Clauber Schappo

Clauber Schappo

Intern

Followers of Clauber Schappo866 followers
location of Clauber SchappoAnkara, Türkiye

Connect with Clauber Schappo to Send Message

Connect

Connect with Clauber Schappo to Send Message

Connect
  • Timeline

  • About me

    SLSS InTouch® Engineer, PMP® at SLB

  • Education

    • Centro Federal de Educação Tecnológica de Santa Catarina

      1999 - 2002
      Mechanical Technician Indústria
    • Universidade Federal de Santa Catarina

      2005 - 2009
      Mechanical Engineering Engineering

      Activities and Societies: Scientific Initiation Fellow in CIMJECT laboratory. Member in Tutorial Education Program group (PET) in Metrology and Automation. Member in Group for Logistical Studies (GELOG)

  • Experience

    • Logica

      Dec 2008 - Mar 2009
      Intern

      Intern for SAP ERP system deployment for treasury and accounting departments.

    • Engevix Engenharia S.A.

      Mar 2009 - Nov 2009
      Estagiário

      Trainee on Supply Chain department for Hydraulic Power Plants constructions.

    • SLB

      Feb 2010 - now

      Project Engineer for the Landing String package on Zohr Development Project with Petrobel/ENI as client. On this role, I was responsible to coordinate from the contract signature to the first phase of the project close out, including coordinating with all stakeholders, manage the project deliverables as per the technical specifications in timely manner, also I managed the field personnel to deploy the Landing String package offshore and helping client to deploy and install 10 wells in Shroud Basin, achievement which allowed Egypt to become energy self-sufficient and a potential gas exporter. Show less Project Engineer for the Landing String scope on completions campaign for Petrobras. On this role, I was responsible to plan and deploy the project related to Landing String scope for the Tubing Hanger installation in Vertical Xmas Trees and allowing flowback the well during this step, by providing dual barrier and fast disconnection point with Schlumberger Safety Valves, SenTREE HP, and the electro-hydraulic control system, SenTURIAN. This solution was used for the first time by Petrobras and made it possible to save up to USD 5 million per well completion in Santos Basin. It was performed 10 successful completion jobs in one year time frame. Show less

      • SLSS InTouch Engineer

        Apr 2023 - now
      • Project Manager

        Oct 2022 - Apr 2023
      • Project Manager

        Sept 2020 - Oct 2022
      • TLM Maintenance Manager

        Jan 2019 - Sept 2020
      • Project Engineer

        Dec 2015 - Jan 2019
      • Project Engineer

        Dec 2013 - Dec 2015
      • Field Engineer

        Feb 2010 - Nov 2013
  • Licenses & Certifications

    • Writing, Editing & Communication Skills

      Skillsoft
      Aug 2023
      View certificate certificate
    • Basic H2S - OPITO approved (9014)

      PETROLIFT
      Feb 2019
    • Project Management Professional

      Project Management Institute
      Nov 2021
  • Honors & Awards

    • Awarded to Clauber Schappo
      Silver Medal on Testing Services President's Award Schlumberger Jul 2015 Silver Award: BRZ-Macae for SLSS transforming VXT completion operationsThe Macae team succeeded in entering a white space in subsea market, extending Schlumberger landing string business into Development operations in Brazil. SenTREE HP and SenTURIAN were used in vertical x-tree completion installations with flowback capability. At the same time, I would like to thank Subsea Rosharon team in delivering fit for purpose annular access valve that enabled this solution. Petrobras saved around… Show more Silver Award: BRZ-Macae for SLSS transforming VXT completion operationsThe Macae team succeeded in entering a white space in subsea market, extending Schlumberger landing string business into Development operations in Brazil. SenTREE HP and SenTURIAN were used in vertical x-tree completion installations with flowback capability. At the same time, I would like to thank Subsea Rosharon team in delivering fit for purpose annular access valve that enabled this solution. Petrobras saved around 10 days of rig time and up to 10 million USD on each well compared to previous operations. The potential for formation damage was also eliminated by removing the need for suspending the well prior to flow back. The Macae team managed to increase Schlumberger Testing Services footprint in Brazil. This is a real stepping stone to further growing our SLSS business in Brazil, and globally. Congratulations to the team in aggressively pursuing new business opportunities. Show less
  • Volunteer Experience

    • PHP Teacher / Professor PHP

      Issued by Associação Catarinense para Integração do Cego (ACIC) on Jun 2009
      Associação Catarinense para Integração do Cego (ACIC)Associated with Clauber Schappo