Agnelo Neto

Agnelo Neto

Site Supervisor

Followers of Agnelo Neto1000 followers
location of Agnelo NetoSpain

Connect with Agnelo Neto to Send Message

Connect

Connect with Agnelo Neto to Send Message

Connect
  • Timeline

  • About me

    Infrastructure Supervisor | Site Supervisor

  • Education

    • Universidade Federal do Amazonas

      -
      Engenheiro civil
    • IPOG - Instituto de Pós-Graduação e Graduação

      2014 - 2016
      MBA em Gestão de projetos
    • ISEP - Instituto Superior de Engenharia do Porto

      2017 -
      Mestrado em Engenharia Construction Management
    • Instituto Politécnico do Porto

      2010 - 2010
      Bachelor's Degree Civil Engineering
  • Experience

    • Vetec Engenharia LTDA

      Mar 2010 - Mar 2012
      Site Supervisor

      Highlights include the control of measurements and management and supervision of the construction of BR-319 from ENTR. BR-230/AM (A) to ENTR. BR-230/AM (B) and BR-230/AM from Humaitá/AM to ENTR. BR-319/AM (A). Supervision of earthworks, base and sub-base, drainage, paving, ancillary works, signage, and environmental recovery. Coordination of paving services, deforestation, including subgrade stabilization, special and regular civil works, galleries, and CBUQ. Management of production and schedules, issuance of monthly technical reports to public agencies, and direct oversight of construction execution. Leadership of a team of over 1,000 employees, focusing on monitoring, training, and directing, and forming high-performance groups. Show less

    • PDG Incorporadora e Construtora

      Oct 2012 - Jun 2013
      Site Supervisor

      Singolare Project with 3 towers, 18 floors, and 4 basement levels, including supervision of activities and contracts, financial control, and schedule management. Significant learning experience with vertical construction and the first project in Manaus featuring ventilated façades in high-end developments.

    • LVM contruções

      Jul 2013 - Jan 2014
      Construction Supervisor

      Execution and planning of the bridge construction over the São Jorge Stream, featuring an arch structure, guard with a port, lighting, and signage, while also involved in the preparation of photographic reports. Improvements in structural reinforcement techniques, expertise in epoxy adhesive anchoring, and increased knowledge in civil engineering works and metal structures.

    • Bureau Veritas Brasil

      Jun 2014 - Aug 2018
      Site Supervisor

      Participation in the Technical Team of PROURBIS, the Urban Development and Socio-Environmental Inclusion Program of the Municipality of Manaus.Management and supervision of construction projects, preparation of overall and physical-financial schedules, as well as project reviews, budgeting, and initiation using MS Project. Conducting field surveys of houses located in the Environmental Protection Area (APP) of the Mindu Stream to be expropriated for the program’s implementation, through sketches and reports. Gained significant experience on a project financed by the IDB (Inter-American Development Bank), working with large-scale construction elements such as micro and macro drainage, paving, construction of residential areas, and the first neighborhood in Manaus with a sewage treatment system.Provision of Supervision Services for the Construction of the BR/432 RR Pavements Implementation, extending 36.73 km, and supervision of the restoration and improvement work on the BR-319/AM Highway, extending 89.4 km.•Supervision and inspection of on-site work (reinforcement, formwork, reinforced concrete, earthworks, drainage, retaining walls, paving, signage, road safety equipment, and fencing).•Monitoring and oversight of resources allocated to the project (labor and equipment).•Preparation of daily reports and photographic documentation of the work performed.•Measurement of completed work.•Verification and validation of monthly progress reports.•Supervision of concrete testing (slump test).•Supervision of layer testing (compaction and moisture control). Show less

    • Riportico - Engenharia

      Sept 2019 - Nov 2020
      Site Supervisor

      Project Owner: Gestão e Obras, E.MContractor: Alexandre Barbosa Borges, SAExecution Period: 635 daysContract Award Value: €14,766,766.12Project: Campanhã Intermodal TerminalMain Activities:• Construction Supervision: Supervision of services for the 600 mm diameter pile wall, permanent anchors, 110,000 m³ of excavation, 12,000 m³ of technical fill, 4,700 linear meters of 600 mm diameter piles, 110 linear meters of anchors, 3,800 m³ of concrete, and 430,000 kg of steel.• Resource Management: Monitoring and supervision of resources allocated to the project, including labor and equipment, ensuring compliance with the project, deadlines, and technical standards.• Report Preparation: Creation of daily reports and photographic documentation of the work performed, in addition to measurements of the work and validation of the monthly progress reports.• Quality and Compliance: Ensuring the execution of services in accordance with technical specifications and quality standards, while ensuring compliance with occupational health and safety regulations.• Problem Identification and Resolution: Identification and resolution of technical issues during project execution, focusing on safety and adherence to safety regulations.Additional Experience:• Supervision for Grupo Intermarché: Participation in the supervision of a construction project for a supermarket and a Bricomarché store.• Construction of the Mosqueteiros Market in Arcozelo (Intermarché and Bricomarché):Project Review and Supervision: Project review, surveying, and supervision of services, including retaining walls, earthworks, steel structures, smoke extraction systems, electrical and telecommunications installations, health, environment and safety compliance, industrial refrigeration, and HVAC installations.Report Preparation and Measurements: Preparation of weekly and monthly reports and verification of measurements. Show less

    • EFS Engenharia Fiscalização e Serviços

      Nov 2020 - Jul 2022
      Site Supervisor

      Project Owner: Domus Social, E.MContractor: Befebal, IIExecution Period: 360 daysContract Award Value: €2,159,929.00Execution Value: €2,343,866.48Project: Rehabilitation of São João de Deus Neighborhood - Volumes 22 to 38 and H1Contract for Supervision and Control ServicesMain Activities:• Construction Supervision: Monitoring and inspection of on-site works, including demolitions, foundations, structures, electrical infrastructure, plumbing, ventilation, and gas, ensuring compliance with the project and technical standards.• Resource Management: Supervising the resources allocated to the project, such as labor and equipment, ensuring efficiency and compliance with technical specifications and quality standards.• Report Preparation and Record Keeping: Producing daily reports and photographic documentation of the work performed, as well as preparing work measurements and validating the monthly work progress reports.• Quality Control and Compliance: Analyzing and approving materials, ensuring quality and compliance with project standards and specifications. Verifying and validating benchmarks in comparison to those provided by the contractor.• Problem Identification and Resolution: Identifying and resolving technical issues that arise during the execution of the project, focusing on efficiency, safety, and adherence to occupational health and safety standards. Show less

    • Tabique - Engenharia, Lda.

      Jun 2022 - now

      EN109, KM 118+108, PONTE EDGAR CARDOSO SOBRE O RIO MONDEGO. FISCALIZAÇÃO DA EMPREITADA DE SUBSTITUIÇÃO DO SISTEMA DE TIRANTES " Inspeção de:Blocos de ancoragem para tirantes e blocos de amarração.Caixas de amarração, com chapas de espessuras variando de 10 mm a 100 mm.Juntas de penetração total, incluindo configurações topo-a-topo e de canto.Estruturas de aço dos tipos S275, S355 e S460. Show less Project Owner: IP, Infraestruturas de Portugal, SAContractor: Construções Gabriel A.S.Contract Value: €12,550,000.00Project: Road-Railway Interface / EN14 (Santana) – Including New Bridge Over the Ave RiverDescription: Project includes over 2,400 meters of new road network, 4 new roundabouts and respective connections to the existing road system, three regular civil works structures, Hydraulic Passage at km 0+022, Pedestrian Passage at km 0+327, Underpass at km 0+594, and the new Bridge over the Ave River, between km 0+895 and km 1+057.Responsibilities:•Monitoring and inspection of on-site works, ensuring compliance with the project, deadlines, technical standards, and required quality specifications, including reinforcement, formwork, reinforced concrete, earthworks, drainage, retaining walls, paving, signage, road safety equipment, and fencing.•Supervision and management of resources allocated to the project (labor and equipment), ensuring execution according to technical specifications.•Preparation of daily reports and photographic documentation of work performed, as well as measurement of completed tasks.•Verification and validation of monthly work measurement reports, ensuring accuracy and compliance with quality requirements.•Supervision of concrete testing (slump), prestressing, and grout injection in ducts, as well as layer testing (Gammadensimeter/SDG), ensuring the quality and compliance of materials used.•Identification and resolution of technical issues arising during execution, focusing on safety and compliance with occupational health and safety standards.•Participation in technical and safety meetings, contributing to continuous improvement and project success. Show less Project Owner: IP, Infraestruturas de Portugal, SAContractor: Construções Gabriel A.S.Contract Award Value: €31,714,498.47Actual Execution Value: €36,722,076.64Project: Construction of EN 14 - Maia Diagonal Route / Trofa Road-Railway Interface – 2nd Phase with an approximate length of 10km, between Maia (Diagonal Route) and Trofa (Road-Railway Interface) and respective reinstatements (7), including two Overpasses, two Agricultural Crossings, four Viaducts (approx. 1,290m), and one Bridge (approx. 750m).Responsibilities:•Monitoring and inspection of on-site works, ensuring compliance with the project, deadlines, technical standards, and required quality specifications, including reinforcement, formwork, reinforced concrete, earthworks, drainage, retaining walls, paving, signage, road safety equipment, and fencing.•Supervision and management of resources allocated to the project (labor and equipment), ensuring the execution of services in accordance with technical specifications.•Preparation of daily reports and photographic documentation of work performed, as well as measurement of completed tasks.•Verification and validation of the monthly work measurement reports, ensuring accuracy and compliance with quality requirements.•Supervision of concrete testing (slump), prestressing, and grout injection in ducts, as well as layer testing (Gammadensimeter/SDG), ensuring the quality and compliance of materials used.•Identification and resolution of technical issues arising during the project, focusing on safety and compliance with occupational health and safety standards.•Participation in technical and safety meetings, contributing to continuous improvement and project success. Show less

      • NDT Technician PT MT UT

        Dec 2023 - now
      • Infrastructure Supervisor

        Jan 2024 - now
      • Infrastructure Supervisor

        Jun 2022 - Jul 2024
  • Licenses & Certifications

    • Mastering bitumen for better roads and innovative applications

      École des Ponts ParisTech
      Aug 2024
      View certificate certificate
    • “International Engineering Practice - Perspectives for the Engineer of the 21st Century

      Universidade do Estado do Amazonas - UEA
      Dec 2024
    • Networking: Como Criar uma Rede de Contatos Profissionais

      LinkedIn
      Jul 2024
      View certificate certificate
    • Front-end Development

      EDIT. - Disruptive Digital Education
      Jan 2022
      View certificate certificate