
Timeline
About me
Project Manager, Electronic Engineer, PMP®, Siemens Mobility
Education
Tecnológico de monterrey
2013 - 2013Diploma in project management project managementSiemens professional education
2017 - 2017Corporate programee - pm3 project managementCentrum pucp
2014 - 2014Financial accounting for non-specialists accounting and financeSiemens professional education
2013 - 2013Corporate programme - pm4 project managementPontificia universidad católica del perú
1998 - 2005Engineer's degree electronics engineering
Experience
Electronic security systems ess
Jan 2006 - Sept 2007Project engineerProject Engineer Jr. Responsible for the installation and commissioning of fire alarm-detection systems, building management/automation systems (BMS) and security systems for the following projects:• Tower “Real 10” - Enterprise center Camino Real, Lima.• CORMIN facilities (Mining Consortium) – Enterprise center Camino Real – Lima, Perú• Yanacocha mining facilities – Enterprise center Camino Real – Lima, Perú• Picoaga Hotel in Cuzco (four stars) – Cusco, Perú• Barrick mining camp, Pierina mine – Huaraz, Perú.• Retaill and supermarkets Wong/Metro – Lima, Perú• Raura mining facilities – Enterprise center Plaza del Sol – Lima, PerúCommissioning Engineer.Fire detection and alarm systems commissioning engineer for systems based on General Electric's EST-3, Quickstart and Fireshield panels (Edward systems technology) for the following projets:• Costa del Sol Hotel, Jorge Chávez international airport, Lima – Perú.• Ball mil and Sulfide plant laboratory, Cerro Verde mine, Arequipa - Perú.• Mall Plaza Lima Sur, Chorrillos. Lima - Perú.• Libertador Hotel, Arequipa - Perú.• Peruvian Building of the Tax Administration Service. Lima – Perú.Commissioning Engineer.Fire Suppression System commissioning engineer for systems based on ECARO 25 and FM-200 clean agents, Quickstart QS1 (Edward systems technology) and SHP Pro (FIKE) panels for the following projects:• Data Center, Pacifico insurance company. Lima - Perú.• Data Center, Yanacocha mining facilities. Lima - Perú.• Data Center, CORMIN mining facilities. Lima - Perú. Show less
Independant
Oct 2007 - Jun 2008Project engineer / supervisorIndependent Engineer and Supervisor for Siemens BMS projects.
Essac-engineering services sac
Jul 2008 - Nov 2009Team leadTeam lead of Periodical performance test department.Engineer in charge of audit commissioning tests and performance evaluation of fire safety systems, building management/automation systems (BMS) and security systems for the following projects:• Retaill and supermarkets Plaza Vea. Lima - Peru.• Enterprise center Camino Real. Lima - Peru.• Enterprise center Plaza El Sol. Lima - Peru.• Enterprise center El Consorcio. Lima - Peru.• Enterprise center Alto Caral. Lima - Peru.• Enterprise center Cronos. Lima - Peru.• Cement factory “Cemento Andino” Tarma, Junín.• Disposable tableware factory “Pamolsa”. Lima - Perú. Show less
Siemens
Jan 2010 - Jul 2011Site managerSite manager for the Lima Westin Hotel Project.Project scope was design, installation, test and commissioning of:• 2 MV substations.• LV busbar for the whole building (31 floors + 3 basement).• BMS systems.• Fire detection system.• CCTV system.
Siemens
Sept 2011 - nowOverall Project Manager for Metro de Lima - Line 2&4 project. First underground Metro Project in Perú.Project scope is design, installation, test and commissioning of:• 21 Traction power substations.• 37 auxiliary MV substations to feed Passenger stations. • Power SCADA system.• 06 High voltage substations 60/20k.• MV cable rings. Overall Project Manager for Metro de Lima, Line 1 - Refurbishment project. First brownfield Metro Project in Perú.Project scope was design, installation, test and commissioning of:• Fully refurbishment for 4 Traction Power substations, 6 MV auxiliary substations.• Overhead Catenary in 8 new tracks switches along mainline.• Overhead Catenary for 0.5 kms over new viaduct to access depot.• SCADA integration for new improvements and changes. Onshore technical Project manager in charge of the SCADA system for Metro de Lima - Line 2&4 Project.Sub project scope:• Installation, test and commissioning of 64 RTU.• Installation, test and commissioning of 4 OCC.• Direct coordination with offshore team from Italy and Germany.• Contact reference in front of customer and project supervisor for SCADA system. Technical Project manager in charge of the SCADA system for Metro de Lima, Line 1 - Stage 2 Project.Subproject scope:• Design, supply, installation, test and commissioning of 15 RTU.• Design, supply, installation, test and commissioning of 1 OCC.• Software engineering, test and commissioning to include new RTUs into VICOS RSC SCADA software.• Contact reference in front of customer and project supervisor for SCADA system. Project Engineer for the Metro de Lima, Line 1 - Stage 1 Project.Main duties:• Corrections of SCADA system punch list.• Corrections of ventilation system punch list.• In charge of 24 months warranty period.
System Integration Manager
May 2023 - nowOverall Project Manager
Oct 2019 - Jul 2023Overall Project Manager
Aug 2016 - Sept 2019SCADA Technical Project Manager
Dec 2015 - Oct 2016SCADA Technical Project Manager
Jul 2012 - Dec 2015Project Team Engineer
Sept 2011 - Jun 2012
Licenses & Certifications
- View certificate
Cómo superar los sesgos cognitivos
LinkedinApr 2021 Proof of qualification as project manager
SiemensNov 2016Project management professional (pmp)
Project management instituteSept 2015Project manager
SiemensNov 2018
Languages
- spSpanish
- enEnglish
Recommendations
Mariama sanu
Intern Healthcare Representative at Interventional Pain InstituteUpper Marlboro, Maryland, United StatesAdriana castro
Psychology Student at the University of California, RiversideMoreno Valley, California, United StatesYasser aly, ph.d.
Transformation &Change Management AdvisorCairo, EgyptKerushnee moultrey
Debt Review - Relationship manager at AbsaCity of Johannesburg, Gauteng, South AfricaAli ghasemzad
Software EngineerIranDiya vinaik
Analyst - Credit Control & Collections @IHG Hotels & ResortsDelhi, IndiaFrank plasso
Supplement Rx - PresidentSan Clemente, California, United StatesMohini singh
Assistant ManagerMumbai, Maharashtra, IndiaMax de oliveira
Consultor - Representante Comercial - Zona da Mata e Campo das Vertentes - MGJuiz de Fora, Minas Gerais, BrazilVicki xia
Qing Dao Mcdermott Wuchuan offshore engineering Co.,Ltd中国 山东省 青岛
...