HESHAM AHMED HANAFY.  (PMP®)

HESHAM AHMED HANAFY. (PMP®)

Site engineer (contractor )( bridges and road and culvert )

Followers of HESHAM AHMED HANAFY.  (PMP®)459 followers
location of HESHAM AHMED HANAFY.  (PMP®)Riyadh, Riyadh, Saudi Arabia

Connect with HESHAM AHMED HANAFY. (PMP®) to Send Message

Connect

Connect with HESHAM AHMED HANAFY. (PMP®) to Send Message

Connect
  • Timeline

  • About me

    Infrastructure Manager (PMP®) /project manager/construction manager

  • Education

    • (college

      1998 - 2003
      Bachelor's degree Civil Engineering
  • Experience

    • Ziad said al qasas

      Oct 2007 - Jul 2010
      Site engineer (contractor )( bridges and road and culvert )

      The implementation of the second stage and the duality of Tabuk road / Duba length of 30 kilometers - as a site engineer is responsible for:- Setting a timetable for the project.- To prepare reports on daily production rates and monthly time and compare it to the program and measure the progress of the project- Review plans and engineering drawings before starting implementation and during implementation and post-implementation.- Coordination with the Advisory Forum project supervisor in the processing papers WIR and approved by the Advisory- Preparation of monthly extracts of the sub-contractorsPrepare monthly extracts of the main contractor and approved by the Consultative Forum.- Review plans and engineering drawings bridges and bridges have been implementing a number 3 bridges criss-cross with the road OR Cross with Valley.Implementation of complete duplication by clan / ALHOTA / Twaim / Jalajel / combined length (17.20) kilometers - as a site engineer is responsible for:- Setting a timetable for the project. - To prepare reports on daily production rates and monthly time and compare it to the program and measure the progress of the project- Review plans and engineering drawings before starting implementation and during implementation and post-implementation.- Coordination with the Advisory Forum project supervisor in the processing papers WIR and approved by the Advisory- Preparation of monthly extracts of the sub-contractorsPrepare monthly extracts of the main contractor and approved by the Consultative Forum.- Review plans and engineering drawings bridges and bridges have been implementing a number 2 bridges criss-cross with the road OR Cross with Valley.- Review plans and engineering drawings terms and has been implementing a number 7 phrases variously Seoul. Show less

    • Al majil office

      Aug 2010 - Dec 2012
      Site engineer

      worked at AlmaJel's Office for Engineering Consultant Hail branch (k.s.a) –SITE ENGINEER REDESIGNING complete sewage Phase II - from 2-8-2010 TO 31/12/2013- To prepare reports on daily production rates and monthly time and compare it to the program and measure the progress of the project- Review plans and engineering drawings before starting implementation and during implementation and post-implementation- Monitor the work of the extension pipes and installation of manholes and control as well as finishing inside manholes Overseeing the contract No. 1 - District al naqra- Hail city - contract Sayegh Sons Contracting company:* Still under supervision of the project (project duration of 36 months Hijri). * Implementation of the regression lines glazed pottery The flexible link and concrete link. * The value of the contract: SR 139,818,000.* Contract amount: 159,600 linear meters * V.C.P Pipes diameters 200 - 250) SS mm, ES mm, diameters (300-350-400-450-500-600) ES mm. * Number of manholes 3200 ManholeOverseeing the Contract No. 2- neighborhoods (al zahrh - alzahrh extension - Aga - Dora mashar - Dora the shamal – al mamlaka - Transmission Line)IN Hail city - Contract Amer Foundation Khchil Contracting company:The project was completed (36 Hijri month)* Implementation of the regression lines glazed pottery The flexible link and concrete link Contract value :70,000,000 SR** Contract amount: 105,300 linear meters* The type of pipes used: * V.C.P Pipes diameters 200 - 250) SS mm, ES mm, diameter (300-350-400-450-500-600) ES mm.* GRP pipes diameter of 700 mm (transmission line) with a total length of 4120 linear meters.* The number of manholes 2705 Manholes. Show less

    • Yard consultant

      Feb 2013 - Sept 2015
      Project engineer

      worked at yard consultant Office for Engineering Consultant Riyadh branch (k.s.a) –SITE ENGINEER REDESIGNING complete sewage network at the west of Riyadh• Responsible the construction project from start to completion• Monitor all project objectives and plans, setting performance requirements and selecting project participants• Communicate effectively and manage contractors during various phases of the project• Co-ordinate the activities of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors, and laborers• Bring about optimum utilization of resources- labor, materials, and equipment and ensure their procurement at most cost-effective terms• Identify and monitor the elements of project design and construction likely to give rise to disputes and claims Show less

    • Dongo company

      Nov 2015 - Oct 2017
      Project manager

      Project manager at storm project in the east of RiyadhWorking at Dongo Saudi Company for contracting at East of Riyadh as senior infrastructure engineer (STORM projects) From 16 -11 – 2015 until 15-10-2017:Scope of the project :- Network storm with catch basin with various depth and diameter for pipes and dimensions for the culvert .Role of my job( project manager)- Setting a timetable for the project.- To prepare reports on daily production rates and monthly time and compare it to the program and measure the progress of the project- Review plans and engineering drawings design before starting implementation and during implementation and post-implementation. And make any update on the design if needed- Preparation of monthly extracts of the sub-contractorsPrepare monthly extracts of the main contractor and approved by the Consultative Forum.- Manage Active workers- Limit the quantities of substances used Active- Preparation of daily and weekly reports and work schedules in collaboration with my team Show less

    • TAJ AL AZIZIA COMPANY

      Oct 2017 - Dec 2020
      Infrastructure Manager(projects manager )

      Infrastructure projects :sewerage network at twaiq area and house connection 50,000,000 srwater and sewage lines as subcontractor wit and metro line 3 ( 30,000,000 sr )my role :1. Technical Review of Improvement Plans, technical specifications, construction estimates, design calculations for compliance with approved design criteria, and good civil engineering practice.2. Provides support for Construction in answering and resolving technical design issues, clarification, and interpretation of the design drawings, coordination with other sections.3. Provide technical advice and guidance to Management on all aspects of Civil Engineering and needed improvements or design changes.4. Prepare technical reports and correspondence on Civil Engineering issues. Prepare and give engineering presentations on ‘Civil Engineering issues.5. layouts and coordinate with other engineering sections, prepares alternative solutions to issues and problems.6. Prepare and review of cost estimates and material quantities.7. Review Contractor's design submittals, specifications, and calculations submittals.8. Perform field inspections and provides field support during construction.9. Review vendor/shop drawings and construction material submittals.10. make the preparation of Utility with my stuff (Sewer, Water, Storm drain) master planning in the creating of capital improvement projects and verifying the capacity of the existing utility systems and establishing new.11. Manage Active workers- Limit the quantities of substances used Active- Preparation of daily and weekly reports and work schedules in collaboration with the project manager12. Setting a timetable for the project. Show less

    • Economic houses

      Dec 2020 - now
      Construction Manager

      Ensuring full understanding of all the contractors’ scopes.Assisting in producing project reports for issues to the client on a weekly and monthly basis, as required, to report on project progress and performance.Managing the site coordination including chairing the daily/weekly meetings with the contractor.Maintaining a daily detailed diary of activities ensuring all delays are recorded.Helping on the overall on-site safety management Supporting in monitoring progress against.Supporting the commercial manager/quantity surveyor with project information. Managing the project functions Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Dec 2020
      View certificate certificate