Masda Rohal Sadiq

Masda Rohal Sadiq

Graduate Development Program (Mine Engineer)

Followers of Masda Rohal Sadiq2000 followers
location of Masda Rohal SadiqKecamatan Sangatta Utara, East Kalimantan, Indonesia

Connect with Masda Rohal Sadiq to Send Message

Connect

Connect with Masda Rohal Sadiq to Send Message

Connect
  • Timeline

  • About me

    Senior Mining Engineer di PT. Kaltim Prima Coal

  • Education

    • Universitas Sriwijaya

      2007 - 2011
      Bachelor Of Engineering (B.E) Mining Engineering
  • Experience

    • Petrosea

      Mar 2012 - Sept 2012
      Graduate Development Program (Mine Engineer)

      Responsibilities :(1) Monitor loading point, haul road, and dumping point regularly with Pit supervisor according to the plan (Pit monitoring)(2) Calculate daily haul distance (loading point to dumping point) using Minescape 4.118 software and make a reconcille to the owner(3) Prepare and facilitate daily meeting with owner to discuss progress and any issue related to production and safety(4) Update and report both daily volume and digger's position(5) Reporting digger's teeth bucket usage (6) Make a monthly report to Jakarta related graduate's progress (7) Monthly presentation as a graduate's responsibilty(8) Supervise the operator and arrange the unit’s production in the beginning of shift(9) Work with the surveyors to contribute to the compilation of monthly progress claims.(10) Assist with the accurate and timely production of the monthly, weekly and daily reports.(11) Work to attain a very high proficiency in the use of mine planning software. Show less

    • PT. Kaltim Prima Coal

      Sept 2012 - now

      Responsibilities :(1) Designing blast plan and develop blasting method using MINEX Software (2) Designing initiation of daily blast plans (Tie Up, Delays, etc) using JKMRC 2D Bench.(3) Coordinate drill and blast activities with key personnel to meet business needs (ORICA, SANVICK, Mine Surveyor, Pit Operation, Drill and Blast Supervisor, etc)(4) Create loading sheet design for each blast plan (explosive and stemming).(4) Calculate the number for blast accessories (inhole delay, surface delay, booster, etc) for each blast plan.(5) Update daily broken boundary and calculate the broken inventory per level of elevation.(6) Reconcile actual daily blast (actual holes, actual explosive usage, actual blasting volume)(7) Reconcile weekly explosive usage for actual blasting compared to weekly blast plan.(8) Ensure the explosives distribution meet the target.(9) Manage and control blast activity at KPC (Pit Hatari, weekly ANFO consumption).(10) Control and improve blast result related to shovel productivity and wall condition.(11) Coordination with Pit Technical Engineer to make a good drill and blast sequence (Daily & Weekly meeting).(12) Coordination with Blast Supervisor to reach the target and make sure the blast plan is applied correctly.(13) Supervise ORICA and KPC Blasting Crew Show less Responsibilities :(1) Monitor Dump activity to meet with weekly plan and environment standard requirement(2) Daily meeting with shortem team in case to disscus short term's dump strategy (3) Controlling actual cycle time of truck to produce optimal overburden production(4) Ensure the number of truck vs digger available are enough to reach match factor for each dumping point.(5) Coordinating with operation section to control actual distribution of waste material from loading point(6) Prepare weekly short term plan for dumping sequence and calculate truck cycle time for weekly plan using TALPAC(7) Create PAF/NAF boundary and make dumping sequence for PAF/NAF material to reach PT KPC rehab specification area.(8) Conducted high dump and in pit dump(9) Implement daily and weekly plan for pit for drill pad, overburden, and coal expose(10) Work together with geologist, drill & blast and survey to provide detail development and blasting(11) Coordination with geotech and long term planning regarding design and geotechnical issue(12) Daily presentation to the manager and superintendent Show less Responsibilities :(1) Reserving and Scheduling target production by weekly Forecast for Eight Week Rolling Plan (8WRP) based on last short term sequence, manage detail strategy of mine sequences(2) Provide daily, weekly and monthly of Mining Operation Division production and equipments perfomance reports to Board of Director(3) Create Minvu engine to collect needed data from Minvu database. Provide requested data and analysis from others(4) Create Final cost report related to all Pit's cost and make an analysis(5) Make cost correction from all equipment’s fuel consumption and reconcile it to other department (6) Make an analysis and justification of over budget for monthly cost (7) Update monthly balance score card regularly Show less Responsibilities :(1) Direct and oversee weekly top soil removal & weekly hectare rehabilitation plan within each Pit and Ensure the availability supporting tools, equipments, and personnel(2) Ensure that quality of top soil removal is in accordance with the KPC’s requirements and that top soil works are ahead of overburden works(3) Monitor land clearing procedures to ensure that the tasks are performed correctly and safely(4) Ensure that dump reshaping is properly designed and constructed.(5) Prepare any material to support operation (e.g. digging limit, etc) with Minex 6.1(6) Actively search for options to optimize production by finding new close stockpile locations and potential final dumps.(7) Monitoring the mining operation to ensure that the plans are followed by operation section.(8) As auditor with environment department in waste dump feasibility.(9) Help Superintendent by ensuring that on a weekly basis you are reviewing top soil dumping locations and advise to constantly minimize haul cycle times.(10) Liaise with the Pits, Environment, Civil Engineering, and Exploration and Mine Planning Department to ensure that rehabilitation works are being carried out satisfactorily and to KPC standards Show less Responsibilities :(1) Designing blast plan and develop blasting method using MINEX Software (2) Designing initiation of daily blast plans (Tie Up, Delays, etc) using JKMRC 2D Bench.(3) Coordinate drill and blast activities with key personnel to meet business needs (ORICA, SANVICK, Mine Surveyor, Pit Operation, Drill and Blast Supervisor, etc)(4) Create loading sheet design for each blast plan (explosive and stemming).(4) Calculate the number for blast accessories (inhole delay, surface delay, booster, etc) for each blast plan.(5) Update daily broken boundary and calculate the broken inventory per level of elevation.(6) Reconcile actual daily blast (actual holes, actual explosive usage, actual blasting volume)(7) Reconcile weekly explosive usage for actual blasting compared to weekly blast plan.(8) Ensure the explosives distribution meet the target.(9) Manage and control blast activity at KPC (Pit Hatari, weekly ANFO consumption).(10) Control and improve blast result related to shovel productivity and wall condition.(11) Coordination with Pit Technical Engineer to make a good drill and blast sequence (Daily & Weekly meeting).(12) Coordination with Blast Supervisor to reach the target and make sure the blast plan is applied correctly.(13) Supervise ORICA and KPC Blasting Crew Show less

      • Senior Mining Engineer

        Oct 2016 - now
      • Drill & Blast Engineer

        Aug 2015 - Oct 2016
      • Short Term Planning Engineer

        Nov 2014 - Aug 2015
      • Data Analyst & Cost Control Engineer

        Jul 2014 - Nov 2014
      • Mine Rehabilitation Planning Engineer

        Mar 2014 - Jul 2014
      • Drill & Blast Engineer

        Sept 2012 - Mar 2014
  • Licenses & Certifications

    • Pengawas Operasional Pratama (POP)

      Ministry of Energy and Mineral Resources (ESDM)
      Mar 2017
    • Minex 6.1.3 Specialization for Drill & Blast

      GEMCOM LIMITED
      Apr 2013
    • Kursus Juru Ledak Kelas 2

      Ministry of Energy and Mineral Resources (ESDM)
  • Honors & Awards

    • Awarded to Masda Rohal Sadiq
      Speaker at TPT Perhapi XXX 2021 Perhapi Oct 2021 OPTIMALISASI WAIT FOR BLASTING TIME BAGI ALAT GALI MUAT DENGAN PENDEKATAN ANALISA SIGNATURE HOLES DI PT. KALTIM PRIMA COAL
    • Awarded to Masda Rohal Sadiq
      🥇 Awards The 1st Best Paper at TPT Perhapi XXX & Kongres XI Perhapi 2021 Perhapi Oct 2021
    • Awarded to Masda Rohal Sadiq
      🥈 Awards The 2nd Best Presenter at TPT Perhapi XXX & Kongres XI Perhapi 2021 Perhapi Oct 2021
    • Awarded to Masda Rohal Sadiq
      🥈 The 2nd Winner of Perhapi Kutim Paper Contest 2021 Perhapi Kutim Oct 2021
    • Awarded to Masda Rohal Sadiq
      Officially Half Marathon 21 km Finisher Maybank Bali Marathon 2020 (virtual event) Nov 2020
    • Awarded to Masda Rohal Sadiq
      Speaker at TPT PERHAPI XXIX 2020 Perhapi Nov 2020 IMPLEMENTASI BOTTOM AIR DECK DAN EXPAND PATTERN SECARA TERINTEGRASI DALAM RANGKA OPTIMALISASI PENGGUNAAN BAHAN PELEDAK DI PIT SOUTH PINANG PT. KALTIM PRIMA COAL
    • Awarded to Masda Rohal Sadiq
      Officially Full Marathon 42km Finisher Pocari Sweat & Bandung Marathon 2018 Jul 2018
    • Awarded to Masda Rohal Sadiq
      Awards as “The Best team member” at Membara Project Transformation phase 1 (MOD PT. KPC) PT Kaltim Prima Coal Oct 2016
    • Awarded to Masda Rohal Sadiq
      Student's Scholarship - 1. (2010-2011) Peningkatan Prestasi Akademik (PPA) Scholarship 2. (2010-2011) Province Of Jambi Scholarship 3. (2009-2010) Peningkatan Prestasi Akademik (PPA) Scholarship 4. (2009-2010) Bantuan Khusus Mahasiswa (BKM) Scholarship 5. (2008-2009) Province Of Jambi Scholarship 6. (2007-2008) Bantuan Belajar Mahasiswa (BBM) Scholarship