Johnny El Rassi

Johnny El Rassi

Followers of Johnny El Rassi603 followers
location of Johnny El RassiAbu Dhabi, Abu Dhabi Emirate, United Arab Emirates

Connect with Johnny El Rassi to Send Message

Connect

Connect with Johnny El Rassi to Send Message

Connect
  • Timeline

  • About me

    Ground Segment and EO satellite Engineer - Customer Support chez Airbus Defence and Space (Space Systems, Inc.)

  • Education

    • Orsys

      2014 - 2014
      Formation professionnelle Big Data synthése
    • Université de la Méditerranée (Aix-Marseille II)

      2006 - 2008
      Master's degree Intégration de systèmes logiciels

      Activities and Societies: équipe universitaire de bascketball

  • Experience

    • Atos

      Jan 2008 - Mar 2012

      ATV2 and ATV3 free flight and attached operations as ATV Ground Controller. • Handling the direct communication with international space partners (NASA, COL-CC, ESA Redu).• Responsible for the Assembly, Integration and Test/Verification (AIT/AIV) - testing and integrating the different sub-systems of the ATV Control Center.• The work was organised at two levels: firstly, the interfaces between individual subsystems were tested, verifying the network and functional connections between them. If the results of all the tests were satisfactory, the system testing and verification was performed, • Generation of tools and subsystems specifications and test plans.As responsible for the system team, this work also included: • planning of the installation, backups, and updates• Definition of the resources needed for deployments of new versions of the ATV-CC. • Elaboration of the hardware upgrade plan regarding the maintenance contracts • Interface between the ground team and the system team, giving the priority to the different tasks This work required a sound knowledge of the different functions and performance of the ATV Control Center, the connections between the different sub-systems and the way to use all the possible functions within the system. Show less Tasks include:- Analysis of the customer specifications (OICD), development of the VE: Visual Element (under VEGA GEMO), automation of the tests (tools FEST), validation, integration, following of the technical facts.- Development of functional components on the project CMS INDIA, a combat system for export 0- Development of software components & Unit tests, use of the SCRUM methodology.- Development of functional component of the NG4 TRAIN software of the combat system NG4 (training and simulation). The software stimulates the various sensors (sonars, periscope, arms, sensors environment) by playing a scenario previously defined using the TRAIN MMI.- Defining and realising a module to transform the Scenarios Data Base of DCNS into a format that can be used by NG4 TRAIN simulator.- Validating in close coordination with the submarine crew members all the operational and graphical aspect of the simulator. Show less

      • ATV Ground Controller for CNES

        Sept 2009 - Mar 2012
      • Conception and development engineer for DCNS

        Jan 2008 - Sept 2009
    • Terma A/S

      Apr 2012 - Mar 2015
      ATV Simulation officier for ESA

      Working as an integral part of the ATV SImulation Team (www.esa.int/atv).Tasks include:• Control, maintenance and acceptance of the ATV simulator at CNES. • Ensure the proper functioning of the ATV simulator during the simulation campaigns and missions of ATV-4 and ATV-5. • Identification and management of ATV ground simulator anomalies and resulting follow-up - Issue tracking, problem analysis and preliminary solution design for the improvement of the future software releases. • Interface with ESA, CNES and Airbus-DS designers to support solution implementation. Development of the ATV-3, ATV-4 and ATV-5 simulation campaigns and missions: • Team training planning. • Simulation contents and goals definition. • Scenarios feasibility analysis. • Technical support to the ATV Control Centre team for identifying and solving operational issues• Management of the AIRT (ATV Integration and Regression Tests) between the ATV-CC and simulator means Show less

    • Davidson consulting

      Apr 2015 - Jul 2017

      Managing the AIV for the ADM Aeolus project Tasks include :Updating all project document after revivalAdaptation of data sets provided by ESA to allow factory and on site acceptance TestsManaging Factory acceptance tests ( Rome)Managing On site acceptance Tests (Tromso )Installation, deployement and Integration of the APF and AS subsystems http://www.esa.int/Our_Activities/Observing_the_Earth/The_Living_Planet_Programme/Earth_Explorers/ADM-Aeolus/ESA_s_wind_mission Show less

      • ESA Sentinel 3 Security Manager @ Airbus Defence and Space

        Feb 2016 - Jul 2017
      • ESA ADM-AEOLUS AIV Manager

        Apr 2015 - Mar 2017
    • Airbus

      Jul 2017 - now
      Ground Segment and EO satellite Engineer - Customer Support
  • Licenses & Certifications

    • Generative AI for Project Managers Specialization

      IBM, SkillUp EdTech
      Feb 2025
      View certificate certificate
    • Generative AI: Impact, Considerations, and Ethical Issues

      IBM
      Jan 2025
      View certificate certificate
    • AI Foundations for Everyone Specialization

      IBM
      Nov 2024
      View certificate certificate
    • Building AI Powered Chatbots Without Programming

      IBM
      Nov 2024
      View certificate certificate
    • Generative AI: Foundation Models and Platforms

      IBM
      Oct 2024
      View certificate certificate
    • Generative AI: Prompt Engineering Basics

      IBM
      Oct 2024
      View certificate certificate
    • Artificial Intelligence Essentials V2

      IBM
      Oct 2024