Rifat YAVUZ

Rifat yavuz

bookmark on deepenrich
location of Rifat YAVUZMoscow, Moscow City, Russia
Followers of Rifat YAVUZ697 followers
  • Timeline

  • About me

    Project Director at East Con Tech

  • Education

    • Sakarya university

      1999 - 2004
      Bachelor's degree metallurgical engineering
    • Orta doğu teknik üniversitesi / middle east technical university

      2007 - 2008
      Master's degree welding engineering
  • Experience

    • Askay insaat makine ve kimya san. tic. ltd. sti.

      Jan 2006 - Jan 2009
      Workshop chief

      Steel Construction, Storage Tank Manufacturing and Stainless Steel Fabrication.-TCDD Detailed revision(L4) works which is made on 1942 Model German Steam Locomotive according to DIN NORMS (Izmir).-Marmaray BC-1 Project King Post Pipes (acc to API 5L X65) Manufacturing and erection works (in Uskudar ISTANBUL TURKEY). For Yenikapı, Sirkeci, Yedikule Construction Sites manufacture of concrete tunnel segments of patterns that require precision manufacturing also made various steel construction (acc. to JIS). Maintenance TBM Machine.-Mosmetrostroy (Melen-7 Istinye)Various machining and with weld steel manufacturing-ALSTOMT uzla Various steel manufacturing with coated galvanized (acc. to EN 10025 and EN ISO 1461).- Enka Teknik Libia Desalination Plant Storage tank’s accessories(Flanges acc. to BS 1792-1 and BS 1092-1 EN 10025-1/2/3, , spool acc. to API 5L)and PIG Launcher(acc. to AISI 316-L)and various stainless steel construction manufacturing-DLH Yenikapı Marmaray BC-1 Project PEG tanks manufacturing (for keeping historical monument.)acc. to AISI 316-L.-PO.AS.LPG Storage Tank. Manage procurement period, design&manufacturing issues and organization of NDT&QC periods Show less

    • Pgm gozetim ve muhendislik ltd. sti.

      Mar 2009 - Apr 2010
      Senior industrial inspector

      Worked as 3rd Part Senior Industrial Inspector- Bayrampaşa Forum Mall Istanbul All of primary and secondary steel manufacturing, erection and finish paint works control and preparing daily report. Follow-up repairing process and NDT process organized and and preparing quality control files (acc. to ENV 1090-1 [April 2004], EN 10204, EN ISO 5817, EN ISO 15614-1, EN 287-1, EN 473,EN ISO 8501-1/2, EN ISO 12944-1/8 EN ISO 5173, EN ISO 10045-1 etc. )- Various overhead and portal cranes, boilers, pressure vessels maintenance controls,-Preparing all of coupons destructive and ND test according to ASME Sec IX(2007), AWS D1.1, API 1104, EN 287-1 EN 15614-1 PQR, WPQ, WPS documents.-Interpipe/UKRAINE Manufacturing inspection , loading-unloading and transport witnessing of seamless steel casing pipes and couplings according to API 5CT and 5B on behalf of Hayyan Petrolium Syria. Show less

    • Heidelberg cement tula cement plant

      Apr 2010 - Jul 2011
      Mechanical group chief/welding chief engineer

      HEIDELBERG 5000 TPD Cement Production Plant- Organization of workshop machinery for various manufacturing, steel construction embedded plates according to EN ISO, SNIP, GOST (Russian National Standards) and GB (Chinese National Standards) standards.-Execution and organization of specific welding works of Kiln, Slag Dryer shell welding, vertical mill body and basement and all NDT organization and control activities. ( All procedures and execution organization) -Qualification of all welders who worked at the project and organization of all qualified welders proper welding activities of project. Show less

    • Bureau veritas group

      Jul 2011 - Feb 2012
      Industrial quality group leader

      - Third-party inspection for wire and steel manufacturing according to ABNT NBR 7480 ( Brasil Standards) at HABAŞ (200.000 tons).-Third part inspection steel construction for CMS new plant in IZMIR (4500 tons).-Technical and Quality support for manufacturing caustic storage tanks and piping works according to API 650 and ASME 31.3. also ASME Sec. IX in TUPRAS.-Third part final inspection for air filter’s according to Rolls Royce ITP in IZMIR and ASME Sec IX, II and V.And various WPS, PQR and WQT inspection and preparing works according to EN and ASME Norms.-Shell Various type of LPG tank control works.-FORD Otosan Supervising for periodic technical control works for the branch. Show less

    • Renaissance heavy industries (rhi)

      Feb 2012 - Oct 2013
      Technological equipment manufacturing and installation chief

      3750 TPD Clinker Production Plant-Manufacturing management and QC all non-standard technological equipment according to FLSMidth (app. 2410 tons) workshop procedure based on EN Norms. -Installation of plant technological equipment-Organization and manage of all subcontractors.-The manufacturing scope is; calciners, cyclones, jet pulse filters, electrostatic precipitator, all belt conveyors, apron feeders, dryer crusher, tertiary ducts, kiln ID fan, duct, stacker&reclaimers, kiln middle shells, Back Filters, various steel construction, silencers, cooler’s casing, separator, chutes, compensators etc.acc. Various GOST STANDARDS and EN 10204, EN ISO 5817, EN ISO 15614-1, EN 287-1, EN 473, EN ISO 8501-1/2, EN ISO 12944-1/8 EN ISO 5173, EN ISO 10045-1 etc. ) -Management and order all specific hand tools, tools, consumables special machinery and welding machines. -Installation of all of the mechanical equipment. Raw material Area, Preheater, Crusher, ID Fan, Cooler etc. Areas include apron feeders, roller crushers, various belt conveyors, transfer tower, dosing unit, linear stock-hole, re-claimers and stacker, pre-heater cyclones, air slides, silos, crossbar cooler, ID Fan, electrostatic precipitator revision, bucket conveyors, drier crusher, kiln, various jet pulse filters-fans, kiln clinker cooler and preheater.(5500 tons mechanical erection, 6500 tons steel construction) -QC checks and arranges critical erection welding on-site ( e.g kiln shell welds, retainer blocks, pre-heater main columns welds etc.) and ND Testing.-Organizing of all equipment commissioning works, and follow all equipment punches and handover to plant.-Organizing all refractory jobs and manage to related subcontractors for preheater cyclones and kiln.-Organizing all insulation jobs and manage to related subcontractors. Show less

    • Euro technic

      Oct 2013 - Oct 2014
      Construction manager

      8000 TPD Cement Production Plant-Manage 26000 tons mechanical equipment installation (Various belt conveyors, apron feeders, reclaimers, stackers, Vertical Raw and Cement Mills, Kiln, Clinker Cooling, Electro and Bag Process Filters, Packing Units etc)-7600 tons of technological non-standard equipment manufacturing. -Responsible of 86.000 m² insulation works-Responsible of 5.500 tons refractory jobs.-Organizing of all subcontractors and drive to their contracts.-Preparing schedule jointly technical office, and organizing all cranes, tools and consumables.-Technical and commercial preparation of updated contract and manage relation with client. Show less

    • Renaissance heavy industries (rhi)

      Oct 2014 - Mar 2021

      -Attending Business Development Period and support for potential Projects,-Review of information about demands and derivation of supply and proposal preparations,-Preparation and leading direct and indirect budget,-Clarification of bid conditions and management of the tender preparation,-Monitoring of the bid management in order to ensure it is aligned with the organization's requirements,-Contribution in cost and price calculations and estimations,-Coordination of tender reviews and deadlines and adjust them to the frameworks given by the customers,-Leading client comments and join to clarification and negotiation meetings through tender phases,-Leading all technical and official correspondence responsible projects,-Site visit and checking to site general conditions from construction view before tender phases,-Checking and correction to project schedules,-Leading construction equipment plan and constitute budget for project location specific. Show less 10 Million TPA Enrichment Plant NORILSK NICKEL GOLD-COPPER-MAGNETITE Enrichment PLANT-Responsible technological equipment installation (stationary and rotary) app 11.600 tons-Site manufacturing and rubber lining work for non-standard equipment (app 500 t.)-Various sullary pumps -2 SAG, -2 Ball, Vertical Mill -Flotation Units for Magnetite Various type of Thickeners Manufacturing of technical equipment - Various belt conveyors -Copper Vertical Mills -Copper Press Filters -Magnetite Press Filters -Concentration tables for gold -Hydro Cyclones Gravity Concentrators -Various Compressors -Various Blowers -Various Feeders -Drum Magnetic Separation Unit -Packing Unit All procurement -Process of laboratory equipment -Organization of laboratory and workshop equipment-Reagent Unit (turn-key)-Vagon Loading Unit (turn-key)-Water Supply Pump Unit (turn-key)Leading to the procurement period for the equipment which is in Contractor scope.After completion of all equipment erection, I have been started as a Commissioning Manager.-The commissioning system was created.-The commissioning team was set-up for this project.-All required procedures created as project-specific (Punch Procedure, System Turnover etc.).-Main and subsystems were generated. Commissioning induction has been given to construction groups, client and design companies.-The readiness of subsystems is following up by the created construction reports etc.-Hand-over all system to the client properly and all plant at the end. Show less 2200TPD Ammonia Production Plant Joint Venture MITSUBISHI HEAVY INDUSTRIES-Responsible mechanical equipment installation (stationary and rotary) app 11.000 tons and insulation works app 125.000 m2-Various pumps( Split stream pumps, condensate pumps, solution transfer pumps, demineralization System -Feed Pumps, turbine condensate pump, hot water pumps etc.),-Various heat exchangers (Steam Preheater, Air Preheater, Steam Superheater Coil, Feed Gas Preheater, Blow-Down Cooler, Fuel Gas Preheater etc.) -Various drum (Steam Drum, Blow-Down Drum, Gas Compressor Separator, Vent Drum, Deaerator etc.)Auxiliary Boilers, Reactors-Primary & Secondary Reformer (All steel erection, main body, coils, gas lines, collectors, refractories-app 1750 tons-, insulation & paintings, all specific welding etc.)-Gas turbine Compressors-Steam Turbine Air Compressors-Various ID Fans-Ammonia Storage Tanks Erection (API-620) and all polyurethane insulation.-All internal works of stationary equipment loading packing (CS-SS totally 2850 m3)-Catalyst loading of reactors and Ammonia Converters (totally 1050 tons)-Cooling Towers-Air Compressor Turbine Condenser-Gas Compressor Turbine Condenser-Various Storage Tank for demi water and raw water (acc. to API 650)-All Pipeline and equipment insulation and steam tracing works.-Organization and leading of all local and foreign subcontractors. Show less

      • Tender Mechanical Executive

        Apr 2018 - Mar 2021
      • Mechanical Equipment Installation and Test Commissioning Manager

        Mar 2017 - Apr 2018
      • Mechanical Installation Group Manager

        Mar 2016 - Mar 2017
      • Insulation and Painting Chief

        Jan 2015 - Mar 2016
      • Mechanical Installation Group Chief

        Oct 2014 - Jan 2015
    • Ооо "ист контех"

      Mar 2021 - now

      Горно-обогатительный комбинат «Озерный» будет осваивать одно из крупнейших в мире месторождений полиметаллических руд. В рамках проекта в Республике Бурятия и Забайкальском крае будет возведена -%92 собственный труд и строиткльный техники (пик 4500 сотрудники и 395 ед. техники)-; - поставка и монтажа м/к : 16.000 тонн - Земляных работ: 8 миллионов куб. - Установка технологического оборудования: 9800 тонн - Закупка и монтаж сэндвич-панелей: 45 000 квадратных метров - Бетонные работы объемом: 70 000 кубометров - Закупка и монтаж кабеля: 1,2 миллиона метров - Закупка и монтаж модулная котелная: 3шт. (12,5+12,5+7,5 МВ) - Трубопровод процесс лине и межплощадочная инженерные сети: 100.000 метров (130.000 WDIA) - Закупка и монтаж всех козловой кранов, мостовых кранов: 42шт. - Здание инфраструктуры (EPC) : РММ, ВЖК, ЗСХ, ЗМС, Склав Масел, Пож Депо, Лаборатори и тд. - Насосные станции (EPC) - Трубопроводов сырой воды втч подёмный насосный станций: 22 километра - 220 кВ подстанция - СКПП и ДамбаСтроительство горно-обогатительного комбината ведет ООО «Озерное» («Озерная горнорудная компания»). Проект признан приоритетным для Фонда развития Дальнего Востока и Арктики (входит в ВЭБ.РФ). В планах – создание около 1,2 тыс. новых высокотехнологичных рабочих мест. Запуск предприятия, где будет ежегодно производиться до 597 тыс. тонн цинкового и 82 тыс. тонн свинцового концентрата Show less

      • Project Director

        Jan 2023 - now
      • Project Manager

        Mar 2021 - Jan 2023
  • Licenses & Certifications

    • Welded structural steels

      Tucsa
      Oct 2009
    • Welding engineering level iv

      Накс
      May 2013
    • Welding engineering level iii

      Накс level iii
      Jun 2010
    • Welding inspector

      Tüv süd
      Jan 2009
    • Certified welding engineer

      Gsi mbh niederlassung slv münchen
      Oct 2008
    • International welding engineer

      International institute of welding
      Oct 2008