Amirul Asyraf Abdul Manap

Amirul Asyraf Abdul Manap

Project Engineer (E&I)

Followers of Amirul Asyraf Abdul Manap852 followers
location of Amirul Asyraf Abdul ManapTelok Panglima Garang, Selangor, Malaysia

Connect with Amirul Asyraf Abdul Manap to Send Message

Connect

Connect with Amirul Asyraf Abdul Manap to Send Message

Connect
  • Timeline

  • About me

    Project Engineer; Construction Engineer ; Electrical & Instrument Engineer ; Seeking for a new job opportunity. #WorkNow #ReadyToMob #OpenToWork #ProjectManagement #ConstructionLife

  • Education

    • UTHM

      2009 - 2012
      Bachelor Degree of Electrical Engineering with Honors Electrical Engineering
    • Universiti Teknologi Malaysia

      2006 - 2009
      Diploma Electrical Engineering (Power)
  • Experience

    • J&M Power Sdn Bhd

      Jan 2013 - Oct 2014
      Project Engineer (E&I)

       E & I Installation work for Biomass Coke Pilot Plant Project, Nippon Steel SumikinBiomass Coke (M) Sdn Bhd, Bota, Perak (August 2013 ~ December 2013)**Project Scope:-Panel Installation: Transformer, MCC etc.-Cable Pulling: HT, MV, LV, Control Cables-Cable Ladder/Tray Installation: Electrical Equipment & Electrical Room-Electrical Test/Cable Termination: Cont. & Megger Test etc. Electrical Installation work for Body Shop, Perodua New Plant, Bukit Beruntung,Selangor (Mid of December 2013 ~ February 2014)**Project Scope:-Cable Pulling: HT, MV, LV, Control Cables-Cable Ladder/Tray Installation: Electrical Equipment & Power panel-Electrical Test/Cable Termination: Cont. & Megger Test etc. Instrumentation installation work for Sagami Manufacturers Sdn Bhd, BembanIndustrial Estate, Batu Gajah, Perak. (February 2014 ~ April 2014)**Project Scope:-Airline Route: SUS 12mmOD, Cu 6mmOD and CU 8mmOD-Instrument Equipment-Instrument Airline Test: Leak test and etc.Electrical Installation work for Kawamura Kako Plant, Perodua Bukit Beruntung, Selangor (Early of May 2014 ~ July 2014)**Project Scope:-Cable Pulling: HT, MV, LV, Control Cables-Cable Ladder/Tray Installation: Electrical Equipment & Power panel-Electrical Test/Cable Termination: Cont. & Megger Test etc.Job Description: Manage and coordinate team of supervisors, sub-contractor and liaise with clients/material suppliers. Attend project review meeting and produce regular progress reports. Preparing job proposals, reports, and technical material documentation. Preparation and implementation of electrical and instrument systems according toclients’ requirements and quality standards. Technically approve all E&I designs, calculations and other key designdocumentation. Able to perform accurate design calculations and cost estimates. Prepare schedule for coordinate sub-contractor such cable pulling and termination,equipment installation and insulation test to start work. Show less

    • MIE INDUSTRIAL SDN BHD

      Jan 2016 - Sept 2018

      Project: (1) Pengerang Deepwater Terminal 2 (PDT2) Project, (2) Petrochemical Plant, Pengerang Deepwater Terminal 2.Pengerang, JohorDialog Plant Services, Vopak Sdn Bhd and PetronasJob Description:1) Prepare material take-off, material requisition and receive, material inspection2) Site monitoring, manage manpower allocation with supervisor, sub-contractor3) Prepare redline mark-up drawing based on site condition and for as-built purpose4) Fully involved on Electrical Substation building include 33kV/6,6kV transformer,33kV/0.4kV Transformer, MV and LV Switchgear, Motor control cabinet for pump andmotor, VFD, MVSS and electrical heat tracing (EHT), tankage, local pump station, andstreet lighting system.5) Fully involved in PMCS system, Telephone and CCTV system and Building Control Monitoring System. 6) Arrange the Optical Time Domain Reflectometer (OTDR) test for fiber optic cable toensure the cable dB/km lost is acceptable before & after cable pulling work. Show less Project: Terengganu Gas Terminal (TGAST) Project, Kerteh, TerengganuPetronas Carigali Sdn Bhd, Samsung Engineering Co. Ltd.Job Description:1. Prepare material take-off, material requisition and receive, material inspection2. Site monitoring, manage manpower allocation with supervisor, sub-contractor3. Prepare redline mark-up drawing based on site condition and for as-built purpose4. Fully involved in PMCS system, PAGA & Telephone system, CCTV system, FASsystem.Acting as Electrical Construction Manager for 3 months. Show less

      • Electrical Construction Engineer

        Dec 2016 - Sept 2018
      • Electrical Construction Engineer cum Electrical Construction Manager

        Jan 2016 - Nov 2016
    • Hexatech Engineering Sdn. Bhd.

      Sept 2018 - Sept 2020
      Electrical Project Engineer

      Project:(1) Pavilion Bukit Jalil Mall (HT Services – 33kV),Bukit Jalil, Kuala LumpurPioneer Haven Sdn Bhd, Domain Resources Sdn BhdJob Description:1) Prepare material take-off, material requisition and receive, material inspection2) Assist in project scheduling, execution, documentation and tracking of all ongoingprojects until completion.3) Liaise with related personnel in other department of the Company to ensureprompt and on time delivery of material or equipment to customers.4) Site monitoring, manage manpower allocation with supervisor, sub-contractor5) Prepare redline mark-up drawing based on site condition and for as-built purpose6) Fully involved on Electrical Main Substation Room and Consumer Substation roominclude 33kV/3.3kV transformer, 33kV/0.4kV Transformer, MV and LV Switchgearand RCP panel. Show less

    • CN ELECO ENGINEERING (M) SDN BHD

      Nov 2020 - Apr 2021
      Quantity Surveyor Engineer

      Project:1) ATB-PU (Separation & Processing Unit Plant) Project, Tanjung Bin, Pontian, JohorATB Petroleum Tanjung Bin, HQC Engineering Malaysia Sdn BhdJob Description:1) Identify, analyse & develop with Bill Quantity (BOQ) of project.2) Record & track the BOQ or MTO from approved drawing especially for Work Order.3) Arrange site team work activities on morning toolbox meeting on daily basis.4) Track work progress and submit progress report so as to ensure that the projects areexecuted on time and within budget5) Prepare & submit Site Instruction (SI), Variation Order (VO) for additional worksclaim to contractor.6) Prepare & submit payment document for monthly progress claim to contractor.7) Prepare & submit the daily, weekly & monthly report to contractor for monthly claimevident.8) To ensure company gets the claim from project each month to maintain the cash flow.9) Valuing & site visit the completed work and arranging for progress payments Show less

    • OCN CONSTRUCTORS SDN BHD

      May 2021 - Jan 2022
      Instrument Engineer

      Project:1) Port Klang Refrigerated LPG Terminal, Dry Bulk Terminal 2, Westports Pulau IndahGPS Klang Terminal, HQSM Engineering Pte LTDJob Description:1) Setting / Preparation of work schedule for project execution.2) Identify, analyse & develop with Bill Quantity (BOQ) of project.3) Support Main Contractor site team to deliver project on schedule.4) Study and review engineering drawing and prepare Site Technical Query (STQ) ifrequired.5) To ensure that site personnel comply with occupation, safety and health Act 1994 atsite.6) Responsible for site monitoring progress as well as planning, implementation, controland financial aspects of the project7) Liaising with Contractor’s and QC’s to ensure that project meets requiredspecifications as per standard benchmark.8) Report site progress to Construction Manager in daily basis.9) Plan for tubing leak test activity.10) Assist supervisor and technician to perform loop check.11) Assist vendor on Level transmitter installation (Honeywell, Instruparts)12) Valuing & site visit the completed work and arranging for progress payments Show less

    • HQSM Engineering Pte Ltd

      Jan 2022 - Jul 2022
      Electrical Engineer - Commissioning & Warranty

      Project: 1) Port Klang Refrigerated LPG Terminal, Dry Bulk Terminal 2, Westports Pulau IndahGPS Klang Terminal Pre-commissioning & Commissioning activity such as 33kV. 6.6kV & 415VConsumer Substation Power Energization, Motor Solo Run (MSR) and support duringMechanical Running Test (MRT), Functional Check, Troubleshooting activities etc. To involve System-Turn Over (STO) & Commissioning Team during Precommissioning & commissioning activity (AC/DC UPS, Switchgear, Transformer,Bus duct, Motor Solo Run, Mechanical Run Test, Lighting, HVAC Systems, Punchlist etc.) Site troubleshooting works for HV/LV Switchgear, Transformer, UPS and HV Motor– liaise with vendor (EATON, ABB, SIEMENS, POWERWELL, ELLIOT EBARAand BORRI UPS etc.) To plan and manage commissioning team during Cause & Effect Assessments, liaisewith Owner (GPS). Support Instrument commissioning team for troubleshooting works for CCTV, ACS(Access Card System), FGS (Fire & Gas System) Show less

    • Hyperwave Systems Engineering Sdn Bhd

      Jan 2023 - now
      Senior Project Engineer

      Project Deliverable:• Provision Of Procurement, Construction and Commissioning (PCC) Of CathodicProtection For Refinery Asset Rejuvenation Tiga (RESET) 2.0 Project• PCC For PSR-1 Pneumatic Field Instrumentation Upgrading And Junction Box (FieldPackage) For Refinery Asset Rejuvenation Tiga (Reset) Project At MRCSB TA2024(WP125)• INSTALLATION AND COMMISSIONING ASSISTANCE OF PROMEL FGS CONTROLLER & ACCESSORIES AT COGEN GTG FOR REFINERY ASSET REJUVENATION TIGA (RESET) PROJECT AT MRCSB (WP44B)• PROVISION OF REPLACEMENT OF EXISTING CHECKERED PLATE FLOORING TO GRATING TYPE (PN 110070 GREAT ONE PROJECT) FOR MRCSBJob Scope:• Responsible for the execution, installation and delivery of the entire project andmanage a team.• Responsible for the overall planning, coordination and supervision of all activitiesassociated with projects.• Review each discipline design documents, which includes iso drawing, foundationdrawing, structural drawing, underground facility drawing, single-line diagram,electrical load list, functional descriptions, instruments list, technical specificationsand etc.• Ensure technical compliance from sub-contractors, suppliers and vendors.• Enhance overall environmental, safety and quality work activities to meetmanagement objectives set for the department and customer satisfaction.• Provide technical support and leadership to project and site engineers.• Technical proposal preparation/post bid clarifications.• Process plant design & engineering co-ordination; Lead and manage the developmentand implementation of the Project Execution plan, Project HSE Plan, project set upand close out for each project in accordance to procedure.• Project Management of Engineering, Procurement & Construction Supervisioncontracts with complete emphasis on cost reduction, schedule completion and bestquality.• Management reporting (progress report to top Management/Client). Show less

  • Licenses & Certifications

    • Graduate Engineer

      Board of Engineers Malaysia
      Nov 2018
    • PMP®️ Exam Preparation course

      PEOPLElogy Berhad
      Sept 2025
    • Graduate Technologist

      Malaysia Board of Technologists
      Oct 2019