Scott Wilson

Scott Wilson

Inspector

Followers of Scott Wilson1000 followers
location of Scott WilsonLa Porte, Texas, United States

Connect with Scott Wilson to Send Message

Connect

Connect with Scott Wilson to Send Message

Connect
  • Timeline

  • About me

    API Inspector/Project Manager/Lead inspector

  • Education

    • TEPCO

      2021 - 2021
      Intro to Scheduling/Basic T/A Scheduling PASS

      Introduction to scheduling. Primavera.

    • DTM-Enterprises-David McGrath API training school.

      2007 - 2010
      API-570 Piping inspection
    • MSTS-Mark Smith Training Services

      2007 - 2010
      API-510 Pressure Vessel Inspection
    • The Ocean Corp.

      2001 - 2002
      Inspection Non-Destructive testing/Commercial Diving

      Commercial Diving/ NDT inspection.

    • TEPCO

      2021 - 2021
      Intro to Planning PASS

      Introduction to planning.

    • TEPCO Solutions

      2021 - 2021
      Certified P6 Primavera, Turnaround Basic Scheduling PASS

      Understanding of P6- Primavera scheduling for Turnarounds.

    • The Ocean Corporation

      -
    • The Ocean Corporation

      2002 - 2002
      NDT, Commercial Diving. NDT- MT, PT, UT, VT passed
    • Lamar University

      1990 - 1993
    • Lamar University

      1989 - 1994
  • Experience

    • Elliott Services

      Jan 2007 - Dec 2009
      Inspector

      Roving inspector for the Pasadena, Deer Park, La Porte area in Texas. Serviced several of the local Chemical plants keeping their piping and vessels within compliance of code.

    • Intertek

      Jan 2011 - Mar 2011
      API Inspector

      Drum and exchanger inspection for BP- Texas City, TX during the DDU turnaround.

    • TEAM, Inc.

      Apr 2011 - Jan 2012
      Fixed equipment inspector

      Pipe and Vessel Inspector for different refineries and chemical plants.

    • Intertek

      Jun 2011 - Dec 2011
      Asset integrity Inspector/Valero-Houston

      Keep piping inspections in compliance with code.

    • J. L. Lowery and Assoc.

      Jan 2012 - Mar 2012
      Pipe and Vessel inspector

      Fixed equipment inspection for Exxon-Mobil during turnaround at John L. Lowery inspection.

    • Intertek

      Mar 2012 - Apr 2012
      Fixed Equipment inspector

      Inspection of all reactors and associated equipment.

    • Matrix Inspection and Engineering

      Apr 2012 - May 2012
      Pressure vessel inspector

      Pressure vessel inspector for Matrix inspection and engineering at Conoco-Phillips plant wide turnaround.

    • TEAM, Inc.

      May 2012 - Jun 2012
      Pipe and vessel inspector

      Piping Hydro test king!!!

    • Thermal Energy Services Inc.

      Aug 2012 - Oct 2012
      Fixed Equipment Inspector

      Turnaround inspector for plant wide shutdown. Covering ZONE 4 in charge of Utilities and Oxygen plant. Visual, external and internal inspections. Giving recommendations, and following repairs.

    • Construction & Turnaround Specialist, Inc.

      Oct 2012 - Dec 2012
      API 510/570 Turnaround inspector

      Performed inspections on fixed equipment and piping packages for a plant wide shutdown for the CVR, Wynnewood refinery. Inspections were conducted in the ROSE, Crude1 & 2, and the VAC 1 & 2 units.

    • Stronghold Inspection

      Jan 2013 - Feb 2013
      API 510/570 Inspector

      Performed inspections on piping in the GOHT, SRU, TGU and fab shop at the Valero, Texas City Refinery during the 2013 shutdown. Monitored hydro-test and composed reports.

    • Construction & Turnaround Specialist, Inc.

      Feb 2013 - Mar 2013
      API 510/570 Turnaround inspector

      Fixed equipment inspector at Lynodell Houston, Tx. Performing internal visual inspections on towers, drums, and exchangers in the Crude unit.

    • Matrix Inspection and Engineering

      Mar 2013 - Apr 2013
      API 510/570 Turnaround inspector

      Inspection of towers, drums, and exchangers during a plant wide turnaround at Holly-Frontier Refinery in El Dorado, KS.

    • Acuren

      Apr 2013 - Jun 2013
      API 510/570 inspector

      Inspection of Towers, Columns, and Exchangers during the plant wide T/A in the VRU.

    • TEAM, Inc.

      Jun 2013 - Jul 2013
      API 510/570 T/A Inspector

      Performing inspections on fixed equipment and piping in the Unifiner unit during T/A at Citgo refinery in Lemont, IL.

    • Construction & Turnaround Specialist, Inc.

      Jul 2013 - Sept 2013
      API 510/570 T/A Inspector

      Inspection of exchangers, towers and drums in the SRU T/A, at Lyondell Basell, Houston, TX.

    • Matrix Inspection and Engineering

      Sept 2013 - Oct 2013
      API 510/510 inspector

      Pressure equipment inspection for the PCU T/A at Texas City Chemical, for BP in Texas City, TX.Internal inspection of towers, exchangers, components and piping in the BTX unit at Citgo Refinery in Corpus Christi, TX

    • TEAM, Inc.

      Oct 2013 - Jan 2014

      Pressure vessel inspction during PTA - T/A at BP Chemicl Cooper River, in Wando, SC. Internal equipment inspection during T/A for the Alky, FCC, and Gas Con units at Country Mark Refining.

      • API 510/570 T/A Inspector

        Dec 2013 - Jan 2014
      • T/A inspector

        Oct 2013 - Nov 2013
    • IRISNDT

      Nov 2013 - Dec 2013
      570 Inspector

      API 570 piping project for Phillips 66 in Sweeny, TX.

    • TEAM, Inc. UK

      Jan 2014 - Feb 2014
      API 510/50 T/A Inspector

      Inspection of towers and columns during the DHT T/A at Shell Refinery in Martinez, CA.

    • IRISNDT

      Feb 2014 - Mar 2014
      API 510 T/A inspector

      Performed inspections on columns during call out project for Sasol, Houston, TX. Performed inspections on towers and columns at Invista, La Porte, TX during the THF unit T/A. Inspection of heat exchanger bundles and components, supporting the Citgo Refiining T/A in Corpus Christi, TX.

    • Acuren

      Apr 2014 - Jul 2014
      API 510/570 T/A Inspector

      Pressure vessel and piping inspector for the scheduled T/A in the Crude 2 at ExxonMobil in Beaumont, TX.

    • ACTT

      Aug 2014 - Sept 2014
      API 570 Inspector

      Walk down piping packages and sign off on hydro-test for valves.

    • TEAM, Inc.

      Sept 2014 - Dec 2014
      API T/A Inspector

      Inspection and tracking of all PSV'S during the Vitamin Unit and Solvents unit T/A at BASF, in Kankakee. Performed inspections on exchangers, heaters and drums during a T/A at CITGO, in Lemont IL. Followed repairs and performed hydro-test on equipment and piping. Project lead for a 570 Natural Gas piping project for Steel Services, at Georgia Pacific in Wheatfield, IN.

    • Weld Spec

      Jan 2015 - Apr 2015
      API 510 inspector

      Performed inspections on columns and drums during turnaround for the F5 unit at Huntsman Chemical.

    • TEAM, Inc.

      Apr 2015 - May 2015
      API 510 pressure vessel inspector

      Performed inspection on towers, drums and exchangers during the 2015 Hydrocracker T/A at BP Cherry point in Blaine, WA.

    • Little Sioux Corn Processors, L.L.C.

      May 2015 - Jun 2015
      API 510/570 Inspector

      Performed API 510 external inspections on fixed equipment for the Mechanical integrity program.

    • Noltex

      Jun 2015 - Sept 2015
      API 510/570 Inspector

      Performed API 510/570 external inspections on vessels and piping for the mechanical integrity program.

    • Kinder Morgan, Inc.

      Sept 2015 - Oct 2015
      API 510 Turnaround inspector

      Performed internal inspections on towers, drums, and exchangers during the plant wide turnaround at the Yates Gas Plant in Iraan, TX.

    • CVR Energy, Inc.

      Oct 2015 - Jan 2016
      API 510/570 Turnaround inspector

      Pressure vessel inspector for the Alky turnaround at the CVR refinery in Coffeyville, KS. Performed inspections on exchangers, drums, and towers, also followed repairs. Performed inspections for the flange tracker corrosion program in the Alky.

    • CITGO

      Feb 2016 - Mar 2016
      API 510/570 Inspector

      Pressure vessel inspector for the Alky turnaround at the Citgo refinery in Sulphur, La. Performed inspections on exchangers, drums, and towers, also followed repairs.

    • Motiva Enterprises LLC

      Mar 2016 - Apr 2016
      API 510/570 Inspector

      Piping inspector for the VPS1, HTU, CRU turnaround at the Motiva refinery in Convent, La. Performed inspections on piping, reviewed packages, and followed repairs

    • Chevron Phillips Chemical Company

      Apr 2016 - Jun 2016
      API 510/570 Inspector

      Pressure vessel and piping inspector for the Polymers unit turnaround at the CP Chemical plant in Cedar Bayou, TX. Performed inspections on pressure vessels and (High pressure) piping, reviewed packages, monitored hydro test, and generated reports.

    • Goodyear Tires Italia

      Jul 2016 - Aug 2016
      API 510/570 Inspector

      Pressure vessel and piping inspector for the Mechanical Integrity program at the Goodyear chemical plant in La Porte, TX.

    • Valero

      Aug 2016 - Sept 2016
      API 510/570 Inspector

      Pressure vessel inspector for the NSRU turnaround at the Valero refinery in Port Arthur, TX. Performed inspections on exchangers, drums, and towers, also followed repairs. Performed inspections for the flange tracker corrosion program.

    • Dow

      Sept 2016 - Dec 2016
      API 510/570 Inspector

      Inspection lead for the HR2 turnaround at the DOW chemical plant in Deer Park, TX. Co-ordinated NDE crews and API inspection crews. Supervised inspections on super heaters, drums, acid columns, and followed repairs.

    • Pasadena Refinings System Inc.

      Jan 2017 - Feb 2017
      API 510/570 Inspector

      Pressure vessel inspector for the plant wide turnaround at the PRSI refinery in Pasadena, TX. Performed inspections in the SRU on, drums, exchangers and towers, also followed repairs.

    • Navajo Refining Company Lp

      Feb 2017 - Mar 2017
      API 510/570 Inspector

      Inspection of towers and drums in the Alky Unit during the plantwide turnaround.

    • Enterprise Products

      Apr 2017 - Sept 2017
      API 510/570 Inspector/Planner/Scheduler

      Building equipment packages for upcoming T/A's. Research process failure for equipment maintenance. Do call out, travel to satellite locations to perform API inspections on piping and vessels.

    • Shell

      Sept 2017 - Nov 2017
      API 510/570 Pressure Vessel Inspector

      Performed internal inspections on towers, ex-changers, and drums, during the CRU2/HTU-2 T/A.

    • Williams

      Nov 2017 - Dec 2017
      API 510/570

      Inspection lead for the baseline mechanical integrity program at a Williams Energy satellite facility.

    • Valero Energy Corporation

      Jan 2018 - Mar 2018

      Pressure equipment inspector during the SRU T/A. Pressure equipment inspector during the HOC T/A.

      • API 510/570 Inspector

        Feb 2018 - Mar 2018
      • API 510 inspector

        Jan 2018 - Feb 2018
    • PBF refining / Dunn Heat Exchangers Inc.

      Mar 2018 - Apr 2018
      3rd Party Vendor Surveillance

      API 510 inspector for PBF refining at Dunn Heat Exchanger for the FCCU T/A.

    • Chemours Chemical/Washington Works

      Apr 2018 - May 2018
      API 510/570 Inspector

      Inspected vessels and piping circuits during turnaround. Gave recommendations and followed repairs.

    • Huntsman Corporation

      May 2018 - Jul 2018
      3rd party vendor surveillance inspector

      Performed vendor surveillance for Huntsman in Port Neches, Tx., at Metalforms fabrication shop in Beaumont, TX. Followed repairs on heat exchangers for the Ethylene Unit turnaround.

    • Sinclair Oil Corporation

      Jul 2018 - Aug 2018
      510 API Inspector

      Performed inspections, and followed repairs for exchangers, in the Crude/Coker/Reformer, T/A's.

    • Bp

      Sept 2018 - Oct 2018
      API 510/570 Inspector

      Performed internal inspections on equipment for the SRC T/A.

    • ExxonMobil

      Oct 2018 - Feb 2019
      API Piping lead

      Piping and flange inspector for the FCCU T/A.

    • Husky Corporation

      Oct 2018 - Nov 2018
      API 510/570 Inspector

      Performed inspections on exchangers and drums for the Isom and Tetra T/A's.

    • Prsi

      Feb 2019 - Mar 2019
      API 510 Equipment inspector

      API / Turnaround inspection of Equiment and piping.

    • DuPont

      Mar 2019 - Apr 2019
      API 510 Mechanical Integrity Inspector

      External inspection of Equipment during run and maintain. 3rd party inspections ensuring compliance for OSHA requirements.

    • CITGO

      Apr 2019 - May 2019
      Vendor Surveillance Inspector

      3rd party vendor surveillance for Citgo refinery in Corpus Christi, Tx. at Dunn Heat Exchanger in Texas City, TX.

    • Bp

      May 2019 - Jul 2019
      API 510/570 Inspector

      Pressure vessel and piping inspector for Reformer, ISO, Hydrogen, and East Flare T/A's.

    • Chevron

      Aug 2019 - Oct 2019

      API turnaround inspector at Chevron for the SRU T/A on the bundle pad. API 510 inspector for the Amine Sour water/VGO units during turnaround.

      • API turnaround inspector

        Sept 2019 - Oct 2019
      • API 510/570 Turnaround inspector

        Aug 2019 - Sept 2019
    • Bp

      Oct 2019 - Nov 2019
      API 510/570 T/A Inspector

      Inspection of piping and pressure vessels during a scheduled T/A.

    • INVISTA

      Oct 2019 - Oct 2019
      API T/A Inspector

      Inspection of pressure vessels and piping.

    • Shintech Louisiana, L.L.C.

      Nov 2019 - Dec 2019
      API 570 Inspector

      Reviewing and configuring all piping packages associated with the construction of the Ethylene project. Performing quality assurance on all aspects of NDE, Weld quality, and documentation for piping also entering all information into the Shintech electronic interface.

    • Indorama Ventures

      Jan 2020 - Apr 2020
      API 510/Vendor surveillance inspector

      Inspections on exchangers and components at the bundle pad, during the MTBE-PO T/I, at Indorama in Port Neches, TX. Also performed vendor surveillance and followed repairs off site at Ohmstede, in La Porte, TX.

    • Chevron

      Apr 2020 - Jun 2020
      API 510/570 T/A inspector

      Performed inspections on heaters during the Reformer T/A. Followed repairs, and generated reports.

    • Enterprise Products

      Jun 2020 - Sept 2020
      API 510/570 Inspector

      Performed inspections on Reactors and Heaters and large bore pipe (48"-72") in the PDH unit, for an outage. I followed repairs and closed out packages.

    • Chevron

      Oct 2020 - Jan 2021
      Turnaround Piping inspector

      Turnaround Piping inspector at Chevron, for the FCC, YDIB, and Alky T/A.

    • Enterprise Products

      Feb 2021 - Mar 2021
      Piping and Vessel Inspector

      Inspecton of piping and pressure vessels for the PDH Turnaround.

    • Phillips 66

      Apr 2021 - May 2021
      Piping Turnaround Inspector

      Walking down piping packages. Verifying materials, specs, buying off Hydrotest, and reading P&ID's.

    • Sinclair Oil Corporation

      May 2021 - Oct 2021
      API 510 equipment inspector

      Bundle pad inspector for the GDU/Poly T/A.

    • HollyFrontier Navajo Refining LLC

      Oct 2021 - Feb 2022
      API 510/570

      Inspection on piping and vessels for the Crude and VAC Turnaround. Performed inspection on fixed equipment, piping.

    • Valero

      Jan 2022 - Feb 2022
      API Inspector/Planner

      Organizing, and executing inspections for the CCR, and Isooctene T/A's at the Valero refinery in Corpus Christi, TX. Internal VT inspections performed on drums and piping, and all findings entered into the Valero interface.

    • LyondellBasell

      Feb 2022 - Mar 2022
      Vendor Surveillance shop inspector

      Followed repairs on Coke Drums for the Coker T/A at Lyondell, La Porte, TX.

    • CVR

      Mar 2022 - Mar 2022
      Quality Assurance Inspector

      Piping lead for the flange tracking program during T/A at CVR in Wynnewood, OK.

    • BASF

      Mar 2022 - Apr 2022
      API equipment and piping QA

      Equipment and piping QA during T/A for the BASF T/A in Port Arthur TX.

    • Chevron Phillips Chemical Company

      Apr 2022 - May 2022
      Coordinator

      Coordinator for NDE, and QA for all piping packages during the Ethylene T/A.

    • The Mosaic Company

      Jun 2022 - Aug 2022
      QA Supervisor

      Equipment and piping QA for the Ammonia unit T/A, at Mosaic fertilizer plant in St. James, La.

    • Cenovus Energy

      Jul 2022 - Sept 2022
      Project Lead

      Inspection Planning Lead

    • Phillips 66

      Sept 2022 - Nov 2022
      API 510/570 Inspector

      Performing inspections on pressure vessels and piping during T/A.

    • LyondellBasell

      Nov 2022 - Apr 2023
      Complex Inspector over QE-1 at LPO

      Complex inspector at the LPO for QE-1 unit.

    • Westlake

      May 2023 - Jun 2023
      API 510/570 T/A Inspector

      Performed inspections on pressure vessels and piping during the plant wide outage. The units included, the Ethylene unit, Poly Vinly Chloride, Chlorine, and Monomers.

    • AltaGas Ltd.

      Jun 2023 - Aug 2023
      Mechanical Integrity Inspector

      Performed inspections on equipment and PSV's at the LPG terminal for AltaGas in Ferndale, WA. Helped keep the facility in compliance with OSHA regulations.

    • Formosa Plastics Corporation, U.S.A.

      Aug 2023 - Oct 2023
      Mechanical Integrity Piping

      Inspection of piping circuits, reporting and following repairs.

    • Air Products

      Oct 2023 - Dec 2023
      API Inspector QA

      Performing QA duties, signing off on piping and equipment, packages. Witnessing gasket drops and Torques and procedures.

    • Valero

      Jan 2024 - now
      Vendor Surveillance Inspector

      Vendor surveillance for Valero Refinery in Port Arthur, TX. at the Dunn Heat Exchanger facility in Texas City, Tx. Inspection of Heat Exchangers and monitoring repairs, supporting the Valero T/A.

  • Licenses & Certifications

    • API 570 Piping inspector

      American Petroleum Institute
      Jul 2010
    • 510 Pressure Vessel Inspector

      American Petroleum Institute
      Jul 2008