Petar P.

Petar P.

Site Manager

Followers of Petar P.602 followers
location of Petar P.Västerås, Västmanland County, Sweden

Connect with Petar P. to Send Message

Connect

Connect with Petar P. to Send Message

Connect
  • Timeline

  • About me

    Technical Manager at Andersson&Sjöblom Technical Management Group

  • Education

    • University of Nis

      1996 - 2004
      M.Sc. Civil Engineering/Construction
    • University of Nis

      1996 - 2004
      Master of Science (M.Sc.) Structural Engineering
  • Experience

    • Angoplanum Lda

      Jan 2005 - Jan 2006
      Site Manager

      Monitor progress, oversee delivery of materials and carry out safety checks and sort out various problems.

    • GP "Planum" a.d.

      Jan 2005 - Jan 2006
      Trainee, Site Engineer

      I was a team member for project documentation with main responsibilities such as drawing AutoCAD plans, daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site, preparing individual project schedules for tunnels, based on the master schedule. I was head of Sector excavation and support units for the tunnels number 6, 7 and 8.

    • Inter Inženjering Grup d.o.o.

      Jan 2008 - Jan 2009
      Structural Engineer

      Building design, modeling, static calculations, drawing formwork and reinforcement details.

    • Sogeco S.A.

      Jan 2012 - Jan 2013
      Site Engineer

      I was responsible for organization and coordination of contractors and staff on site in order to realize the dynamics of labor, maintaining regular meetings and informing the supervisory authority through daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site. I was responsible for the quality of works.

    • Dinarik Sr d.o.o.

      Jan 2013 - Jan 2015
      Project Engineer

      I was responsible for organization and coordination of contractors and staff on sites in order to realize the dynamics of labor, maintaining regular meetings and informing the supervisory authority through daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site. Establishing master schedule basis for overall time management and control of the individual projects, preparing individual project schedules for land side construction, based on the master schedule. I was responsible for preparation of method statements for all operations, daily reports of the engaged resources, daily and weekly programs of works, requests for Inspection. I was responsible for the quality control of works. Show less

    • Freelancer

      Jan 2015 - Jan 2018
      Structural Engineer

      Building design, modelling, static calculations, drawing formwork and reinforcement details.

    • Andersson&Sjöblom Technical Management Group

      Feb 2018 - now
      Technical Manager

      • Project Management • Project Planning • Construction of transmission lines • Construction of substations

  • Licenses & Certifications

    • Entreprenadjuridik

      EGA
      May 2023
    • AMA Anläggning 20

      Teknologisk Institut AB
      Nov 2020