
Maksim Letskiy
Team leader

Connect with Maksim Letskiy to Send Message
Connect
Connect with Maksim Letskiy to Send Message
ConnectTimeline
About me
Looking for new opportunities
Education

Higher School of Economics
2009 - 2015Specialist management (management in the production)
Experience

GAZ Group
Aug 2011 - Dec 2012Team leaderDuties:- preparation of an assembly site for the work beginning.- arrangement of operators on a workplace,- control of process of assembly of back bridges and reducers.- quality control of entering details.- replacement of operators , 1. standardization of workplaces of operators, the solution of problems "5 Why",2. - training operators, including to skills of the GAS Production system in the directions: the standardized work; solution of problems on a technique of 1х1 and all types of instructing.3. - personal responsibility for assembly process. Show less

HEINEKEN
Jan 2013 - Oct 2013Trainee position on the shift supervisorDuties:- Ensuring the uninterrupted operation of the filling line in PET packaging- Improvement of standards of changeover (reduction of the changeover time due to transfer of working elements to external readjustment (performed when the equipment produces the previous type of product))- Improvement of equipment maintenance standards (TPM)

Access Mechanisms LLC, U-Shin Russia
Oct 2013 - Dec 2014Production SupervisorDuties: 1. To manage and be responsible for production team work on the production lines, ensure target realization in terms of Safety S, Quality Q, Costs C, Delivery D and Motivation M.2. Ensure Continuous Improvement by daily on job training.3. Promoting of QRQC to reach the quality of the product . 4. Organize production zones according Lean production system5. 80 operators under control Achievements:Productivity of direct labor was increased for 30% on the one of five production lines. ( From 27 operators to 20 operators on the line) Show less

Magna Seating
Dec 2014 - Jul 2015Deputy of production managerDuties: 1. To manage and be responsible for production team work on the production lines, ensure target realization in terms of Safety S, Quality Q, Costs C, Delivery D and Motivation M.2. Ensure Continuous Improvement by daily on job training.3. Promoting of QRQC to reach the quality of the product . 4. Organize production zones according Lean production system5. 200 operators + 2 engineers + 3 production supervisors under controlAchievements:1. Cost of scrap was decreased in 6 times (From 6450 thousands RUB per year to 1080 thousands RUB per year)2. Productivity of direct labor was increased for 30% on the one of five production sites. ( From 33 operators to 22 operators on the site) Show less

Self-Employed
Jul 2015 - Jul 2018Production System ConsultantDuties:- Definition of the strategic objectives of the plant (next 5 years)- Definition of the objectives in the short term (year, month)- Building a system of KPIs for executives- Construction of QMS, using methods such as: QRQC, PDCA, 5 why, statistical methods.- Introduction of pull system at the pilot sites using kanban- Construction of single-piece flow at the pilot sites- Improving production and ergonomics due to the introduction of 5S system- Optimization of the changeover process (SMED)- Providing training on the theory of the production system "lean production"Achievements:LLC "Rostselmash":- Introduction of lean manufacturing technologies- Organization of the flow of single products in the pilot section (assembly of cabins)- Organization of a pulling system "Kanban" in the pilot section (welding section - painting site - main conveyor)- Organization of visual control over the main production indicators and the shortage of components in the pilot section (assembly of cabins)- Advancement of the 5C system in the pilot section (cab assembly) Actual performance of the replacement task for 2 months of work increased from 60% to 100% on a stable basis (during 2 weeks no deviations were observed)LLC "IOMZ":- Introduction of lean manufacturing technologies- Reducing the changeover time on the centerless grinding machine from 4 hours to 15 minutes. By implementing the SMED tool- Increase the productivity by 30% due to the introduction of the "standardized work" tool- Reduction of the order for the production of shafts (oil machine building) from 2 months to 15 days due to the introduction of the tools "value stream map", "flow of single products", "Kanban"- Increase OEE equipment from 50 to 70% through the introduction of the tool "TPM"A lot of others plants with successful result. Show less

Samvardhana Motherson Reydel Companies
Aug 2018 - Feb 2019Production ManagerManaging of the Production:Duties: 1. To manage and be responsible for production team work on the production lines, ensure target realization in terms of Safety S, Quality Q, Costs C, Delivery D and Motivation M.2. Ensure Continuous Improvement by daily on job training.3. Promoting of QRQC to reach the quality of the product . 4. Organize production zones according Lean production system5. 100 operators + 2 production supervisors under control6. Start up of the new projects for VW, Skoda, Renault Show less

Главстрой Девелопмент
Aug 2019 - Jul 2020Chief production systemintroduction of TPS to development sector
Licenses & Certifications

FMEA
Languages
- enEnglish
Recommendations

Stefan liu
Business Analytics Student At Miami UniveristyCincinnati Metropolitan Area
Nancy lee
Global lighting buyers club中国 广东省 广州
Cormac neligan
Farnham Estate Golf & Spa ResortIreland
Alfonso arango osorio
/ Finance / Strategy / Management / Transformation / CFO / Education / Business / LION + 28k /Bogota, D.C., Capital District, Colombia
Joe calo
President, Anton Jae Global, Inc.Annapolis, Maryland, United States
Mohammed razeen
Civil Engineer , BIM modeler , QSDubai, United Arab Emirates
Marica barbieri
Development OfficerAcquaviva delle Fonti, Apulia, Italy
Sadique cheri kuzhiyil
HEALTH SAFETY & ENVIRONMENTAL OFFICER INSTRUMENTATION ENGINEER | NEBOSH IGC (1,2&3) | IOSH ( MS ...Mesaieed, Al Wakrah, Qatar
Shrey saini
Founder/Director of Operations at SUS InfoTech Inc.Burlington, Massachusetts, United States
Nart izhak
Property Supervisor at Better Homes LLCUnited Arab Emirates
Jerhko marangunich
Consultant at Boston Consulting Group (BCG)Lima Metropolitan Area
Lizette scheepers
Senior Graphic Designer and Print Coordinator at Affinity HealthCity of Johannesburg, Gauteng, South Africa
Rafael maia
Engineering Manager | Tribo Offshore @ XP Inc.São Paulo, São Paulo, Brazil
Delfina bertolotti
Product Designer & Buenos Aires General ManagerArgentina
Saiyyam mittal
SDE @ Velocity || IIT Patna 2022Chandigarh, India
Alexander cuadros perez
Technical Application manager at DELA BelgiëAntwerp, Flemish Region, Belgium
Ravinkumar s
Senior Process Executive인도 타밀나두 첸나이
Jessica hall
Co Founder of Future AthleticsDallas-Fort Worth Metroplex
Viv holyoake
UK Corporate Solutions Associate Director at Orrick, Herrington & Sutcliffe LLPGreater London, England, United Kingdom
Suchitra somarajan
Tech Lead at ThoughtLine Technologies Pvt LtdThiruvananthapuram Taluk, India
...