Jordan West

Jordan West

Project Engineer/ Field Engineer

Followers of Jordan West2000 followers
location of Jordan WestTampa, Florida, United States

Connect with Jordan West to Send Message

Connect

Connect with Jordan West to Send Message

Connect
  • Timeline

  • About me

    Area Manager at ORION

  • Education

    • University of North Florida

      -
      Construction Management
  • Experience

    • Liberty Building Forensics Group/ Liberty Building Diagnostics

      Nov 2005 - Apr 2008
      Project Engineer/ Field Engineer

      Inspection and documentation of building envelope and HVAC systems failures and corrections to support claims and litigations. Work on the side of both owners and contractors.

    • Orion Marine Group

      May 2008 - May 2021

      2019 - 2021: BTI Partners - Westshore Marina District - Demolition of an existing mole pier and associated floating docks, dredging of the marina basin of 36,000 cubic yards, construction of 1,800 LF of revetment shore protection.2019: Kinder Morgan - Emergency Crane Barge Salvage - Emergency project to salvage a sunken crane barge from the channel including stabilization of a sunken Clyde crane barge, diesel fuel removal from submerged tanks, par-buckle and refloat of sunken Clyde crane barge, debris recovery and environmental protection.2019-2020: Mosaic Company - Port Sutton Dock & Sea Wall Remediation - Construction of new anchored SSP bulkhead wall with concrete encapsulation. Wall supported by grouted soil anchors. Installation of a new concrete loading platform and ammonia unloading arm. Installation of articulating scour protection mats.2018-2019: Canaveral Port Authority - North Cargo Berth 8 Improvements - Construction of a new berth at North Cargo Berth 8 consisting of deep and shallow steel sheet piling and combination wall consisting of steel pipe and sheet piles with concrete encapsulation, concrete pile supported relieving platform, monopile shore and off-shore mooring dolphins, dredging, above and below water articulated slope protection mats, fenders, mooring fixtures, berth utilities, and miscellaneous demolition and earthwork. Show less 2018-2019: Canaveral Port Authority - North Cargo Berth 8 Improvements: Construction of a new berth at North Cargo 8 consisting of deep and shallow steel sheet piling and combination wall with concrete encapsulation, concrete pile supported relieving platform, monopile shore and off-shore mooring dolphins, dredging, above and below water articulated slope protection mats, fenders, mooring fixtures, berth utilities, and miscellaneous demolition and earthwork.2016-2017: Lincolnshire Maximo - Maximo Marina: Redevelopment of the Maximo Marina, including demolition of all existing docks and roof structures, installation of new SSP bulkhead wall with concrete encapsulation, installation of new fixed and floating dock structures, installation of boat lifts, installation of new steel roof structures over all docks, installation of new fueling pier and fueling system, civil site work and asphalt paving.2015-2016: Mosaic Company - Big Bend Terminal Bulkhead Encapsulation: Installation of a new concrete encapsulation recessed within the tops of the existing circle cell bulkhead. Installation of new steel pipe piles to vertically support the new concrete cap, various underwater repairs to the cell structure, installation of a submerged cantilever toe wall, installation of 22 new fenders and UHMW banding rub wall. 2014-2015: Florida Department of Transportation - SR 415 Bridge over St. John's River: Demolish and replace center bridge spans over the St. John's River. Show less 2008-2009: Howard Frankland & Gandy Bridge Rehabilitation - Installation of pile jackets and impressed current cathodic protection systems on footers and columns.2009: USCG St. Petersburg - Installation of a combi-wall breakwater wall and cast in place concrete cap, installation of rip rap along existing seawall and new breakwater wall, installation of concrete pile supported floating docks and aluminum gangways.2009-2010: Dona & Roberts Bay Bridge Replacements - Installation of temporary work trestle for demolition of two existing railroad bridges, installation of 16" round concrete pile, cast in place caps, prestressed slabs, cast in place concrete deck topping. All concrete was colored to resemble historic creosote railroad trestle. Installation of rip rap, base material, and asphalt paving to tie into existing pedestrian trail at each approach.2010-2011: Marco Island Bridge - Substructure for new Southbound Judge Jolly Bridge including drilled shafts, footers, columns, caps, & beam setting.2011 - 2012: Sharpes Ferry Bridge - replaced historic swing pony truss bridge with fixed 3 span concrete vehicular bridge & restoration of the historic bridge that was re-installed as a pedestrian bridge. First project in the state of Florida to utilize GeoFoam embankment in lieu of surcharging soil. Show less

      • Senior Project Manager

        Jan 2019 - May 2021
      • Project Manager

        Jan 2015 - Jan 2019
      • Assistant Project Manager

        Jun 2013 - Jan 2015
      • Project Engineer

        May 2008 - Jun 2013
    • The Middlesex Corporation

      May 2021 - Oct 2021
      Senior Project Manager

      2021: Brightline Trains - Brightline Zone 2 (3.5 miles) GOAA Rail Infrastructure - Clearing & grubbing, excavation & disposal of unsuitable soils, embankment & grading, utility adjustments, surface water management systems, pump stations, railway and highway structures construction, roadway construction, ballasted and direct fixation track construction, construction of a Railroad Fiber Optic network, and railroad signals systems construction. 2021: Tampa Hillsborough Expressway Authority: East Selmon Slip Ramps Design Build - Addition of a new ingress ramp onto the westbound Reversible Elevated Lanes from the westbound Local Lanes west of the I-75/Selmon Expressway Interchange. Add a new egress ramp onto the westbound Local Lanes from the REL east of the I-4 Connector, ending at the CSX overpass bridge. Mill and resurface full width mainline. Install wrong way driving gates and infrastructure. Resurface and restripe southbound I-4 Connector off-ramp onto westbound Selmon local lanes. Show less

    • ORION

      Oct 2021 - now
      Area Manager

      NASA Causeway Bridge Replacement 2021 - 2025Jay-Jay East and NASA Causeway Shoreline Repairs 2023North Cargo Berth 4 2023 - 2024Hugh K Letherman Terminal Extension 2025

  • Licenses & Certifications

    • Standard First Aid, CPR and AED

      OnSite Health & Safety Services LLC
      Feb 2021
    • OSHA 30 Hour

      ClickSafety
      May 2019
    • Advanced Maintenance of Traffic

      Florida Department of Transportation
    • Florida Phosphate Producers Contractors

      Polk State College
    • Florida Certified Stormwater Inspector

      Fla State Of Fdep
      Mar 2010
    • OSHA 10 Hour

      Osha
      Jul 2015
    • Transportation Workers Identification Credential

      Transportation Security Administration (TSA)
      Apr 2021
    • Project Management Professional (PMP)

      Project Management Institute