Abu Bakar S.

Abu Bakar S.

Trainee Reservoir Engineer

Followers of Abu Bakar S.3000 followers
location of Abu Bakar S.Oman

Connect with Abu Bakar S. to Send Message

Connect

Connect with Abu Bakar S. to Send Message

Connect
  • Timeline

  • About me

    Petroleum Engineer | MWD Engineer | Field Airloop Engineer | Well Testing | Well Completion | TCP | Stimulation | Safety Engineer

  • Education

    • Balochistan University of Information Technology, Engineering and Management Sciences, Quetta

      2012 - 2016
      Bachelor's Degree, Petroleum & Gas Engineering Petroleum Engineering 3.47/4

      الأنشطة والجمعيات:SPE QUETTA CHAPTER FINAL YEAR PROJECTMicrobial Enhanced Oil Recovery (MEOR)The Aim of my Project is to inject micro-organisms along its nutrients into the reservoir which reduces the interfacial tension, working as a surfactant in the reservoir. Thus by reducing interfacial tension and hence also reducing Residual Oil Saturation can provide maximum Recovery of oil.

  • Experience

    • Hydrocarbon Development Institute Of Pakistan (HDIP)

      Feb 2016 - Feb 2016
      Trainee Reservoir Engineer

      Worked on Analytical Techniques being used in Petroleum geochemistry, Geology & Reservoir Engineering.

    • Oil & Gas Development Company Ltd.

      Mar 2016 - Dec 2021

      - Performed the following Operations.- Electric Wireline jobs (CBL-CAST-CCL)- Drill Stem Test (DST)- Well Completion Jewelry (Well Completion Assembly)Tubing HangerFlow CouplingSSSVMulti cycle Barrier valve assemblyLocator seal Assembly (LSA)PackerSeal Bore Extension (SBE)Mill out Extension (MOE)No go nipple.Perforated pup joint.WLEG- Nitrogen Kick Off Job- Acid Stimulation Job- Flex Trip Test- Perforation Job- Fishing Jobs such as* Overshot* Taper Tape* Junk Mill* External Cutter* Washover Shoe* Poor Boy Shoe * Packer retrievie Tools etc. عرض أقل Learned about Basic of Baker Hughes MWD/LWD and Directional Drilling Engineering tools and it's Function.such as,AutoTrak (RSS).OnTrak.BCPMMud Motor.NaviGammaCCN and ORDCirculating Sub.Catcher Sub etc.Learned about different type of cement slurry ,Tools and Cement Job Procedure.such as,Lead Slurry and Tail slurry etc.Tool's.Cement Silo.Batch Mixer.Water storage Tank.Mixing Tank.Displacement Tank.Mixing Tub.Dust collector.Fly Mixer.Cement Head.Pumping Unit.Top Plug.Bottom Plug.Float Shoe.Float Collar.Landing collar (For 7" Liner cement Job) عرض أقل

      • Assistant Production Engineer

        May 2019 - Dec 2021
      • Assistant Drilling Engineer

        May 2016 - Apr 2019
      • Assistant Reservoir Engineer

        Mar 2016 - Apr 2016
    • ADNOC Group

      Feb 2022 - Jan 2024
      Field Airloop Engineer

      I am a highly experienced professional with specialized expertise in brownfield operations, particularly in contexts where Hydrogen Sulfide (H2S) is a significant factor. My proficiency in this area allows me to expertly navigate the complexities and hazards associated with H2S, thereby ensuring optimal safety and operational efficiency in brownfield environments.safety Induction course to every new arrival on site.Weekly training to personnel about donning and doffing of BA sets.Properties and characters of H2S, using of air loop system, Evacuation of victim and First aid during emergency.Familiarize and remain cognizant of all drilling activities, which could produce an H2S release.Check H2S Detection System for proper operation and perform H2S calibration checks once every 24-hour period and every 12 hours once H2S has been detected.Recalibrate sensors, as required, and record that sensor checks and calibrations were conducted in the Drilling Contractor’s Log.Maintain daily contact with Drilling Supervisor reporting on status of equipment readiness, maintenance performed, and drills or training completed that day.Conduct “H2S Awareness and Safety BA Training” for all new personnel arriving on the rig. Training and safety equipment orientation on arrival.Check and maintenance of all 15 minute ELSA, SABA and 30 minute SCBA are functional and fully charged.Ensure that all Cascade Air Banks are charged, on-line, and capable of recharging SCBA.Check system for signs of air leaks.Ensure operability of Air CompressorsDuring activities that have a potential for an H2S release, provide continuous monitoring with H2S personal Detector Tubes and checking in open air by using detector tubes.Maintain a running inventory of location and availability of all Safety Equipment. عرض أقل

    • Halliburton

      Feb 2024 - now
      MWD Engineer
  • Licenses & Certifications

    • IADC RIGPASS

      Inspire Safety Engineering Private Limited
      Sept 2019
    • Level 2 International Award in Fire Safety

      Occupational Safety and Health American Counsil
      Aug 2019
    • Standard First Aid, CPR and AED

      Occupational safety and health American counsil
      Aug 2019
    • Managing Safely

      Institute of Occupational Safety and Health (IOSH)
      Sept 2017
    • Drilling Fluid technology

      Continuing Professional Development Program (CPD)
      Dec 2015
    • Health, Safety & Environment

      SPE
      Dec 2012
    • NEBOSH

      British Council
      Nov 2019
    • Basic H2S OPITO

      OPITO
      Dec 2022
    • Office Automation

      National Institute of Design & Analysis (NIDA)
      Mar 2014
    • Basic Fire Fighting

      TÜV Rheinland Middle East
      May 2023