Guilherme Menezes

Guilherme Menezes

Trainee

Followers of Guilherme Menezes5000 followers
location of Guilherme MenezesUberlândia, Minas Gerais, Brazil

Connect with Guilherme Menezes to Send Message

Connect

Connect with Guilherme Menezes to Send Message

Connect
  • Timeline

  • About me

    Gerente de Engenharia e Projetos | Planejamento | CapEx | PMO

  • Education

    • Fundação Getulio Vargas

      2012 - 2014
      Pós-graduação Lato Sensu - MBA
    • UFU - Universidade Federal de Uberlândia

      2020 - 2022
      Mestrado em Engenharia Mechanical Engineering
    • Universidade Federal de Uberlândia - UFU

      2004 - 2008
      Bacharelado em Engenharia Mechanical Engineering
  • Experience

    • Archer Daniels Midland Company

      Jul 2008 - Sept 2009
      Trainee

      Experience on the maintenance area as an engineer trainee on a soybean processing plant, being responsible for the resource’s management, annual budget, predictive inspections, planned, routine and turnaround, as well as engineering improvements as a part of the reliability program. Trainee on a sugar cane alcohol plant on the distillery, alcohol tanks, fermentation and cooling towers construction. Results: An strategy to accelerate the construction by rebalancing the scope and contracts was completed. Show less

    • Vale

      Sept 2009 - Dec 2017

      Responsible for managing multidisciplinary projects since the conception until the start-up phases. Solid experience in project and construction management, contracts administration, field inspections, quality assurance, as well as time, cost management and risk assessment. Experience on the conception, basic and detailed projects in accordance to the front end loading methodology (FEL).Significant projects: Transference of the Cubatão fertilizers plants to the Uberaba facilities with a budget of USD$ 100,0; New Uberaba gypstack and the phosphogypsum pumping system with a budget of USD$ 80,0; Uberaba firefighting system with a budget of USD$ 10,0; Patrocínio primary crushing with a budget of USD$ 8,0; Tapira tailings pumping systems with a budget USD$ 5,0; Catalão recovery water pumping system with a budget of USD$ 4,0. More than MUSD$ 200 on executed projects. Show less

      • Engenheiro de Projetos Sênior

        Jan 2012 - Dec 2017
      • Engenheiro de Projetos Pleno

        Apr 2010 - Jan 2012
      • Engenheiro de Projetos Junior

        Sept 2009 - Apr 2010
    • Mosaic Brasil

      Jan 2018 - Jan 2021
      Engenheiro de projetos sênior

      Responsible for the conceptual project of the new MicroEssentials plant in the Uberaba facilities with an estimated budget of USD$ 180 MM.Responsible for the conceptual project of a new ammonia tank and a truckload out system in the Cubatão port with an estimated budget of USD$ 120 MM.Experience on portfolio management being responsible for the transformation program in the projects and control areas with the following main objectives: improve the capital cost allocation; reduce the projects expenditures; achieve a better portfolio of projects aligning the organizational strategy and priorities with the projects outcomes. Significant results: Reduction on the 2018 portfolio capital expenditures in an amount of MUSD$ 6,0, as well as a better-balanced portfolio that mixed opportunities, regulatory and sustainable projects.Responsible for the CMT-CIU slurry pipeline inspection, reliability program and the immediate repair actions. With an outstanding result, the inspections provided informations to mitigate operational and environmental risks after the completion of Immediately repair actions. Responsible for the Tapira tailings pumping systems project that provided the conditions to return the operations after the Dams regulatory changes that resulted on an unplanned production stoppage. It was a challenging project in terms of complexity, schedule and scope. The project was completed within 90 days, since the conception and engineering phases until the implementation. More than 350 tons of pipe was built, with more than 55.000 worked hours without any incident. Show less

    • Archer Daniels Midland Company

      Dec 2020 - Oct 2022
      Engineering and Projects Manager

      Responsible for the projects and portfolio management, as well as engineering, planning, control and execution of multidisciplinary projects, in accordance to the FEL methodology, from the conception until the construction, commissioning and start-up phases. Responsible for the FEL 01, 02 and 03 projects development of organic growth, sustaining and compliance, working with greenfield and brownfield projects.

    • Syngenta

      Oct 2022 - Jun 2023
      Coordenador de projetos
    • Vale

      Jun 2023 - now
      Engenheiro Especialista
  • Licenses & Certifications

  • Honors & Awards

    • Awarded to Guilherme Menezes
      Prêmio Evolução Engenharia e Planejamento de Projetos - COE de Projetos - Mosaic Fertilizantes Mosaic Fertilizantes Feb 2020 O prêmio levou em consideração diversos aspectos das atividades relacionadas ao desenvolvimento e implantação de projetos.