AHMED EL-KHOLY

AHMED EL-KHOLY

CONSTRUCTION PIPING & MECHANICAL EQUIPMENT

Followers of AHMED EL-KHOLY2000 followers
location of AHMED EL-KHOLYCairo, Egypt

Connect with AHMED EL-KHOLY to Send Message

Connect

Connect with AHMED EL-KHOLY to Send Message

Connect
  • Timeline

  • About me

    Senior Mechanical Engineer

  • Education

    • Shebeeb El-kanater elthanawia

      1995 - 1998
      High School General Studies excellent

      الأنشطة والجمعيات:SWIMMING & MUSIC i was a student who study general sciences that qualified me to be a student of engineering

    • Helwan University Cairo

      -
      Bachelor's degree Mechanical Power and energy VERY GOOD

      الأنشطة والجمعيات: Master degree in mechanical engineering " Thermal Hydraulic Analysis of Super critical water Reactor Cooled By Nano Fluids " Bachelor of Engineering Helwan University-Materia BranchMajor: Mechanical Power and energy.Minors: STEAM POWER PLANT-GAS TURBINES- Water Desalination-Hydraulic & Pneumatic Systems-Refrigeration & Air Conditioning Systems-External &Internal Combustion Engines-Renewable energy.Final Year Grade: VERY GOODGraduation Project: PERFORMANCE OF DIESEL ENGINES USING ALTERNATIVE FUELSFinal Year Project Grade: Excellent-Post GRADUATE:- -Finished Pre-Masters stage LEVEL 500 &… عرض المزيد Bachelor of Engineering Helwan University-Materia BranchMajor: Mechanical Power and energy.Minors: STEAM POWER PLANT-GAS TURBINES- Water Desalination-Hydraulic & Pneumatic Systems-Refrigeration & Air Conditioning Systems-External &Internal Combustion Engines-Renewable energy.Final Year Grade: VERY GOODGraduation Project: PERFORMANCE OF DIESEL ENGINES USING ALTERNATIVE FUELSFinal Year Project Grade: Excellent-Post GRADUATE:- -Finished Pre-Masters stage LEVEL 500 & LEVEL 600 . -obtained master degree in mechanical engineering :- " Thermal Hydraulic Analysis of Super critical water Reactor Cooled By Nano Fluids " عرض أقل

    • Helwan University Cairo

      2010 - 2017
      Ms.c Master of Engineering Mechanical Engineering

      Second University Degree M.Sc. EngineeringUniversity Helwan University / EgyptFaculty Matria EngineeringMajor Mechanical Engineering.

  • Experience

    • MISR COMPANY FOR MECHANICAL&ELECTRICAL PROJECTS "KAHROMIKA"

      Jul 2008 - Aug 2010
      CONSTRUCTION PIPING & MECHANICAL EQUIPMENT

      - Cairo West thermal power station compined cycle 2x750 MW.- Talkha thermal power station compined cycle.- Ben Gazi thermal power station compined cycle.- Belqas Sugar factory extensions. Duties and Responsibilities: Install critical and non-critical piping for all different system “large bore” Installation small-bore line critical and non-critical.Prepare for hydrotest – supervise hydrotest. Prepare weekly report progress. Close all mechanical punch list items. Make RFI “Request for Information. Make SRN “site request Notice. عرض أقل

    • EVRMAC

      Aug 2010 - Feb 2014
      PIPING ENGINEER CONSTRUCTION & PDMS designer

      - Cairo West thermal power station compined cycle 2x750 MW.- Tebeen thermal power station compined cycle.- Sedi Krir thermal power station compined cycle.- El Shabab thermal power station single cycle (gas turbine) .- Domiate thermal power station single cycle (gas turbine) .- Henikel factory extension with AUHDE co.- Angola two thermal power station single cycle (gas turbine) .- Sokari Gold Mine extinsation Duties and Responsibilities: Design pipe routing for all different systems. Isometric Preparing & measuring actual length for existing pipes design model & extract data. design pipe support & take actual measuring to model existing supports. make final report including material takeoff. make final GA, PID Drawings for all different systems. Preparation of nozzle orientation document 3D modeling design (P.D.M.S.) Coordinating of piping department with Structure & Equipment departments. Training junior engineers with AutoCAD, PDMS for Drafting Model review. عرض أقل

    • Basra Gas Company

      Feb 2014 - Jan 2016
      PIPING engineer & PDMS designer

      - Installation, commissioning and start-up two degassing stations- Rehabilitation of five dehydration (TEG) units. The station have been out of service for long time and the client required to rehabilitate and start up.- Working during several shutdowns for LPNE modifications.- Rehabilitation of gas compressor stations.The units have been out of service long time ago and the client asking to carry out rehabilitation enables reuse again.RESPONSABILITESFollow Up Construction & Erection Work And Prepare Fabrication Status Report.supervise material status according to isometric material list.prepare as-built drawing according site requirements.Monitor all Piping construction activities with emphasis on quality, schedule and HSE.Participate in inspection activities according to Inspection and Test plan (ITP) as required.Follow up and ensure that all working environment requirements are fulfilled.Supervise local inspectors in site team.Monitor the receipt and storage of materials within the discipline.Participate in audits/verifications as required.Monitor work progress against plans and schedules and highlight areas of concern and possible corrective actions.Ensure that Contractors personnel are qualified in accordance with project requirements.Assist Contractor with discipline field engineering / construction details upon request or as required.Interface with Piping discipline at EPC Contractor.Ensure that systems and equipment are protected and preserved.Monitor and survey the pipe fabrication and testing.Review selected drawings and documents issued by EPC Contractor.Ensure that fabrication documentation is issued by Contractor in accordance with requirements.Ensure MC complete for handover to Commissioning.Design pipe routing for all different systems. Isometric Preparing.make final report including material takeoff.Coordinating of piping department with Structure & Equipment departments عرض أقل

    • ENPPI

      Jan 2016 - Apr 2016
      Commissioning Engineer

      mechanical commissioning engineer- carry out mechanical completion, precommissioningand commissioning of all the units, tankages and all interconnecting piping inassociation with Owner’s operating personnel.- Checking for final re-instatement and create a Punch List- Review nitrogen purge loops by system and wittiness for purging.- Supervise the hot tapping, Hydrostatic test and flushing for each system.- Responsible for technical solution for deviation from engineering- Responsible for the leak test per each system.Assist operating team on start up activity to achieve plant start up عرض أقل

    • EL MASRIA CONSTRUCTION Co.

      May 2016 - Jul 2016
      Piping Construction Superintendent.

      Main contractor :- Siemens - Responsible of all Piping activities On Base, Off Base and POP in fast track project.- Underground piping Supervision of GRE adhesive bonded joint piping installation, Supervision of fabrication of pipe spools at GRE/GRP fabrication area, Also HDPE pipes installing, PP pipes electric fusion and erection, precast and cast in site manholes, valve pits and storm ditch erection. - Solving any problem related to piping activities- Control and manage all Piping and Mechanical activities during meeting to avoid any SIMOPS- Follow Up Construction & Erection Work And Prepare Fabrication Status Report.- Supervise material status according to isometric material list.- Prepare as-built drawing according site requirements.- Monitor all Piping construction activities with emphasis on quality, schedule and HSE.- Participate in inspection activities according to Inspection and Test plan (ITP) as required.- Follow up and ensure that all working environment requirements are fulfilled.- Supervise local inspectors in site team.- Monitor the receipt and storage of materials within the discipline.- Participate in audits/verifications as required. عرض أقل

    • GUPCO

      Jul 2016 - May 2017
      Mechanical /Piping Commissioning Engineer.

      Position : Mechanical /Piping Commissioning Engineer. Client : GUPCO Petroleum Company Company : EMCProject : Morgan36 Rehab Project (offshore)RESPONSABILITES- carry out mechanical completion, precommissioningand commissioning of all the units, tankages and all interconnecting piping inassociation with Owner’s operating personnel.- Checking for final re-instatement and create a Punch List- Review nitrogen purge loops by system and wittiness for purging.- Supervise the hot tapping, Hydrostatic test and flushing for each system.- Responsible for technical solution for deviation from engineering- Responsible for the leak test per each system.- Assist operating team on start up activity to achieve plant start up. عرض أقل

    • GS E&C

      May 2017 - Jan 2020
      Senior Piping Engineer

      Client :- ERC “Egyptian Refinery Company” Project :- ERC Refinery Project (Oil Refinery located in Mostrorod, Cairo, Egypt)- Responsible for line checking of all pipe systems prior to hydro test activities. - Follow up construction team clearing all cat. “A” construction punch items. - Responsible for technical solution for deviation from engineering.- carry out mechanical completion, precommissioning.- Checking for final re-instatement and create final Punch List.- Supervise flange management activities. عرض أقل

    • Technip Energies

      Apr 2020 - Mar 2024
      • Precommissioning & Commissioning Engineer at Technip Energies

        May 2023 - Mar 2024
      • Senior Piping Supervisor

        Apr 2020 - Mar 2024
    • United Gas Derivatives Company (UGDC)

      May 2024 - now
      Senior Mechanical Engineer

      prepare and arrange all mechanical activities and tasks to be performed at the shut down· Mole-sieve beds repair activities and uploading new catalyst.· Triple offset valves (Turbo Expanders major tasks)· Modify the piping for new seal gas regulator of T/E (A/B).· Replacement of Sample point Passing Valves.· Installation of differential pressure transmitters in CPC pumps Y-strainer suction lines.· Solution for isolation philosophy of instruments (double block and bleed of HP LT's).· Installation of BDV-04/5 to depressurize U.S 40-SDV-07/09 and check valves DS 40-A-01A/01B.· Carry out mechanical completion, pre-commissioning of all the units, tankages and all interconnecting piping in association with Owner’s operating personnel.· Checking for final re-instatement and create final Punch List.· Supervise flange management activities.· Test package final reviewing. · Subsystem & System walk down and follow up construction team clearing all category “B” construction punches and subsystem punches prior to Mechanical completion.· Participate in PSSR prior to plant dray out, cold down, start up and initial operating. عرض أقل

  • Licenses & Certifications

    • Hazard_Awareness_Certificate

      RUMALIA ACADEMY
  • Volunteer Experience

    • instructor for the effect of global worming & its causes

      Issued by Helwan University on Jan 2006
      Helwan UniversityAssociated with AHMED EL-KHOLY