    TMS COW-JC Engineer

  • Education

    • Pusan Vocational College

      -
      Associate's degree Computer Aided Manufacturing
  • Experience

    • Allseas

      Jun 2013 - Jul 2014
      E&I Inspector

      - Responsible cable insulation resistance test for all electric and instrument system.- Mechanical Completion Inspection and Commissioning test (Loop / function test) for HV and LV Switchboard, HVAC System, F&G System, Transformers, Lighting System, Cabling and PA / GA System etc…- Participated of GTG and GTC FAT inspection- Heat tracing loop check for seawater pump line.- Overall shield and individual shield status check for telecom noise, instrument noise and speaker noise problem, especially site mandatory data. 더보기 취소

    • Chevron

      Aug 2014 - Jan 2015
      E&I Inspector

      - Responsible cable insulation resistance test for all electric and instrument system.- Carried out the receiving inspection for all electric and instrument equipment.- Cables and cable tray installation inspection.- Surveying all the cable tray installation condition following O-gland material and the bonding status on the cable tray.- MCC switchboard construction management, especially sub-contractor progress status check every day.- CMP gland installation status check. (Double gland and Compound gland)- Attended firefighting system loop check detector, manual call point, fire hose rill and beacon lamp. 더보기 취소

    • Songa Offshore

      Feb 2015 - Jan 2016
      E&I Inspector

      - Surveying with construction team for EIT construction condition on every day for project quality - Responsible cable insulation resistance test for all electric and instrument system.- Carried out the mechanical completion inspection for all electric and instrument equipment.- Field Instrument Installation Inspection.- Tubing line installation inspection and ISO DWG verification and flow way check for make sure.- Cables and cable tray installation inspection as Area Completion Inspection.- Safety issue to sub-contractor about easy explain of potential hazard (drop object, using PPE)- Safety observation issue every day- Quality inspection following Norsok standard (IEC 60079)- CMP gland installation status check. (Double gland and Compound gland) 더보기 취소

    • Feb 2016 - Oct 2016
      E&I MC Supervisor

      - Carried out small power loop check about F&G system, PAGA system, Field instruments, PMR system, Cold loop etc…- Prepare and update on daily report about subcontractor activities for quality and delivery date.- Punch control and monitoring with punch list which may impact either the quality or delivery date and suggest the solution.- According to the cable schedule, Cable specification check and megger test.- Following to the zone information EX level check about hazardous, non-hazardous and ground zero for EX equipment certificated.- Make sure connection of ground following Ground plan.- discussing with EIT sub-contractor for installation quality about EIT equipment according to ICE 60079 rule 더보기 취소

    • Total

      Nov 2016 - Oct 2017
      E&I MC Supervisor

      Attended a daily morning meeting with subcontractor for construction progress and safety issue also.- Prepare and update on daily base report (Blocking Point List) for MC inspection result updating and further progress.- Prepared material list which have warehousing schedule for material control.- Carried out pre-inspection before mechanical completion inspection.- Verification of E&I equipment and cables against engineering documents.- Prepare the engineering document (Mark up, EX Certificate etc…) for MC inspection of construction team- Monitoring with blocking point list and punch list which may impact either the quality and delivery date and suggest the solution.- Attended commissioning no load testing for make sure construction quality and on installation connection check for motor side.- Spec. deviation and verification revision check for MC check sheet.- Monitoring EIT subcontractor installation quality check for QVD progress and status. 더보기 취소

    • Statoil

      Oct 2017 - Oct 2018
      E&I MC supervisor

      Prepared and carried out the Walk down inspection before system handover for commissioning progress.-Verification and monitoring of contractor and sub-contractor’s quality control activities for electrical equipment.- Prepared material list which have warehousing schedule for material control.- Verification of EIT equipment and cables against engineering documents.- Attended a daily meeting for MC progress and system handover.- Coordinated between engineering team and construction team to fix to punch list and which have soft problem serious punch also.- Monitoring with blocking point list which may impact either the quality and delivery date and problem solve.- Prepared and reviewed the LUN document for preparation of PTW issue.- Control and management our EIT sub-contractor about installation of quality, progress and MC punch list 더보기 취소

    • Tengizchevroil

      Oct 2018 - May 2019
      Electrical Commissioning Technician

      - Prepare and supply 380vac shore power from temporary diesel generator. - Energizing and power control of MCC for HVAC, Small power, Lighting, and many kind of Motors etc...- Protection relay(SEL) function test.- Soft starter of motor function test.- MCC Panel function test.- Arc flushing test.- Loop check and energizing UPS and PDB panel for PAS, SIS system.- Lighting function test.- Duct megger test of MCC switchgear

    • Samsung Electronics

      May 2019 - Oct 2020
      E&I Supervisor

      - Preparing of the mechanical completion and commissioning inspection- Verification and monitoring of sub-contractor's quality control activities- Attended a daily meeting for construction and punch clearance progress- Carry out pre-inspection to find out blocking point and suggest the solution for further progress

    • Technip Energies

      Dec 2020 - now
      JC Engineer

      - Produce the job Cards dossiers related to the engineering documentation for electrical and instrumentation.- Create a Bill of Materials listing the materials required for a particular work scope. Link Bill of Materials line items to job cards or work packs.- Define deliverables, such as drawings. Link deliverables to job cards or work packs.- Record completion with the partner construction task force- Indicate the correct Inspection Test record to be selected in the register of COW activities 더보기 취소