Ahmed Mounier

Ahmed Mounier

Summer internship at Arab Contractors Company

Followers of Ahmed Mounier949 followers
location of Ahmed MounierCairo, Egypt

Connect with Ahmed Mounier to Send Message

Connect

Connect with Ahmed Mounier to Send Message

Connect
  • Timeline

  • About me

    Senior Engineer at VINCI Construction Grands Projets

  • Education

    • Benha University - Shoubra Faculty of Engineering

      2009 - 2014
      Bachelor's degree Civil Engineer Very Good with Grade (81.57%)

      Activities and Societies: Bachelor Degree of Shoubra Faculty of Engineering, Benha University. Major: Civil department, Degree: Very Good. Graduation Project : roads and airports , Graduation project grade: Excellent.  Project Grade: Excellent. Project Contents: 1. Constructing a link road connecting the new city with the existing highways showing alignment in addition to stations. 2. Longitudinal profile for the connecting road and the proposed expressway. 3. Cross section at different stations for connecting road. 4. Typical cross sections with different pavement layers showing the thickness of each. 5. Designing a 4-leg and a 3-leg interchanges connecting the expressways 6. Planning a parking area… Show more  Project Grade: Excellent. Project Contents: 1. Constructing a link road connecting the new city with the existing highways showing alignment in addition to stations. 2. Longitudinal profile for the connecting road and the proposed expressway. 3. Cross section at different stations for connecting road. 4. Typical cross sections with different pavement layers showing the thickness of each. 5. Designing a 4-leg and a 3-leg interchanges connecting the expressways 6. Planning a parking area in the new city in front of Mall. 7. Planning a toll station before the city. 8. Calculation sheet for all included design values. Show less

  • Experience

    • The Arab Contractors Company (Osman Ahmed Osman & Co.)

      Jun 2011 - Jul 2011
      Summer internship at Arab Contractors Company

      Steps receipt of engineering work for buildings- Receipt of the excavation work- Receipt of the regular concrete floors- Receive carpentry (receiving carpentry reinforced concrete columns - Islam joinery reinforced concrete roofs)- Receipt of rebar and blacksmithing work (rebar foundations - rebar columns and walls - rebar reinforced concrete roofs)- Casting works (by casting - while casting - after casting)

    • Saleh & Hegab Integrated Engineering Economical Consultancy

      Jul 2013 - Sept 2013
      Summer internship at Saleh & Hegab Integrated Engineering Economical Consultancy
    • General Authority for Roads & Bridges and Land Transport

      Feb 2014 - Apr 2014
      Internship Trainee
    • Saleh & Hegab Integrated Engineering Economical Consultancy

      Mar 2016 - Apr 2018
      Junior Engineer

      Responsibilities:1-Monitor performance of the Contractor / Sub-contractor and making sure that any established works according to the project specifications. 2- Inspection for Structural and architectural activities on site. 3-making sure the contractors works running according to the approved drawings. 4-prepare the monthly progress report.  Working Sites: 1. Madinaty B8 “Group 83” : 1.1. New city consists of 58 Residential Buildings, 5 floors with basement 2. Madinaty B8 “Group 85” : 2.1. New city consists of 58 Residential Buildings, 5 floors. 3. El-Rehab City – 7Th Settlement Extension: 4. Royal City -6th OF October: 4.1. Consists of 40 Villa. . 5. Callipso Village at Ras Sedr: 5.1. Mall Project consists of two floors with total area 2100 m2. Show less

    • VINCI Construction Grands Projets

      Apr 2018 - now

      Project: Greater Cairo Metro Line Three Phase Three .Manage and supervise the quality procedures and implementation of the activities in (Gameat El-Dowal,Nasser, and Bolaq stations in addition to 3 Annexes in Cairo Metro Line 3).1-Technical Experience1. Construction of diaghrame walls with total length about 850 m and depth 72m for each panel.2. Revise koden test results and making sure the deviation of panels is within limits.3. Check all material used in the grouting base plugs (Aluminates, Silicates, and Water), Check the injectedquantities and jelling time for the mix.4. Construction of All Structural Elements (Capping Beam, Slabs, Raft, Stairs, Escalators… etc).5. Provide QMS performance data as requested by the BA Manager for reporting purposes.6. Arrangements (Plaster, Cladding, Screed, Ceramic, Granite and Paintings).7. Opening the gate between the tunnel and the main shaft.8. Masonry works at shaft.9. Water tightness for raft using (PVC sheets and compartment method).10. Repair the construction elements using applicable materials.11. Repair the water leakage of DW using HA cut materials. Show less

      • Senior Engineer

        May 2018 - now
      • Senior Engineer

        Apr 2018 - now
  • Licenses & Certifications

    • International Computer Drivers License - Level One (ICDL,)

      ICDL Certification
      Apr 2014