assignment to investigate about Dry Gas Seal’s failure at High Pressure CO2 compressor with collaboration of Vendor’s specialists John Crane, Mitsubishi Heavy Industries Ltd. & Toyo Engineering Corporation Japan.• Complete erection & commissioning of Gas Turbine of 7.5 MW along with its piping and auxiliary equipments.• Field repair & exchange activity of Gas Turbine.Revamp Project (2009-2010) Act as Project Manager (Machinery) for the Revamp Project of Capacity Enhancement of the existing plant. Responsibilities of jobs are:• Indenting and technical evaluation of all machines • Erection of machines along with piping jobs & strengthening of civil foundations.• Replacement of MHI Air, Synthesis and CO2 machines with new one including auxiliaries.• Installation of Woodward digital governor (Redundant Type) for Air machine.• Commissioning and start up of all machines. Show less • Supervision of Erection of all stationary and rotary equipments of the fertilizer plant.• Supervision of fixing of internals and catalyst loading of vessels, columns & tanks at Ammonia, Urea & Offsite facilities.• Supervision of piping installation of Lube oil circuit of all the machines.• Supervision of Fabrication and installation of steel structure at Ammonia & Urea Plants. • During Pre-commissioning activities, works as member of Pre-commissioning team which carried out jobs as follows:-- Solo Run & over speed trip test of turbines at the plant.- Lube Oil flushing of the machines.- Hydro-testing of coolers & heat exchangers.- Installation of Dry Gas and labyrinth seals. Show less Worked as Assistant Manager (Project Coordination) for Modernization and Expansion Project. Specific job assigned / accomplished & duties include assisting Project Manager for co-ordination on various technical matters with the engineering contractor (M/s Toyo Engineering Corporation of Japan) and the consultants (M/s Japan Consulting Institute of Japan).• Review of Basic Engineering design data.• Review of detail engineering design regarding drawing specification of equipment.• Review of Isometrics & piping specifications.• Review and finalization of tender documents for haulage and equipment contractor. Show less

      • Unit Manager Machinery

        Jan 1998 - now
      • Assistant Manager (Project Erection)

        Jan 1996 - Jul 1998
      • Assistant Manager (Project Coordination)

        Jan 1994 - Jul 1996
  • Licenses & Certifications

    • Registered with Pakistan Engineering Council

      PEC