Victor Ubesie

Victor Ubesie

CSR Assistant; Project/Logistic Coordinator; Planning Engineer; Methods Engineer (Instrumentation)

Followers of Victor Ubesie228 followers
location of Victor UbesieNigeria

Connect with Victor Ubesie to Send Message

Connect

Connect with Victor Ubesie to Send Message

Connect
  • Timeline

  • About me

    Electrical & HVAC Works Preparator / Methods Engineer (Electrical & Instrumentation), Logistics and Material Coordinator, Planning Engineer, CSR

  • Education

    • Enugu State University of Science and Technology

      1991 - 1996
      Bachelor of Engineering (B.Eng.) Electrical and Electronics Engineering Second Class Lower

      Electrical & Electronic Engineering

    • Enugu State University of Science and Technology

      1991 - 1996
      Bachelor of Engineering (B.Eng.) Electrical and Electronics Engineering (Digital Electronics)

      Activities and Societies: Association of Electrical and Electronic Engineering Students Nigerian University Engineering Students Association Obtained Bachelor of Engineering (B. Eng) in Electrical and Electronic Engineering.I designed and built many projects including:- Car auto activated immobilizer- Traffic Light Controller- Musical Piano- Electronic Melody Singer- Electronic components - Resistors and capacitors

  • Experience

    • NetcoDietsmann Nigeria Limited

      May 2006 - Nov 2011
      CSR Assistant; Project/Logistic Coordinator; Planning Engineer; Methods Engineer (Instrumentation)

      • Supervision of all General Maintenance Contracts (GMC) jobs in AMENAM/KPONO and OFON TOTAL Offshore facilities• Interfaced between Management and personnel for cordial working relationship• Coordinated and executed maintenance materials requests from departments, via UNISUP and Onne warehouse and ensured requested materials were received at good time• Back loaded spare parts from offshore to Onne for recertification and reintegration into the warehouse• Executed GMC Personnel Rotation Planning, Booking in/out during crew change• Prepared Annual leave and monthly timesheet for all GMC personnel• Planned and executed PSV revamping campaign using external contractors• Supervised and ensured the platform was kept cleaned and free from Oil spills.• Organized periodic washing of the platform with Pressure washing machine and RIG WASH oil detergent.• Organized spilled oil recovery activities whenever it occurred, thereby preventing pollution of the plant and the sea. Show less

    • SAIPEM CONTRACTING NIGERIA LTD

      Nov 2011 - Dec 2015
      Methods Engineer (Electrical & Instrumentation) / Materials Coordinator

      • Electrical and Instrumentation support for offshore maintenance team in AKPO FPSO• Preparation of Preventive Maintenance Procedures for Electrical, Instrumentation and HVAC maintenance work in accordance with work order requirement• Preparing of Maintenance Plans, Task Lists and Work Procedures • Planning and execution of Maintenance Campaigns: PSV, CO2 AND Control valves.• Electrical and Instrumentation general Re-Engineering• Weekly update and transmission to Offshore planning Engineer and other personnel of 4M look ahead planning detailing all missions, staff, vendors and follow-up of each mission till successful completion Materials Coordination• Work order backlog reduction management with emphasis at ensuring the availability and required qualities of materials for all work orders (Preventive and corrective).• Created Materials (Material Master Form) in the UNISUP working with Onne stock Controller and UNISUP Lead.• Performed inventory of maintenance materials spare parts at Onne using UNISUP. • Ensured that materials attached to work orders are available at Onne, where not available, created them with aim at ensuring delivery to site at right time.• Organized and supervised 3rd Party Stock movements in/out, and contractors’ storage facilities in close coordination with Project Stock officer and Deep Water Stock control team• Coordinate and control Project materials master data creation and maintenance related• For spare parts, managed the performance and supervised material analysis, Stock control criteria, reorder planning, goods issues and materials management strategies for the site.• Followed and coordinated Stock inventories for company and partners’ internal / external audits• Complied with security, health, environment and safety instructions for office, storage facilities and yards.• Maintained continuous anomaly reporting to management of hazardous situations and environment. Show less

    • TotalEnergies

      Mar 2018 - now
      Electrical & HVAC Works Preparator / Methods Engineer (Electrical & Instrumentation)

      Electrical & HVAC Works MaintenanceTasks and Achievements on Electrical and HVAC Equipment• 12M PM on Potable water pump sets: 29-P_-8506A/B• 12M PM on Hydro chlorite pump set: 28-P_-5202A• 12M PM on Potable water treatment package: 29-UT-8502• 12 M PM on Essential Air Handling Unit (AHU) unit B: 29-QA-091351B• 12 M PM on Non-essential AHU Levels 4, 5 and 6: 29-QA-091311-L4/L5/L6• 12M PM on Calorifier B: 29-TR 8501B• 12M PM on Power transformer: 28-IU-6103• Removal and replacement (Standard exchange) of Firewater jockey pump: 29-P_-0102B• Repair of platform Battery charger• Insulation resistance measurements on power cables, motor windings and space heaters.• Power cables disconnection and reconnection during standard exchange of equipment.• Electrical isolation and de-isolation• Thermographic measurements on cables and equipment• Campaign of Works preparation for Electrical and HVAC Flying team.• Use of Total Software - SAP (UNISUP), PRODOM, Tracks and E-Permit to prepare Maintenance activities for Campaign of Works personnel.• Work related risk (hazard) assessment and analysis and provision of Control (mitigation) measures.• Personnel and work duration (Man-hour) planning for optimum performance.• Spare parts and material management for each Maintenance Work order.• E-Permit to work preparation and Electrical Isolation designs.• Timesheet preparation and CMMS reporting in UNISUP for completed work.• Overall Completion Confirmation of Work in UNISUP for works already executed on site.• E&I Construction Support, Pre-commissioning checks and Commissioning of Electrical Equipment. Show less

  • Licenses & Certifications

    • Electrical Accreditation