Débora Dadalt

Débora Dadalt

Administrative Assistant

Followers of Débora Dadalt934 followers
location of Débora DadaltCopenhagen, Capital Region of Denmark, Denmark

Connect with Débora Dadalt to Send Message

Connect

Connect with Débora Dadalt to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer | BIM 5D | Project Cost and Time Management

  • Education

    • Instituto Estadual de Educação Maurício Cardoso

      2009 - 2011

      High school.

    • Federal University of Rio Grande do Sul

      2014 - 2020
      Bachelor of Science (BSc) Civil Engineering

      Specialization in Construction Management and Economics.Final grade average: 9.133 (scale from 0 to 10)Final paper: Comparison between the constructive processes of structural masonry and concrete walls under the aspects of cost and time: case study of a low-income housing development.Text PDF file: https://lume.ufrgs.br/handle/10183/218075Defense video: https://www.youtube.com/watch?v=ntESPUbKwX4

    • FGV - Fundação Getulio Vargas

      2024 - 2025
      Master of Business Administration Project Management
  • Experience

    • Instituto Mundo Verde

      Mar 2012 - Dec 2013
      Administrative Assistant

      ONG Instituto Mundo Verde.Cash, receipts and payments control. Bank account control. Preparation of annual reports. Creation of flyers to publicize events. Creation of institutional videos.

    • Building Innovation Research Unit (NORIE)

      Aug 2015 - Aug 2016
      Scientific Initiation Scholarship

      Scientific Initiation Scholarship in the Construction Management and Economics area at Núcleo Orientado para Inovação da Edificação (NORIE UFRGS). Website: ufrgs.br/ppgec-ci/enResearches using BIM, Lean Construction and Last Planner System. Monitoring of logistic processes on a prefabricated building system construction site, statistic analysis of edifications data and identification and analysis of waste in constructions sites.3D modelling with Revit. Planning with Line of Balance.Abstract and poster published in event: http://hdl.handle.net/10183/154795 Show less

    • Morana Empreendimentos Imobiliários

      Sept 2016 - now

      Responsible for:- Preparing the executive budget and the master schedule of the enterprises;- Monitor the cost and time of the building construction by holding monthly meetings between the construction site teams and the board of directors, issuing analytical reports and indicators, identifying deviations and potential risks, opportunities and trends;- Coordinate the quantity take-off of projects that are send to the construction site managers;- Review monthly the feasibility analysis reports and results of the enterprises;- Preparing sundry cost and time studies/simulations to the board of directors;- Train and manage the planning and cost department team;- Manage and control the documentation of activities related to the cost and planning area, and implement continuous improvement in the department;- Co-responsible for preparing the company's cash flow forecast, identifying potential risks and proposing mitigation strategies;- Establishing modelling requirements and parameterization of information of the projects 3D models for use to elaborate the building construction budget and schedule.Use of BIM 5D, Last Planner System (LPS) and Location-Based Management System (LBMS) in the workflow processes of the department. Show less Assistance in the elaboration of feasibility, budgets and schedules of projects/construction sites. Monitoring of costs and schedule. Establishment of efficient BIM workflows within the company. Use of BIM at the levels of 3D modelling, project compatibility, 4D planning, quantitative and cost extraction (5D). In this position I was able to dive deeper into cost management and refine planning and monitoring tools in collaboration with construction site teams and the board of directors.3D modelling with Revit. Planning with Line of Balance. 4D modelling with Navisworks. 5D with Vico Office. Show less Internship in the areas of feasibility of enterprises, budget, planning and monitoring of projects/construction sites. BIM 5D implementation. Activities mainly carried out at the company's head office. Weekly visits to construction sites, where I was able to learn about different construction techniques and site logistics, which helped me to support and prepare better plans and budgets in the future, as well as improve tools for monitoring project costs and deadlines.3D modeling with Revit. Planning with Line of Balance. 4D modeling with Navisworks. Show less

      • Planning and Cost Coordinator (BIM 5D)

        Jun 2021 - now
      • Engineering Technical Assistant

        Sept 2018 - May 2021
      • Civil Engineering Intern

        Sept 2016 - Aug 2018
  • Licenses & Certifications