Philip T. De Luna

Philip T. De Luna

QA /QC Final Inspector - CBU (Complete Built Unit)

Followers of Philip T. De Luna5000 followers
location of Philip T. De LunaAl Khobar, Eastern, Saudi Arabia

Connect with Philip T. De Luna to Send Message

Connect

Connect with Philip T. De Luna to Send Message

Connect
  • Timeline

  • About me

    QA/QC Engineer, Sr. Electrical, Instrumentation & Tele-Communication Inspector: CQI-IRCA ISO 9001:2015 QMS LA II Six Sigma, LSSBB, LSSGB ll CBT-Passed in Telecom, Instrument & Electrical ll Project Completion Engineer)

  • Education

    • Kaunlaran National High School

      1996 - 2002
    • Technological University of the Philippines

      2000 - 2005
      B. S. in Mechanical Engineering Mechanical Engineer 1.75

      Activities and Societies: - Scholar of Gloria Macapagal arroyo the past president (PGMA Scholarship) - fellow ship member- Youth For Christ Navotas Chapter.

    • Manuel S. Enverga University Foundation - Lucena

      -
      B. S. in Electrical Engineering Electrical engineer 1.75
  • Experience

    • Toyota Motor Philippines Corporation

      Apr 2004 - Dec 2006
      QA /QC Final Inspector - CBU (Complete Built Unit)

      Toyota ID No : 12366-09 (OJT)Toyota Motor Philippines - Car Manufacturer Assembling.Review Company standards, procedure and regulation to develop activities, safety and environment preservation, Ensure all works are completed to the standard specification before accept inspection, Maintain production report, follow up and report progress, Responsible for final inspection all CBU unit export and import from other country (Complete Build Unit) like: Rav 4, Rav 2, Grandiah, Super Grandiah, Prado .Hi-ace Previa. & land cruiser, Final inspector for internal and external parts of unit like, front & rare LH & RH bumper, hood, door molding, door glass, front center & rare Pillar, rocker panel & roof to avoid some defect like: dent, bump, scratch or damages, Including final inspection of technical and troubleshooting external parts Of unit such as wiring installation and verifying of small spare parts inside the hood, Dash board, Chair, carpet, and Console box To make it sure all parts is completed and properly installed.Conducting line inspection like reducing air tire, checking mugs, tire cap, valve, fuel, back door panel, plate, door handle, extra tire & stickers. (Make it sure all the stickers and Plate is correct as Per Unit Detail, Review progress status report monitoring and maintaining output unit from our department, Ability to perform work under pressure and meet tight deadlines, Ability to read history drawing of unit, Attend weekly coordination meeting in Every Department for quality related matters, Knowledge’s in Computer Operations, software and hardware installation, Network Configuration and computer troubleshooting. Show less

    • Stc

      Jan 2007 - Jan 2010
      QA/QC Telecom Inspector / Network Surviellances (STC ID No: 24252-7321)

      FOA - Certified Fiber Optic Technician : CFOT No- 728097STC ID No : 24252-7321Responsible for Quality and Technical Problems in all Exchanges sites and Electronic Cabinet, Carry Out to Operate and Expedites (RTTS) Remedy Trouble Ticketing System and (MAMAS) Management and Maintenance System, Responsible and Perform Quality monitoring for Fire Alarm System in all Exchanges sites & Electronic cabinet (Indoor and outdoor) Like: MSAN, RAN, LUCENT, HUWAEI, and SIEMENS, Strong knowledge for Maintaining and monitoring system like Sony Erickson, Nokia, and Siemens, Responsible for all external and internal power alarm Ex. Sceco AC, DC alarm, Card, fan, battery and rectifier alarm, Operational and Quality knowledge in electronic cabinet like MSAN, RAN, LUCENT, and HUWAEI, Ability to rectify any kind of alarm encounter in all exchanges sites and electronic cabinet, Responsible to prepared Quality Control Schedule for all exchanges site operator and coordination to Supervisor in- charge according to the type of alarm, Knowledge in Vendor drawing specification and other supporting document to be needed, Ability to carry out job independently and responsibly, Submitting Quality and technical report for all alarm system and complaint receive queries to all sites every month, knowledge’s for computer operation, software, hardware installation and Network Configuration Show less

    • GS Engineering and Construction Co. Ltd.Karan Sulfur Gas Facilities (Saudi Aramco Project)

      Aug 2010 - Mar 2011
      Instrumentation and Electrical Foreman

      Aramco Badges NO: 8959234-4GS-AS ID No : 1385KARAN GAS PLANT is designed to process 1,100 MMSCFD of sour gas and 120 MBCD of Condensate. Trains 400 and 500 including (4) stocks Observe the team and guideline them for following safety rules and regulation as per the company standards.Carried Out for take-off of materials and conduct toolbox meeting every day.Responsible to assist for installation and Erection of Instrument and Electrical equipment like: Medium Voltage Switchgears, Main Generator Step-up (GSU) Transformers & Auxiliary Transformers, Diesel Engine Motor Control Center (MCC), Local Control Panels (LCP), DC Distribution Boards, Main Supply Feeders & Sub-Distribution Panels, lighting and Grounding Including Different type of marshaling panel like: (DCS, ESDM. VMSS, DCSM, PLC, BMSS, CRMS, Network Cabinet PCSN), fire detection alarm system panel, corrosion monitoring system panel (CMS), cables glanding, cable termination, cable pulling Activities for medium/low voltage, control and signal Cable, Grounding system, cable transit, installation of Cable Tray Support for primary and secondary cable tray, stanchion Support, instrument Airlines, impulse tubing, installation of junction boxes and Diff types of instrument devices with Cable Testing (IR) test for Instrument and Electrical Cable, strong knowledge’s of work execution Inside PIB (Process Interfaces Building) especially in in diff types of activities like: Termination, Grounding System, and etc. Assist to Vendor for internal and external Testing, Wiring, Assembling And Attending for (SAT) Site Acceptances Test until Pre Comm.Responsible for all underground installation such as direct buried conduit, duct bank, cable raceways for underground cable, Knowledge’s in calibration of different types of devices such as PIT, TIT, PDIT, FIT, TE, control Valve, on/off Valve and etc.Estimation of man power and man power distribution, Leading a team Show less

    • GS E&C

      Mar 2011 - Dec 2011
      Electrical and Instrumentation Supervisor

      Aramco Badges NO: 8959234-4Global ID No : 1385 KARAN GAS PLANT is designed to process 1,100 MMSCFD of sour gas, and 120 MBCD of Condensate. Trains 400 and 500 including (4) stocks Good knowledge about Permit to work systems (PWS) and several kinds of permits like Cold work permit, hot work permit, Limited Space Entry permits, Supervise instrument installation, instrument queries and modification of work as per actual /revised drawing, including material take – off, work packages, controlling of instrument issued and engineering matters such as as-built / drawing modification. Also involve in leak test, loop check from field to DCS, commissioning and start-up assistance, carry out entire instrument punch list item and rectification, Ensures compliance as to the project Specification / Standard, contract requirement, materials requisitions and technical evaluation of vendor supplied equipment, Team leader for Assisting SAT (Site Acceptances Test) Preparation for testing and pre- loop checking with client and vendor, Knowledge’s in calibration of different types of devices such as PIT, TIT, PDIT, FIT, TE, control Valve on/off Valve and etc., Conduct toolbox meeting every day, Obtain the inspection, verification reports of the job completed. Reporting the daily progress, Estimation of man power and man power distribution. Submitted Daily, weekly & monthly reports to the officials for day to day Areas improvement & achieving the targets, Responsible to coordinate other departments to discuss some problems that can solve in better way, Coordinating all instrumentation work program and ensure the instruction regarding all works and specification are conveyed to the instrument technicians, Knowledge’s to read Engineering Drawings, Loop Diagrams, Location Drawing, and P&ID, Junction Box Mounting List, Logic Diagram, interconnection wiring diagram & Hook up drawings. Show less

    • Hyundai Heavy Industries Co., Ltd

      Dec 2011 - Jan 2013

      Global ID No : 2297915213-781(1)Power Block (3) Gas Turbine GTG (3) recovery steam generator HRSG(3)Steam turbine generator STG & including Balance of Plant or (B.O.P Area)Good knowledge about Permit to work systems (PWS) and several kinds of permits like Cold work permit, hot work permit, Limited Space Entry permits. Reviews of documents, inspection and test plan prior to field work execution. Ensure that it’s in accordance with all relevant codes, standard, client project specifications, and project systems and procedures, Review Quality and Maintenance records to highlight any problems for rectification, Rectifying and follow - up work completion report (WCR), Conducts material receiving inspection for electrical and instrumentation materials, Co-ordinate the resources and liaised with construction management and supervised to ensure adequate inspection coverage of all Instrumentation ongoing construction & completion activities, Carry out punch-listing on Mechanical Completion Tri-party walk-down Acceptance and monitor closing of punch listed items and Generates punch listing for the work deviation against specified drawing requirements and project specification. Attend weekly coordination meeting to client for quality related matters, Reviews and verification completed punch close-out prior to submission to client, Review and checks instrument loop folder to ensure that all stages are completed and signed, Prepares and issues non-conformance report, surveillance report and quality control inspection report for non conformance materials and activities, Maintains ISO 9001 based quality management systems in performing QC activities. Having good knowledge of plant safety rules & regulations Show less Global ID No : 2297915213-781(1)Power Block (3) Gas Turbine GTG (3) recovery steam generator HRSG(3) Steam turbine generator STG & including Balance of Plant or (B.O.P Area)Having good knowledge of plant safety rules & regulations, Monitoring the site quality control systems to determine where improvements are needed and recommending action.Reviews of documents, inspection and test plan prior to field work execution. Ensure that it’s in accordance with all relevant codes, standard, client project specifications, and project systems Procedures. Provide marked-up/red-line if applicable/necessary,Coordinate with the client representatives to ensure that inspections are carried out expediently, Inspect the construction quality to establish if the client requirements are being achieved, Generate client Request for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.Carry out surveillance and planned inspection as identified in the approved Inspection and Test Plan (ITP), Witnessing and Review calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use.Assist / Witnessed for various kind of E&I Quality Pre-commissioning, Testing in accordance with project requirement for equipment such as; SWGR, Motor, Cable, Power & Protection, Grounding/Lightning system, CP Protection, Lighting / Small power system and etc. Performed quality inspection of leak testing for Instrument Airline and impulse tubing, Witnesses and documentation for calibration of Different types of instrument devices and Valves with references instrument data sheet and other related testing for Electrical and instrumentation works Conduct Materials Receiving inspection, (FAT) and SAT, Prepares and issues non-conformance report, surveillance report and quality control inspection report for non conformance materials and installation activities, Show less

      • QA/QC Electrical and Instrumentation Engineer Warranty Assurances Marafiq Power Plant Project -IWPP

        Sept 2012 - Jan 2013
      • QA/QC Instrumentation and Electrical Inspector no: 0781

        Dec 2011 - Sept 2012
    • SK Engineering & Construction Co. Ltd

      Aug 2013 - May 2014
      QA/QC Instrumentation Inspector - (w/ Approv & SAP no. Wasit Gas Program Aramco Proj.)

      ARAMCO Approval reference No : WPD/WGC/T-9107-14 SK/IK-GS-T-S6412-14Global ID No : P1-SK-477EPC Gas Plant Project 4 PackagesReviews of documents, inspection and test plan prior to field work execution. Ensure that it’s in accordance with all relevant codes, standard, client project specifications, and project systems Procedures, Prepares and issues non-conformance report, surveillance report and quality control inspection report for non conformance materials and installation activities, Inspect the construction quality to establish if the client requirements are being achieved, Carry out surveillance and planned inspection as identified in the approved Inspection and Test Plan (ITP), Witnessing and Review calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use.Assist / Witnessed for various kind of E&I Quality Pre-commissioning, Testing in accordance with project requirement for equipment. Performed quality inspection of leak testing for Instrument Airline and impulse tubing, Witnesses and documentation for calibration of Different types of instrument devices and Valves with references instrument data sheet and other related testing for Electrical and instrumentation works Conduct Materials Receiving inspection, (FAT) and SAT, Having good knowledge of plant safety rules & regulations, Show less

    • Hyundai Heavy Industries Co., Ltd

      Jun 2014 - Feb 2020

      ARAMCO Approval reference No: STF & GTD-2-T-229-19, HAL/SA-16632Global ID No: HHIA-0932 Review Contract and subcontract specifications, typical inspection plan, inspection checklists, vendor/manufacturer’s documents, method statement procedures, Conduct daily internal site inspections/surveillance to monitor the construction activities, provided necessary quality supports, and issued pro-active notification to the field discrepancies encountered to avoid standard violation, Prepare Documentations: QMIS system, NCR, RFI, IFC drawing, Pre- Commissioning test Report, SATIP/ SAIC, Carry out Inspection of field for different type of installation for Telecommunication Activities inside the Plant (ISP) and Outside the Plant (OSP) like: Equipment racks/cabinets, IDF/MDF, building entrance protectors (BEP), splice enclosure’s, Telecom cabinet, FO distribution cabinet, TMGB grounding installation, mandrel test and orange marker/identification tapes, underground cable route, sub duct installation, Pedestal enclosure installation, splice closure, Installation of Telecom MH, grounding installation of indoor handset and loud speaker for In-Plant Paging System, installation of strobe light, Emergency Siren system, Sensor for Access control system(ACS), CCTV camera, and outdoor antenna installation for Mobile radio system, including SECURITY System (HCIS) High Commission for Industrial Security, Installation of MIDS & FIDS system for Perimeter fence including (CCTV) Closed Circuit Television System, camera-PTZ type, DOME, External fixed Camera with PAJB, IDF, LAN, Telephone booth, Voice and Data System, Paging System, direct buried conduit, trench & duct bank, cable raceways, cable tray installation of CAT6 UTP cable, FO cable splicing and cable testing using OTDR test Power Meter Light Source, Installation/Pre-commissioning and Test inspection, Involved in preparation of dossier, Conduct materials receiving inspection and ensure specification as to project contract req. Show less ARAMCO Approval reference No: STF & GTD-2-T-0947-18 HAL/SA-15545Global ID No : HHIA-0932 Applied E&I Quality Inspection Management as per method statement referred to “Schedule ‘Q’ SAES, SATIP SAIC, SATR of Saudi Aramco Standard procedure and Project Design Criteria, Prepare, Documentations: QMIS system, NCR, RFI, IFC drawing, Pre- Commissioning test Report, Reviews of documents and test plan prior to field work execution, Involved in loop checking activity, inspect and ensure that all relevant documents, drawings and inspection report are provided in the loop package such as data sheet (ISS), P&ID, Location Plan, including inspection test report (calibration, instrument Installation, cable testing, (leak testing instrument air and impulse tubing) and records the entire punch items. Perform and Carry out the Inspection from material receiving, calibration, installation and functional at site of different type of devices, valves, skid & analyzer, including airlines and impulse tubing activity, leak test, including documentation and functional for PRE-LOOP and FINAL LOOP CHECK activities.Prepares and issues non-conformance report, surveillance report and quality control inspection report for non conformance materials and activities Close coordinate and cooperate with Saudi Aramco PMT and SAPID for joint site Quality Inspection Installation/Pre-commissioning and Test inspection.Witnessing and Review calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use, Conduct materials receiving inspection and ensure specification as to project contract requirement, Carry out punch-listing on warranty Completion Tri-party walk-down Acceptance and monitoring for closing of punch listed,Assist Turn over Team in compilation of all necessary QA/QC documents and quality records for notice of completion and project mechanical completion Hand Over. Show less SEC Approval reference No: FS-HS-LT-01772/12-08-2015 HS-FS-LT-01728 Global ID No : H2-70083 Thermal Power Plant Super Boiler (4) Power Blocks (4) Steam Turbine A Total of 2300MWHaving good knowledge of plant safety rules & regulations, Monitoring the site quality control systems to determine where improvements are needed and recommending action.Reviews of documents, inspection and test plan prior to field work execution. Ensure that it’s in accordance with all relevant codes, standard, client project specifications, and project systems Procedures, Coordinate with the client representatives to ensure that inspections are carried out expediently, Inspect the construction quality to establish if the client requirements are being achieved, Carry out surveillance and planned inspection as identified in the approved Inspection and Test Plan (ITP), Witnessing and Review calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use.Assist / Witnessed for various kind of E&I Quality Pre-commissioning, Testing in accordance with project requirement for equipment such as; SWGR, Motor, Cable, Power & Protection, Grounding/Lightning system, CP Protection, Lighting / Small power system and etc. Performed quality inspection of leak testing for Instrument Airline and impulse tubing, Witnesses and documentation for calibration of Different types of instrument devices and Valves with references instrument data sheet and other related testing for Electrical and instrumentation works Conduct Materials Receiving inspection, (FAT) and SAT, Prepares and issues non-conformance report, surveillance report and quality control inspection report for non conformance materials and installation activities, Show less

      • QA/QC Engineer, Telecom Inspector (w/ Approv & SAP no. JRTP-Jazan Refinery - EPC-2)

        Mar 2019 - Feb 2020
      • QA/QC Engineer, Instrumentation Inspector (w/ Approv & SAP no. JRTP-Jazan Refinery - EPC-2)

        Jul 2018 - Mar 2019
      • QA/QC Electrical and Instrumentation Engineer (w/ SEC- Saudi Electric Approval no.)

        Jun 2014 - Jul 2018
    • Atlantic, Gulf & Pacific Company (AG&P)

      Jun 2020 - Aug 2021
      Electrical and Instrumentation Inspector - JG Summit Expansion Water and Power Plant Proj

      Reviews of documents, inspection and test plan prior to field work execution. Ensure that it’s in accordance with all relevant codes, standard, client project specifications, and project systems Procedures. Provide marked-up/redline if applicable/necessary, generate client Request for Inspection (RFI), carry out Inspection of field installation for Telecom, Electrical and Instrumentation Activities like: vibration monitoring system panel (VMS), fire detection alarm system panel, CMS, Programmable Logic Computer (PLC), distributed control system (DCS) panel Inside PIB and Substation. 33kV Medium Voltage Switchgears, 13.8/33kV Main Generator Step-up (GSU) Transformers & Auxiliary Transformers, Diesel Engine Motor Control Center (MCC) & Local Control Panels (LCP), DC Distribution Boards, Main Supply Feeders & Sub-Distribution Panels. Including field instrument installation for devices field instrument, Junction boxes, stanchion support, fire alarm devices, Including installation for inside Plant (ISP) and Outside Plant (OSP) Telecom cabinet, F.O. distribution cabinet, with underground installation, Assist / Witnessed for various kind of E&I Quality Pre-commissioning, Testing in accordance with project requirement for equipment such as; SWGR, Motor, Cable, Power & Protection, Grounding/Lightning system, CP Protection, Lighting / Small power system and etc. Performed quality inspection of leak testing for Instrument Airline and impulse tubing, Prepared and issues non-conformance report, surveillance report and quality control inspection report for materials and installation, Participates for RCM (Reliability Centered Maintenance) Prepared and submit shutdown Plan for joint activity with operation and maintenance prior for closing NCR and Building hand over Punch list. Assist in revision and development of written electrical and instrument maintenance procedures and techniques, Provide Preventive and Corrective action, surveillance report. Show less

    • Samsung Engineering MENA Region

      Nov 2021 - now
      QC Electrical, Telecom Inspector - Project Completion / PMCC Hand Over, HUGRS - Aramco Project)

      ARAMCO Approval reference No: QA/QC Electrical Inspector Inspector-HUG-L-SA-SS-2002/Ref: HUG-L-SS-SA-2500 QA/QC Telecom Inspector-HUG-L-SA-SS-1300/Ref: HUG-LSS-SA-1534Global ID No: SA222042Review Contract and subcontract specifications, typical inspection plan, inspection checklists, vendor/manufacturer’s documents, method statement procedures, Conduct daily internal site inspections/surveillance to monitor the construction activities, provided necessary quality supports, and issued pro-active notification to the field discrepancies encountered to avoid standard violation, Prepare Documentations: EPM system, NCR, RFI, IFC drawing, Pre- Commissioning test Report and Energization Packages as per SATIP/ SAIC. Assist E&I Quality Pre-comm., Testing in accordance project requirement such as SWGR, Motor, Cable, Power & Protection, Grounding/Lightning system, CP Protection, Lighting and etc. Coordinate with the client representatives.Conduct PMCC Punch closes-out with PMT, Proponent and initiator, Managed and responsible for verifying all punch list clearance associated with the work scope of project activities for Electrical, Instrumentation, Telecom and other disciplines for Process, Non-process Yes and, No” Punch Item, Managed and ensured the timely and accurate completion from installation stages to final acceptances, submission of Energization Packages, Re –Reinstatement, Final Box-up, Quality documents review and Final visual, Discussed and solved technical problems with client and vendor’s, Monitoring and daily follow-up the issue prior to achieve PMCC final completion target date, Lead and facilitate verification of work that must be completed on as particular area, ensured any outstanding INCR’s and LBE’s where applicable are closed out prior for area hand over. Attend weekly Meetings for updating PMCC punch list with client, finalized target date and provide smart solution to achieve project completion / Strong knowledges in Work Permit system (WPR). Show less

  • Licenses & Certifications

    • ISO 9001 Quality Management System Lead Auditor (QMSLA) - Quality Certification

      CQI-IRCA through QACA CLASS
      Jan 2022
    • Passed the CBT in PID Communication Inspector Qualification Exam

      Pearson VUE
      Dec 2021
    • Passed the CBT in PID ELECTRICAL Inspector Qualification Exam

      Pearson VUE
      Dec 2021
    • Passed the CBT Exam PID Instrumentation Inspector Qualification Exam

      Pearson VUE
      Sept 2020
    • Certified Lean Six Sigma Green Belt

      The Council for Six Sigma Certification (CSSC)
      Nov 2022
      View certificate certificate
    • CertifiedLean Six Sigma Black Belt

      The Council for Six Sigma Certification (CSSC)
      Nov 2022
      View certificate certificate
    • Associates Engineer

      Institute of Integrated Electrical Engineering Students MSU-IIT
      Jun 2017
    • Certified Fiber Optic Technician (CFOT) No. 7280975

      The Fiber Optic Association, Inc. (FOA)
      Sept 2018
    • Project Management Professional (PMP)

      IMC Institute
      Nov 2022
      View certificate certificate
  • Honors & Awards

    • Awarded to Philip T. De Luna
      Best Employee Award Jizan Terminal Project Jan 2020 Best employee Award
    • Awarded to Philip T. De Luna
      best employee award Jeddah South power plant Oct 2017 Best Employee Award
  • Volunteer Experience

    • Associate

      Issued by Institute of Integrated Electrical Engineering Students MSU-IIT on Oct 2015
      Institute of Integrated Electrical Engineering Students MSU-IITAssociated with Philip T. De Luna
    • Member Board Of Directors

      Issued by ComSoFil Riyadh on Jun 2008
      ComSoFil RiyadhAssociated with Philip T. De Luna
    • Associate

      Issued by PICS - Philippines Instrumentation and Control Society on Aug 2016
      PICS - Philippines Instrumentation and Control SocietyAssociated with Philip T. De Luna