Jefferson Jacinto

Jefferson Jacinto

Land Surveyor

Followers of Jefferson Jacinto79 followers
location of Jefferson JacintoQatar

Connect with Jefferson Jacinto to Send Message

Connect

Connect with Jefferson Jacinto to Send Message

Connect
  • Timeline

  • About me

    Land Surveyor Engineer at Hyundai Engineering & Construction Co.,Ltd.

  • Education

    • University of Saint Louis Tuguegarao

      1994 - 1999
      Bachelor of Science in Geodetic Engineer Land Surveying Professional Regulatory Commission (PRC) rating - 81.40%

      Activities and Societies: Geodetic Engineer Student Organization (GESA) - PRO Officer (1998-1999) Geodetic Engineer of the Philippines (GEP) - Active member to present

  • Experience

    • Al Arrab Trading and Contracting Company, ACC

      Jan 2008 - Jan 2010
      Land Surveyor

      • To ensure that all Survey work is carried out in accordance with the requirements of the drawing, specification and procedure.• To ensure that all survey reports are documented on Quality Control Forms.• To ensure that the establishment of all horizontal RC works are in correct position and elevation for the vertical and horizontal alignment in preparation the level of slab as per inspection and approval of the QC head. • Provide verification survey report of newly established points for project control and shall be recorded for documentation.• To ensure that all bench mark and elevation are based on the reference points given in the area.• To ensure that all marking points for RC works is in accordance to the given coordinates and plan details in preparation for the vertical and horizontal alignment.• To provide elevation and position mark for architectural and finishing works such as Tiles layout and windows for vertical and horizontal alignment, ceiling frame for gypsum board layout.• To provide elevation and marking alignment for mechanical and electrical line to ensure accurate distance and location points.• Direct reporting/coordinates to tower manager and technical planning for the update plan and details to ensure good quality works. Show less

    • Construction and Contracting Enterprises

      May 2010 - May 2012
      Land Surveyor Engineer

      • Received data from construction civil department for the description of work layout.• To ensure that all survey work is carried out in accordance with the requirements of the drawing, specification and procedure.• To ensure that all bench mark and elevation are based on the reference points given in the area.• Provide verification survey report of newly established points for project control and shall be recorded for documentation.• All structure should be provided a survey report by - as built survey elevations, and coordinates in a quality control forms.• All structures to be constructed on top of the existing structure, as built of the existing structure shall be checked and provided to ensure correctness.• Prepare survey report for the anchor bolt layout before and after concrete to ensure the accuracy and correct position.• Directly Monitor/Supervise the earthworks excavation with regards to the level required.• Provide marking points for mechanical pipeline to ensure the exact/correct location and elevation as per detail given in the drawing.• Direct reporting and coordinates to chief survey for the update of plan and details to ensure work will be rectified immediately and progress status. Show less

    • Hyundai Engineering & Construction Co.,Ltd.

      Jul 2012 - now

      • Conduct survey inspection with the QA/QC/CONSULTANT INSPECTOR pertaining to civil CRFI/RFI work layout.• Provide submittal survey report pertaining to as built/actual condition of structure for final inspection or checking. • To ensure that all bench mark and elevation are based on the reference points given in the area.• Do as- built survey report in accordance to aspire plan/drawing (2D/3D Survey coordinate XYZ for the Root Point Design to as built design comparison).• Provide gridline marking for References to ensure that all Civil/MEP layouts have tied up unto the provided survey control points.• Provide control points and marking elevation for references of the Sub-contractor.• Checked marking points establish by the Sub-contractor to ensure the accuracy of layout as per standard procedure on inspection.• Do submittal report for daily accomplishment and working schedule. Show less * Received data from Construction Civil/MEP department for the description of work layout and verification survey data.* Coordination to construction manager, QA/QC Engineer and Civil/MEP Site Engineer • Review all drawing of project structure and external work location, Detail of structure aspire drawing design.• Provide submittal survey report pertaining to as built work condition for final inspection.• To ensure that all survey work is carried out in accordance with the requirements of the drawing, specification and procedure.• To ensure that all bench mark and elevation are based on the reference points given in the area.• Prepare survey report and as- built in accordance to aspire plan/drawing.• Provide gridline marking for References to ensure that all Civil/MEP layouts have tied up unto the provided survey control points.• Provide control points and marking elevation for references of the Sub-contractor.• Check all marking points establish by the Sub-contractor to ensure the accuracy of layout and construction as per procedure on inspection. Show less

      • Land Surveyor Engineer

        Aug 2014 - now
      • Land Surveyor Engineer

        Jul 2012 - Jul 2014
  • Licenses & Certifications

    • Certificate of safety training