Senthil Subramanian

Senthil Subramanian

Site Engineer cum Quantity Surveyor

Followers of Senthil Subramanian128 followers
location of Senthil SubramanianIndia

Connect with Senthil Subramanian to Send Message

Connect

Connect with Senthil Subramanian to Send Message

Connect
  • Timeline

  • About me

    I am currently seeking an opportunity in GCC, KSA, Singapore, India for Civil Engineer in Metro Rail Projects, Roads, Project Management

  • Education

    • Pattukkottai Polytechnic College

      1988 - 1991
      Diploma of Education Civil Engineering
  • Experience

    • Nandhini Construction

      Nov 1992 - Nov 1999
      Site Engineer cum Quantity Surveyor

      • Constructed New Taluk Office Building at Sankarapuram - Villupuram District• Constructed 08Bed ward EYE Hospital at Government Hospital in Kallakurichi – Villupuram District• Construction and Execution on Staff Quarters @ Gomukhi Dam – Villupuram District

    • Brahma Developers

      Jan 2000 - Sept 2002
      Site Engineer

      • Successfully executed and monitored all building construction activity• Prepared BoQs, Final & Completion Report, Measurement Book, Stock register, BBS and managed bar bending & formworks.

    • Dong-A Geological Engineering Pte Ltd

      Dec 2002 - Aug 2006
      Tunnel Engineer

      • Effectively planned and launched Shaft and Shoring systems, Gantry Crane, Muck pit and DG shed arrangements.• Supervision on works related to tunnel boring with earth pressure balance TBM, Cutter-Head intervention and Man hole work and installation of Corrosion Protective Line (CPL) system• Conducted proper selection of Segment, Alignment of Segment, Surveying, Steps and Lips checking.• Ensured work task were conducted in accordance with approved QPD drawings, data sheet and M&W specifications and enhanced quality of assembly.• Monitored primary and Secondary Grouting for rings, breakthrough at Shaft.• Frontline supervision of Adit enlargement/Shaft permanent structural works.• Examined the alignment and leveling for NATM Tunnel Excavation.• Reaction frame erection and dismantling• Drilling and Grouting works.• Coordinated various activities for the best possible utilization of resources to achieve targeted production and ensured quality of work and safety regulation has been compiled.• Inspected incoming resources and material for permanent lining and fit out works.• Performed maintenance, repair, assembly and dismantling of TBM• Preparation of daily report and coordination with Client and Contractor Show less

    • Zhao Yang Geotechnical Pte Ltd,

      Sept 2007 - Sept 2011
      Site In-Charge

      • Worked as In-Charge of Jet Grouting (JGP) for single and double tube grout works on site• Planned & setting lay-out of Silo and machinery for all grouting woks• Managed all soil improvement works for Wet Speed Mixing (WSM), Ground Anchoring, Tam Grouting, Bored Pile, Solider Pile, Micro pile and Sheet Piles.• Conducted SPT & Coring test for Soil and Grouting Pile on site.• Arranged appropriate resources including material and manpower for proper execution of work.• Prepare daily report and submission of IR’s• Strictly implementation of Safety policy and relevant regulation Show less

    • Ipex Infrastructure Pte Ltd, Chennai

      Jan 2012 - Mar 2013
      Dy Manager

      -Execution of Under Ground Civil works like Guide wall, D-wall, Shaft Excavation, Strut&Waller Eection, Cut and Cover Tunnel, Reinforcement works-Incharge of Jet Grouting Programme. (JGP), Planning & Setting/ lay-out of. Batching Plant-Micro Pile, Bored Pile, WSM (Wet. Speed Mixing), Sheet Pile, Plunged. Column with Bored Pile-Execution of Under Ground Tunnelling(TBM) works like Segment Assembling, Planning day to day work and Preparing Daily Report, Submission of RFI's, NATM etc,-Execution & Incharge of all Constructional activities,Maintain the M.Book, Maintain the stock register on site, Preparing the Bill& Completion Report Show less

    • Pratibha Industries Ltd.

      May 2013 - Jan 2016
      Deputy Manager - Project

      • Successfully executed underground metro work for Top-Down methods of Civil tasks like Guide wall, Diaphragm wall, King post Column, Solider Pile, Shaft Excavation, Bored pile with Plunged-in Column. Effectively planned and Executed the following:• Decking slab for road diversion and mobilization of equipment.• Box pushing work for Entry/Exit in running outer ring road.• Architect work for Block work, Plastering, Floor Finish works.• Executed and supervision of all Structural work which includes Reinforcement, Formwork, and Concreting for all level Slabs, External/Internal walls, Beams and Columns.• Forged and maintained mutual relationships with Sub-Contractor and Vendors.• Planned day-to-day work schedule and prepared BBS, Sub-Contractor bills and Submitted IR’s. Show less

    • Parsons Corporation

      Feb 2016 - Mar 2021
      Civil Engineer

      • Conducted general inspections on all bottom-up underground metro stations, cut & covered and ramped up construction activities and sub-contractor work to assure contractual compliance• Planned and executed projects in line with time, cost and quality parameters• Monitored the Quality Control and Quality Assurance, reviewed field measurements and assisted in compiling Bill of Quantities reports (BoQs) for payment of quantities and charges in the work• Supervised all station activities like Pile Foundation, Pile Cap, Pier & Pier Cap, Anchors and Shotcrete, Secant and Micro Tension Piles, Water Proofing works, Reinforcement, Formworks, Internal & External concrete walls, Base and other level slabs• Received and installed precast elements like I-Beams, Rectangular, Double -T, Slabs at Concourse, Technical, Mezzanine and Platform levels in Stations• Liaised with the architects / consultants / clients / contractors to evaluate technical specifications and essentials• Inspected for Architectural Activities like Surface Preparation, Block Works for Internal Walls, Floor Finish for Screed and Applications of Epoxy Terrazzo Flooring• Supervised Architectural Work like Wall Cladding (Plasterboard, Gypsum board) and Suspended Ceiling, Raised Floor, PSD Steel Structure Installation and obtained the material and installed canopy at entrances• Ensured works were done in an accordance with an approved QPD Drawings, Data Sheet and M&W Specifications• Supervised and inspected the following:o All backfill work operations to ensure that the project requirements are followed and conducted FDT Test (Nuclear, Sand Cone test method) on backfill materialso Landscape work for Hardscape, Kerb Stone and Paver Blocks laying the footpath and service roadso Road and Pavement Works for base, sub-base and surface course Show less

  • Licenses & Certifications

    • Supervisor Safety Course., Singapore

      Tat Hong Plant Hire Sdn Bhd
      Nov 2009
    • Civil Technician., Saudi Arabia

      Saudi Council of Engineers
      Dec 2018
    • Lifting Supervisor

      NTUC LearningHub
      Nov 2006