Antonio Santana Ramírez

Antonio Santana Ramírez

ALMACEN

Followers of Antonio Santana Ramírez2000 followers
location of Antonio Santana RamírezApodaca, Nuevo León, Mexico

Connect with Antonio Santana Ramírez to Send Message

Connect

Connect with Antonio Santana Ramírez to Send Message

Connect
  • Timeline

  • About me

    Quality Manager & L6SBlackBelt en PROSANKIN

  • Education

    • IPN ESIME

      2002 - 2007
      INGENIERO MECANICO ELECTRICO ENERGIA
    • Instituto Politécnico Nacional

      2002 - 2007
      INGENIERO MECÁNICO ENERGIA
  • Experience

    • Marconi Communications/Store

      Jan 2000 - Jan 2001
      ALMACEN

      Control and capture of all materials. • Continually positioned it within the new charges that the company offered me. • Implemented new methods storage • Negotiating with other sectors of the company.

    • Zurich – SIAI Co

      Jan 2002 - Jan 2004
      ANALISIS DE SINIESTROS

      Analysis of cases and claims. • Reorganized the file department and give it the tools necessary for its proper functioning. • Implemented new consultation products of records and archival methods and their concentration. • Negotiated agreements between our different areas for ease of receipt of the documents.

    • PEMEX / Social Service /Professional Practices Gas y Petroquímica Básica

      Jan 2006 - Jan 2007
      PRACTICANTE

      Work with engineer’s fuel transport system nationwide, calculations. • Support the achievement of spreadsheets for fuel transportation and instrumentation.

    • Mitsubishi Heavy Industries Ltd

      Jan 2008 - Jan 2009
      México City Branch Project Engineer

      I was able to reconstitute the Department of Corrections and Document Control Project Guerrero Pacific 62 CCE Petacalco CFE, through the creation of databases, operating manuals, delivery processes and teamwork.• Simplify processes through new methods, to within 24 hrs to respond. • Responsible for care of service providers in the area of documents and technical translation, detecting anomalies, stabilizing processes strengthening relations between the people that contributes to the provision of information to the engineering project. • I was responsible for the team "translations" making staff retention, achievement of objectives and results, entering as an assistant to then take control documents over at a period of 6 months, with new proposals for work and organization. • Creating new ways of reviewing invoices to providers of technical translation services. • Translation techniques that focus on engineering projects and managing them. Show less

    • Fabricantes de Equipos para Refrigeración S.A de C.V. Cooling Industry Torrey Group

      Jan 2010 - Jan 2011
      Product Engineer Jr

      Responsible for the laboratory area of engineering and design of parts for refrigeration, affecting different areas of production engineering, belonging to the engineering team. • Test operation of refrigeration equipment. • Perform engineering changes and 3D design. • Contact with service providers.

    • GRUPO TORREY

      Sept 2010 - May 2013
      Quality Process Engineer

      Performing quality activities, as supervising quality points on assy line, resolving assy problems by the problem solving methods.• FMEAS• Technical Contact with suppliers.• Test the operation of refrigeration equipment.• Criteria for product validation.• Support for production line (analysis, cause-roots).• Support at technicians. For customer client.• Experienced In charge of 15 quality inspectors in different areas like validation pieces in basic operations, inspector quality lines, customer services, also substitutes pieces evaluation.• In charge (current) of materials receipt area.(4 employed )• Study and analysis of pieces of new suppliers and its approval by studies technicians. Show less

    • FERSA TORREY

      Jan 2011 - Jun 2013
      Lead Quality Assurance Engineer

      Coordination and verification to the raw materials receipt and coordination of procedure inspection and roots-cause of defective materials and failures on production lines.Contact with suppliers and negotiation and agreements.

    • PARTES Y ACCESORIOS TORREY

      Jun 2013 - May 2014
      Quality Assurance Manager

      As head of quality, the activities that I performed as part of the staff was to go to metrics review boards,bring quality metrics in line, defective, RMA's, customer service, lead plant quality equipment (two command Media and 25 operators), technical support in commercial expositions, negotiations with suppliers and clients, development of inspection methods, reduce the average monthly percentage of defective from 1.50% to .90.

    • Across Whirpool S.A de C.V.

      Jun 2014 - Jun 2015
      Quality ISO & QA Specialist

      + ​As quality manager the activities consisted of updating the quality manual, as well as leading meetings with the other departments, to review changes, updates and annexations of new business processes, as well as to plan,train and direct the company's auditors , Attend external audits and generate internal audits. ++ ​As a quality specialist in improvement strategies (quality), the activities consisted in support of strategies such as development of method of inspection, root cause analysis, poka yoke & fixtures, technical personnel training as quality tools as they are 5's, quality, fish diagram, training to new incomes with vision of quality. Show less

    • Across Whirlpool S.A. de C.V

      Jun 2015 - Apr 2018
      Senior Project Engineer

      The activities for this position are: development and setting of capex for new project, lay out design for production line, establishing labor for new platform, special tooling to use, pilot runs, development of technical documentation and process charts, Training of personnel as well as delivery of the new platform to the client, as well as managing as a meeting leader with the departments involved to achieve the goal and thereby contribute to the business.

    • Metalsa

      Apr 2018 - Mar 2020
      Quality Project Engineer

      Main activities: planning, structuring, and implementation of industrialization projects by Quality, delivering in time the PPAP process and project delivery to the customer, and maintaining each phase for the APQP and core tools, with which the project originally had many issues (Project G2X-BMW).

    • PROSANKIN

      May 2021 - now

      Planeación y administración de proyectos de nuevos productos por parte de calidad.

      • Quality Manager

        Oct 2021 - now
      • APQP Engineer

        May 2021 - Sept 2021
  • Licenses & Certifications

    • Six Sigma Advanced Analyze Phase

      University System of Georgia and offered through Coursera
      Dec 2020
      View certificate certificate
    • Six Sigma Advanced Define and Measure Phases

      University System of Georgia and offered through Coursera
      Dec 2020
      View certificate certificate
    • Six Sigma and the Organization (Advanced)

      University System of Georgia y ofrecido a través de Coursera
      Nov 2020
      View certificate certificate
    • ISO 9000

      Sccap consultores
      Feb 2015
      View certificate certificate
    • Mejora tu habilidad de escucha activa

      LinkedIn
      Mar 2020
      View certificate certificate
    • Iniciación y Planificación de Proyectos

      Coursera Course Certificates
      Oct 2017
      View certificate certificate
    • Programación y presupuesto del proyecto

      Coursera Course Certificates
      Dec 2017
      View certificate certificate
    • WPD delivering product leadership initiative

      Whirlpool Corporation
      May 2017
    • Lenguaje no verbal para líderes

      LinkedIn
      Sept 2020
      View certificate certificate
    • Fundamentos de Six Sigma

      LinkedIn
      May 2020
      View certificate certificate