Gamal Ismail

Gamal Ismail

Offshore Drilling Engineering Manager

Followers of Gamal Ismail649 followers
location of Gamal IsmailEgypt

Connect with Gamal Ismail to Send Message

Connect

Connect with Gamal Ismail to Send Message

Connect
  • Timeline

  • About me

    Senior Consultant (Drilling & Completion & Well Integrity)

  • Education

    • Suez Canal University

      1975 - 1980
      Bachelor of applid Engineering Science (BASc) Drilling & Production

      الأنشطة والجمعيات:football, trips Petroleum Engineering5 years studyMajores: Drilling, Drilling Fluids, casing design, Cementing,, reservoirs, productions, rock mechanics, geology, electric logging, completions technology

  • Experience

    • Belayiem petroleum company - Petrobel

      Sept 1982 - Mar 1995
      Offshore Drilling Engineering Manager

      Responsible for all engineering aspects related to four/five rigs in Gulf of Suez, Nile Delta fields and Sinai peninsula fields, directed and supervised three drilling engineers and some engineers in training. Responsibilities included detailed implementation of drilling programs and completion programs. Supervised engineering related facts of Marine rigs operation in Gulf of Suez and land rigs(Sinai & Nile Delta) fields. Responsibilities included execution of technical programs and designing the application programs and , also make the required :- Study and researches to overcome and prevent most of drilling problems to cut down well cost, and consulting the daily drilling operations. Study and research the optimum drilling techniques to improve the drilling performance and to reduce the drilling well cost.  Rigs selection and all drilling contracts evaluation and recommendation (Rigs, Hammer,Directional Equipment’s, MWD, Directional survey, Cementing, Bits). عرض أقل

    • ZADCO UAE

      Dec 1994 - Dec 2010
      Drilling & Completion Technical Support Leader

      Leading the Drilling and completion team in Upper Zakum Field (UAE Offshore) for designing, writing detailed procedures and running different types of completion: single/dual string for multilateral wells. Well Value Assurance (WVA) Process to prepare an optimize d well program jointly with different disciplinary team members from business units & services companies. ZAKUM Field, Offshore. Detailed drilling design for several horizontal wells. Define well trajectory, torque & drag analysis to confirm ability to achieve 1000 m long horizontal section  Applied different types of TAML levels (1,2,4) in dual completion wells. Focal point for different tasks to enhance well productivity in Um Al dalkh/Satah fields (UAE), introducing new technology such as: utilizing ESP coiled tubing, acid frac, fiber optic for monitoring, workover low productivity wells. Conducted the feasibility study for the utilization of NAF oil based mud in offshore rig at ZAKUM field offshore. Upgraded the rigs to ensure Zero discharges to the sea. Tendered and contracted the optimum system. Four ERD wells were dilled and completed successfully in year 209/2010. Performed technical feasibility studies for TH.II Western Area (tight reservoir) to drill ERD wells with 10,000 ft horizontal drain to improve and sweep the oil in place. in Upper Zakum field. Four wels completed. Plans, directs and supervises accessibility in open hole Multi-Lateral wells and perform the required remedy work such as stimulation, wellbore (chemical / mechanical) cleaning or Plug& abandon (P&A). Special well design for Satah field (UAE) Gas producer wells (formation pressure profile, casing selection and design, materials, well head cementing). Plans, directs and supervises stimulation, cased hole logs, cement squeeze operations for casing leaks and shut-off watered out intervals. Designed water disposal wells for different fields. عرض أقل

    • ADNOC -Abu Dhabi National Oil Company -Al Hosn Gas

      Dec 2010 - Jun 2013
      Completion Engineering Senior Advisor

      Prepared the conceptual completion design for highly Sour Gas wells to develop Shah Field(Phase-1) UAE – onshore. Identified the proper completion design for tight gas reservoirs, Monobore and Packers completions. Selected jointly the proper metallurgy for sour gas wells 25% H2S, 10% CO2, 300°F Prepared and tendered all the completion materials required for 20 gas wells ( 7” , 51/2” CRA tubing, CRA liner Top packers w/20 ft seal assembly, TRSSV, Well head /X-mass tree….) Designed Multi-Lateral completion wells either cased perforated hole or open hole for dual lateral wells Coordinate with Drilling/cement/mud team to ensure utilizing best practice for well integrity. Acid Placement Technology Options for Shah Well.(UAE) Performing fracturing design for tight gas reservoirs in Shah Field (UAE). Responsible for completion design and material selection for Shah field Project. Focal point of endorsing Geo-mechanical studies prior to decide hydraulic fracturing. Mentoring, coaching, assessment new graduates for well engineering post. عرض أقل

    • Seenopex Oil Services

      Jun 2013 - Sept 2015
      Drilling & Completion Engineering Manager

      Leading the drilling & completion team for preparing detailed turnkey project for drilling and completion wells from conceptual study to the P&A in Egypt, Iraq – (Bassra, Baghdad & Erbil fields). Study the offset wells in details; formations and drilling hazards analysis/solutions, pore/fracture pressure profile identifications, select the proper Mud weight/types required for each phase. Casing shoe depth selection, casing design optimization, well head selections, drilling completion materials required, rigs specs, tendering and procurements all materials/equipment’s, also the required services for drilling and completing wells. Preparing the project schedules from constructing the rig foundations/well pad/cellar to rig to end of drilling/completion operation. Detailed program for drilling, completion, drilling fluid, cementing, bit/BHA, directional/horizontalizations, perforation, testing, stimulations & running completion and risk mitigations for each phase. Prepare the technical and commercial bedding documents for the turn key tenders wells. Pre-spud rig acceptance and reediness for the starting operations, عرض أقل

    • SONTRACK.

      Aug 2015 - now
      Senior Consultant (Drilling & Completion & Well Integrity)

      Prepare the Standard operating procedures for Drilling, workover/completion, and well integrityAudit and Study the wells integrity and provide/supervise solutionsOptimize the workover and completion operations, add value.Design and plan re-entry and sidetracked wells

  • Licenses & Certifications

    • Well Control

    • Duolingo French Fluency: Beginner (Estimated)

      Duolingo
      Jan 2017
      View certificate certificate