Sinem Kumsar

Sinem Kumsar

Process Engineering Intern

Followers of Sinem Kumsar3000 followers
location of Sinem KumsarAliağa, İzmir, Türkiye

Connect with Sinem Kumsar to Send Message

Connect

Connect with Sinem Kumsar to Send Message

Connect
  • Timeline

  • About me

    Chemical Engineer (BSc.) & Welding Engineer (MSc.)

  • Education

    • Aliaga cumhuriyet lisesi

      2005 - 2009
      Associate of Science (A.S.) Science
    • Hitit Üniversitesi

      2010 - 2015
      73.6 Chemical Engineering Programs :Matlab (calculate software), Chemcad (dizayn software) , Aspen (dizayn
  • Experience

    • TUPRAS

      Jul 2012 - Aug 2012
      Process Engineering Intern

      Hyrocracker komplex 8000 unit (vacumm distillation unit, hydrocracker reaction section unit, hydrocracker fractionation unit, hydrogen product unit, visbreaker unit, gas amin treating unit, sulphur recovery unit, sour water stripping unit)Duties: • Reseach about the tools, methodologies and processes and find out solutions to improve production efficiency and report the findings to the organization.• Calculating the workspace requirements and should design strategies to utilize the workspace effectively.• Calculating the production cost, time involved, existing production resources, human resources and do a proper estimate and recommend it to the organization and also estimate upcoming manufacturing requirements and help the management to take right decisions.• Getting and submitting details to the management with statistical data which in turn help management to clearly identify the future requirements of manufacturing. Show less

    • Petkim

      Aug 2013 - Sept 2013
      Process Engineering Intern

      Acrylonitrile factory (reaction unit, recovery unit, distillation unit)Duties: • Analyzing the manufacturing methods, production processes and also the production schedule involved in delivering the project.• Carrying out research and creating new methods of manufacturing processes and recommend the organization to achieve maximum production capacity and efficiency.

    • Ilk Construction Co.

      Jan 2016 - Sept 2016
      Quality Assurance Quality Control Engineer

      ILK CONSTRUCTION (Association of Egean Star Refinery Project)Quality Control (at Workshop – Piping Installation) Dates (June 2016 – September 2016)Duties: İlk İnşaat (Ege Star Refinery Project) Quality Control Engineer • Monitoring and recording of the NDT tests of physical and chemical source regions of the pipes produced (audit plan and records). Perform the final checks of finished production and finished tests. Control of the input of the source information on the isometry into the system (weldlog/diameter, thickness, welding type, welder ...). ** Preparing Request of NDE tests. (Positive Material Identification Test, Welding Heat Treatment-heat treatment test, Hardness test, Radiographic examination-X-ray test, Penetrant paint test, Magnetic Particle Inspection, Ultrasonic test, Phase Sequence). To make the product ready for sale. Necessary fabrication correction, isometry correction and testing. Show less

    • Tekfen Construction

      Oct 2016 - Mar 2018
      Technical Document Controller Specialist

      Dutiy :Document Control Specialist* Control of documents, registration (transmittal log) and distributionDocuments (Test Package(line list/reinstatement), Loop Folder, Quality packages (welding history sheet/Ndt reports), Procedure, Instructions, Plan, Isometric Drawing and P & ID, Method Statement, Specifications, Instructions...)

    • Cera Cosmetic

      Mar 2018 - Jul 2018
      Regulatory Affairs Specialist & Quality System Cheff & Production Planning Asistant

      Duties : Quality Assurance Tasks: • Quality Assurance ISO 9001: 2015 Quality Management System and internal audit (ISO 22716 and GMP) documents preparation (quality manual, procedures, instructions, forms, quality control experiments manual) general drafts and Document Management infrastructure ( sales, purchasing, production, shipment, quality control, quality guvence, unsuitable product, regulating activity ... registration and forms of the instructions of all activities (risk, probability, risk). Observatory Director: The agreement of the experiments lab. a) Preparation and monitoring of the product information to the Ministry of Health in the UTS system and the CPNP portal (formula, label, art work photograph, alergen certificates ...) Preparation of the product information file (product safety assessment) • Investigation of the new formula and development of the formula • Production capacity and production plan calculation, stock follow-up • Preparing a prescription for production (lot / lot production) researching new product forms, creating an inventory of the product inventory card (raw material, packaging, product), patent-product registration application, the necessary ventilation system for the operating license fire system water system electrical transformer natural gas line operations such as production, product tracking and traceability serial production lot quality control no GTlN no codes to determine, capacity feasibility study. Show less

    • Osel ilaç

      Aug 2018 - Nov 2019
      Validation Specialist

      QA / QC (Quality Assurance / Quality Control) Engineer Tasks: Quality Assurance document control and QMEX counterpart to QDMS program, hard copy distribution and recovery of old revision. In the product file; Mass Production Record and Quality Control Physics (packaging) Chemistry Lab (substance identification and active substance amount) Microbiology Laboratory (pathogenity and microorganism count) report results control, production order and packing order control, process control form, green acceptance label, finished product delivery form, serial production record attachments (weighing note, autoclave output, sterility card label, water test fisi, optical control machine output) yield, etc. The accuracy of calculations, product sales approval Erp program Uyumsoft (Product Release). The product is validated according to the change control procedure when the product is moved to the serial size in the product or the licensed product. Process Validation(drug dose lot no in production method,interim analysis in test method and compliance with finished product analysis limits) protocol and report are published. Following the weekly production plan, I made 3 series product validation to shift supervisors. I performed the tests of equipment qualification (empty equipment)and its validation (product-based and non-productive smoke difference effect )and presented its report. I actually did the autoclave and tunnel validation. (I have calibrated in the Kaye Validator,Kapton probe,T.probe, Reference probe and recording bath.)By following the measurements of heat distribution ,I followed the assurance of the operation that the equipment provided sterility and the process sufficiency(CpK) as a result of the calculations of fo values. I have done the validations of ventilation (hvac hepa filter performance to the operators. I followed your reports. Show less

    • Polifarma

      Mar 2020 - Dec 2020
      Validation Specialist

      For process validation; weekly production plan, production process, quality control (chemistry and microbiology) analysis results follow-up, sample plan Preparation of Process Validation protocol and report, Preparation of Process Validation and Bulk Holding Time procedure, in line with the annual production plan and a new license has been obtained / R&D trial production, charging Addition and implementation of new process validations to the Master Validation plan as a result of change control such as enlargement, raw material supplier change. Announcement for revision of production batch records as a result of Process Validation.For the new facility installation (BFS); Supporting URS, FRA, HLRA, IQ, DQ, OQ, PQ, QP Qualification protocol and reports, test form, visualization, ... studies. Show less

    • FENERMEKANİK ELK.İNŞ.LTD.ŞTİ.

      Feb 2021 - Sept 2021
      Quality Control Responsibility

      Fener Mechanical (STAR-PETKIM Maintenance, Planned Downtime and Manufacturing-Project Works)(Quality Control/Planning Engineer)Final Quality File of the Project (Assembly-Manufacturing Procedures and Instructions, Methods, Quality Control Plans, Hydrotest package weldlog, material entry control, WPS, PQR, WQT, certificates, Paint reports, PED certificates, Electrical-Construction plan and quality control reports...) NFI, field control forms of non-compliance keeping tracking log, work log tracking planned posture, and field equipment-flange preparation for labeling the card,Shutdown and control of the equipment to be maintained in the field before flanslari startup after the receipt of the blind control, NDT jobs, the demands of writing and the results of the log statement from eclipse, welder qualification and welder certificates and reports for the recovery of the printing and keeping log of cards and new qualification test plan providing support, pressure gauge, welding machine,Libra,hilogauge...calibration tracking, Mar (welding wire, valve, pipe, elbow,reduction, LET, PAD, pump..preparation of the material request). Show less

    • Clean Tank Engineering

      Sept 2022 - Nov 2023

      Clean Tank Engineering (STAR-PETKIM-Facilities Maintenance, TA, Welded manufacturing in project works, installation, hydrotest and paint works follow-up-Quality and Field Engineer)*Control of the publication and closure of all NFIs according to the ITP of the project.*Daily DWR writing and VDI tracking.* Preparation of Quality Final File (ITP, pqr-wps control, test package preparation, Weldlog preparation, P&ID control, Isometry as-built control, material request and MIR entry control forms, material certificates control, NDT reports control, Inspector documents control, FQD cover and index preparation)*Control of certificates of materials received from the offer.* Control of the materials received for the project and publication of the MIR.* Making project and maintenance NDT requests and checking the results* Collecting welder certificates, welder tests and reports from the work done in the last 6 months to make the current qualifications of welders valid, extending the dates of the documents. Processing into the EBA system. Keeping a log * Monitoring of calibrations and control and extension of certificates.* In turnaround stops; flange disassembly-assembly control, blanking-blind receiving cards to prepare. To participate in the front-of-stand exploration and to add additional orders determined during the stand in the field. To keep a log and provide tracking. To keep weldlog in welded production and to follow up NDT requests and results from the field. Show less Clean Tank Engineering (STAD Storage Facility -Maintenance, Welded manufacturing in project works, installation, hydrotest and paint works follow-up-Quality and Site-Planning Engineer)* According to the maintenance orders, the maintenance engineer is provided with materials (gasket, flange, lamina, gusset, etc.), making scaffolding, crane, menlift requests.* Publication of daily reports showing the completion status of the works and the actions taken according to the common format created at the request of the maintenance engineer.* Planning the related disassembly-assembly on site and planning and accompanying the necessary NDT requests (in the workshop / on site) and tracking the results. To stay in touch with the quality engineer related to the processes and to find common solutions to the problems that arise in the field.*Providing material supply for hydrotests and preliminary control of the line and selling the work to the quality engineer together with the test package on site.* Workshop productions and field progress status summary sheet tracking and planning of processes.*Total disassembly-removal of installation equipment quantities and welded manufacturing piping meters and hydrotest meters.* Making presentations of finished works. Show less

      • Quality Engineer

        Nov 2021 - Nov 2023
      • Field & Control Engineer

        Sept 2022 - Sept 2023
    • Princeps Legem LLC

      Oct 2023 - now
      Turnaround Engineer
  • Licenses & Certifications

    • Environmental Management Systems Lead Auditor (iso 14001)

      QP Kalite Üretim Sistemleri Eğitim Danışmanlık
      Jul 2019
    • 22000: Food Safety Management System Basic Training

      Artıbel Belgelendirme
      May 2012
    • ISO 14001: Environmental Management System Basic Training

      Artıbel Belgelendirme
      May 2012
    • 9001:Quality Management System Internal Auditor Training

      Artıbel Belgelendirme
    • Food Safety Management Specialist Certification (HACCP & BRC & iso 22000)

      QP Kalite Üretim Sistemleri Eğitim Danışmanlık
      Jul 2019
    • ISO 9001: Qualitiy Management System Basic Training

      Artıbel Belgelendirme
      May 2012
    • GC (Gas Chromatography) and HPLC (High Performance Liquid Chromatography)

      Etc-consultancy
      Oct 2016
    • OHSAS 18001: Occupational Health & Safety Management Basic Training

      Artıbel Belgelendirme
      May 2012
    • Quality Assurance Specialist Certificate Programme

      QP Kalite Üretim Sistemleri Eğitim Danışmanlık
      Jul 2019
    • ISO 10002: Customer Satisfaction Management System Basic Training

      Artıbel Belgelendirme
      May 2012