Muhammad Osama Ali Khan

Muhammad Osama Ali Khan

Intern E&I Department

Followers of Muhammad Osama Ali Khan544 followers
location of Muhammad Osama Ali KhanPfarrkirchen, Bayern, Deutschland

Connect with Muhammad Osama Ali Khan to Send Message

Connect

Connect with Muhammad Osama Ali Khan to Send Message

Connect
  • Timeline

  • About me

    Projects Manager @ Reckitt | exGSK | Capital Projects | Utilities | Engineering | CAPEX | Procurement

  • Education

    • Beaconhouse School System

      -
      High School A'levels in Science Subjects
    • National University of Computer and Emerging Sciences

      -
      Bachelor's Degree Electrical and Electronics Engineering CGPA 3.38

      Activities and Societies: Event Manager and Administrator, 2013-2014. Event Manager, IEEE-NUCES, 2012-2013. Event Organizing Team, 2010-2014. Programming Team for FPGA. Cricket Team, Football Team.

    • Institute of Business Management

      -
      Master of Business Administration - MBA Engineering/Industrial Management
  • Experience

    • Descon Engineering Limited

      Jun 2012 - Jul 2012
      Intern E&I Department

      Intern at 50 MW FFC Wind Project. Working exposure with Nordex, Germany providing 1.5 MW Turbines.Alstom Grid, France providing the High and Medium voltage switchgear for substation.Areva, France providing the transformers.Exposure of working with Multi-national companies at this internship. Specific learning of substation equipment, safety procedures, testing and commissioning process of grid to WAPDA.

    • Karachi Port Trust

      Jun 2013 - Jul 2013
      Intern at E&M Department
    • Descon Integrated Projects Limited (DIPL)

      Aug 2014 - Jan 2014
      Trainee Engineer

      Substation (132kV GIS, 22kV GIS, Control Room, Power Transformer, Instrument Transformers, Auxiliary Transformers, Capactior Testing and Commissioning supervision.Working along side ABB Consortium.Other Responsibilities include CCTV Installation, Fire Alarm System Installation, Internet Installation (VSAT, iDirect, YahClick).

    • GSK

      Jan 2015 - Jun 2018

      Graduating Management Trainee - FLP Programme at GSK Pakistan, I got the opportunity to lead Engineering Projects at Site with multiple objectives:- Developing Master Plan for GSK West Wharf Site's Future,- All Capital Projects Management & Execution at site as core responsibility,- Energy & Water Champion for Site, ensuring Operational Excellence & delivering on Sustainability Goals,- Leading Electrical department's Operations & Maintenance,- Assisting Utility Manager in day-to-day activities to ensure smooth operations Weniger anzeigen Part of prestigious Global Management Trainee - Future Leadership Program, started-off from GSK West Wharf Engineering Department, with rotations within different sections which strengthened my skills & knowledge during course of my time.Key Achievements:- Technical Process - 13 (Engineering Audit) success.- Improving Electrical O&M at site,- Implementation of several Engineering Projects, few of which were:1. 133 KW On-Grid Solar Generation System2. 100% LED's replacing conventional lighting in Production & Offices3. Improvement projects in HVAC System to ensure sustainability & cost effectiveness Weniger anzeigen

      • Projects & Compliance Engineer

        Jan 2017 - Jun 2018
      • Management Trainee - FLP Programme

        Jan 2015 - Jan 2017
    • Reckitt

      Jul 2018 - now

      Managing 24/7 Utilities operations at factory premises while re-defining operational strategies with production targets at the core of every decision.- Responsible for overall utilities activities linked with Electrical, Steam, Water, Compressed Air, HVAC, Product Water at site including operation & maintenance with the use of contractual engineers & DAE- Quality & EHS Audits- Energy & water manager, driving initiatives to in-built sustainability in operations - Revamping utilities in line with site master plan with projects worth 2.2 Mil GBP in 2020-2022- Delivering cumulative savings from R&M & Energy/Water up to 125 kGBP in two years- Consecutive 3 quarterly awards for living RB values at workplace in 2020Major Projects: 1. EDI Plant for Purified WaterOne of the major projects was to move from conventional distillation plant to Electronic De ionization Plant, Capacity: 5000 Ltr/hr to improve quality standard, in-built sustainability & operational efficiency. Increasing capacity from 1200 to 5000 L/hr requirement replacement of MMF, UF, Softener, ACF, RO along with installation of EDI2. HVAC ReplacementUse of imported HVAC units replacing 40% of old & non-compliant HVAC units with reducing downtimes in Gaviscon, Disprol Liquid, Dettol ASL, Veet, Dettol Liquid Hand Wash, MPC & Veet production areas3. On-Grid Solar ProjectInstallation of 370 kW On-Grid Solar at site for environmental sustainability & cost saving taking complete site up to 510 kW and generating 65,000+ units every month via alternative energy 4. Energy Saving InitiativesNumerous energy saving initiatives implemented as Utilities Manager such as Boiler Economizer, Chiller Optimization, Solar LED Lights for Outskirts, Building Management System (BMS), Split ACs optimization in office block etc delivering savings worth 35 kGBP per annum5. Electrical Switchgear & TransformerElectrical switchgear replacement taking supply from local grid to reduce downtime & diesel consumption Weniger anzeigen

      • Project Manager

        Jan 2022 - now
      • Utilities Manager

        Jan 2020 - Jun 2022
      • Projects Engineer

        Jul 2018 - Feb 2022
  • Licenses & Certifications

    • Nebosh International General Certification in Occupation Health & Safety

      NEBOSH
      Jan 2022