Muhammad Nihas, PMP®, QMS

Muhammad Nihas, PMP®, QMS

Mechanical Engineer

Followers of Muhammad Nihas, PMP®, QMS596 followers
location of Muhammad Nihas, PMP®, QMSJeddah, Makkah, Saudi Arabia

Connect with Muhammad Nihas, PMP®, QMS to Send Message

Connect

Connect with Muhammad Nihas, PMP®, QMS to Send Message

Connect
  • Timeline

  • About me

    Mechanical Manager at Water and Environment Technologies company -WETICO

  • Education

    • University of Calicut

      2010 - 2014
      B-tech Mechanical Engineering
  • Experience

    • L&T Technology Services Limited

      Aug 2014 - May 2016
      Mechanical Engineer
    • Global Environmental Management Services Ltd.

      Jun 2016 - May 2017
      Mechanical Engineer
    • SEPCOIII Electric Power Construction Co., Ltd.

      May 2017 - Oct 2022

      The project involves the construction of a water desalination plant dubbed 'Jubail Independent Water Project - Phase 3A' in Jubail, Saudi Arabia under an initiative taken up by Saudi Water Partnership Company (SWPC). The plant will be designed for a potable water capacity of 600,000 cubic meters per day (m3/day) using reverse osmosis seawater desalination technology. The IWP will be located 18 km south of the Jubail Industrial City, adjacent to the existing plant units (Jubail Phase 1, Jubail Phase 2, and Jubail RO plants), in the Eastern Province of the Kingdom of Saudi Arabia.Independent Water Plant Jubail 3A comprising of 600 MLD RO-Desalination Plant and its captive 44.4 MWp Solar PV Plant. The Project will supply potable water to the cities in Eastern Province of Saudi Arabia and also to Riyadh City Show less The project involves third phase construction of an independent water and power plant (IWPP) with a generation capacity of 2,500 megawatts (MW) and a desalination capacity of 550,000 cubic metre per day to be located on the Red Sea coast, in the Yanbu Industrial City, approximately 350km north of Jeddah. The desalination plant will implement multistage flash (MSF) technology to desalinate and supply fresh water to the residents of Yanbu and the nearby Medina region.The power plant will include five 620 MW units equipped with Heavy Fuel Oil (HFO) fired supercritical boilers, steam turbines, generators(Construction (5 x 627MW) Supercritical boiler power plant contains 5Boiler + 5 Stem Turbines + 5 Generators), electrostatic precipitators, and flue gas desulphurization system. Show less

      • Mechanical Engineer

        Dec 2020 - Oct 2022
      • Mechanical Engineer

        May 2017 - Dec 2020
    • Fichtner Consulting Engineers Ltd

      Sept 2022 - Mar 2024
      Mechanical Engineer

      The project involves the construction of phase 5 of the desalination plant located in Shuaibah, Jeddah, Saudi Arabia. The plant will have a capacity of 600,000 cubic meters per day of water and is being developed under the ownership of Saline Water Conversion Corporation (SWCC). The contract scope covers retrofitting ends of a life desalination plant. The work will entitle the replacement of technologies and assets with an expired life span. The project will also include the construction of a dosing station, the installation of high-pressure pumps, pipelines, a membrane unit, pressure exchangers, and related instrumentations, the installation of an onsite system including a remineralization system, carbon dioxide dosing system, and a CO2 production plant Show less

    • Water and Environment Technologies Company - WETICO

      Mar 2024 - now
      Mechanical Manager
  • Licenses & Certifications

    • ASNT NDT Level II (ASNT)

      ASNT (The American Society for Nondestructive Testing)
      Jan 2014
    • Project Management Professional (PMP)

      Project Management Institute
      Aug 2024
    • ISO 9001:2015 Lead auditor quality management system

      IRCLASS Systems and Solutions Pvt. Ltd
      Apr 2023
    • Mechanical Engineer

      Saudi Council of Engineers
      Jun 2021