Edy Widyanto

Edy Widyanto

Electrical Engineer

Followers of Edy Widyanto2000 followers
location of Edy WidyantoBanten, Indonesia

Connect with Edy Widyanto to Send Message

Connect

Connect with Edy Widyanto to Send Message

Connect
  • Timeline

  • About me

    Lead of Drives and Electrical Engineer at ABB

  • Education

    • University of Muhammadiyah Jakarta(UMJ) & PATIGAT

      2001 - 2003
      Bachelor's degree Electrical and Electronics Engineering A
    • Polytechnic of Gajah Tunggal (PATIGAT)

      1994 - 1997
      Diploma Electrical and Electronics Engineering A
    • SMAN 1 Cilacap

      1991 - 1994
      Senior High School A1 - Physics Science A
  • Experience

    • PT. Gajah Tunggal Petrochem Industries Tbk

      Sept 1997 - Apr 2005
      Electrical Engineer

      Responsible for maintain reliability & availability machines/ equipment's via manage Preventive, Predictive and Corrective Maintenance Activities for all aspect on electrical, instrument and control system/ automation equipment's.

    • ABB

      Apr 2005 - now
      Lead of Drives Service Engineer

      I. Lead Drives Engineer for LV AC&DC Drives system and MV Softstarter ProjectCoordinator for Planning, Design, Installation, Commissioning, Troubleshooting, Retrofit/ Refurbish, Training and PM(Preventive Maintenance) activities for various drives system application at various customer plant sites (Oil & Gas/ COG, Petrochemical, Cement, Mining, Pulp & Paper, OEM, Steel , Power Plant, F&B, utility, data center and etc).Also responsible as Coordinator for ABB Drives Service Workshop/ DSS . . II. Lead Engineer for Generator Excitation/ AVR ProjectCoordinator for several ABB AVR/ Generator Project ;1.) AVR Retrofit project of Unitrol 1000-15 2CH(Redundant system) for Generator system (TG5&6) with capacity 9.8 MVA on IKPP-Perawang(Sinar Mas/APP), Riau.2.) AVR Retrofit project of Unitrol 1000-15 2CH(Redundant system) for existing SIEMENS AVR at Generator system with capacity 8.75 MVA on KMI(Kaltim Methanol Industri) -Bontang, East Kalimantan.3.) On going AVR Retrofit project of Unitrol 1000-15 2CH(Redundant system) for existing ABB AVR at Generator system with capacity 8 MVA on MTA (mall and apartment building), Jakarta.4.) On going AVR Retrofit project of Unitrol 1020 1CH for existing SIEMENS AVR at Generator system on Petrowidada(Petrochemical - plant), East Java.5.) On going AVR Retrofit project of Unitrol 6000 2CH(Redundant System) for existing ALSTOM AVR at Generator system on DSS Serang (Sinar Mas/APP), Serang - Banten.6.) Upcoming AVR Retrofit project of Unitrol 6000 2CH(Redundant System) for existing GE AVR at Generator system on PJB Muara Karang, Jakarta. Show less

  • Licenses & Certifications

    • 01. ABB LV AC Classic Drive of SAMISTAR

      ABB University Finland - Helsinki
    • 02. ABB LV AC and DC Drive Expert Day Training

      ABB Singapore
    • 04. Sea Survival Training

      BARRON International
    • 05. ABB AVR Unitrol 1000-15

      ABB Filipine & ABB Thailand
    • 06. Project Safety Managment

      ABB Indonesia