EHAB ELSAKA , (PMP)®

EHAB ELSAKA , (PMP)®

Structural Design Engineer

Followers of EHAB ELSAKA , (PMP)®230 followers
location of EHAB ELSAKA , (PMP)®Jeddah, Makkah, Saudi Arabia

Connect with EHAB ELSAKA , (PMP)® to Send Message

Connect

Connect with EHAB ELSAKA , (PMP)® to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Alexandria University

      2000 - 2005
      Bachelor of Engineering - BE Civil Engineering
    • Alexandria University

      2000 - 2005
      Bachelor's degree Civil Engineering
  • Experience

    • DAR AL EMARAT CONSULTING OFFICE (AL-AIN UAE)

      Jul 2005 - Sept 2008
      Structural Design Engineer

      Development of Structural Design Schemes for Many Residential Buildings and Supervision While Implementation

    • ALNASR COMPANY FOR CONSTRUCTIONS

      Oct 2008 - Dec 2009
      Site Manager

      Implementation of Drinking water purification plant with a capacity of 1000 L/S) (project value 90,000,000 EGP)Project Components:1- Pump StationInlet From River Nile Building, Raw Water Pump House, 4 units Raw Water Clarificators with flush mixing Basin, Filters Building, Filtered Water Tank, Filtered Water Pump House, Sludge Drying Beds, Electrical Generator Building, Store Building, Laboratory Building, Mosque Building, Administration Building, Control Building The Outer Fence, Site Roads, And Landscaping Show less

    • MADHAMEEN EST FOR CONSTRUCTIONS

      Dec 2009 - Dec 2015

      Implementation of Pump Station and Irrigation Network with Farms Outlets in Alhasa KSA (Sec No#5 Phase No#4) (project value 93,000,000 SR)Client: Al Hasa Irrigation and Drainage AuthorityProject Components:1- Pump Station(Pump House Building With 7 Pumps Capacity 1100 L/S Each, Electrical Generator Building With Under Ground Fuel Tank, Electrical Transformer Building, Control And Scada System Building, Administration Building, Outer Fence, And Site Landscape 2- Main Pipe Line Network(GRP) Pipes Diameter 1400 -600mm With Total Length 18,000 Meters, with Flowmeters Chambers, Butterfly Valve Chambers,Washout Chambers, Air Release Valve Chambers,3- Lateral Pipe Line Network (HDBE) Diameter 250mm With a Total Length of 78,000 Meters4- Farms Outlets with Diaphragm ValvesFarms Outlets with Diaphragm Valves Controlled by Scada System with a Total Number 3200Farms Outlet) Show less

      • Project Manager

        May 2013 - Dec 2015
      • Project Manager

        Dec 2009 - Jun 2013
    • Mohammed Abdulmohsin Al-Kharafi & Sons

      Jan 2015 - now

      Implementation of transmission water pipeline from BRIMAN to QUIZA including the pump station in BRIMAN (JEDDAH - KSA) (PROJECT VALUE: (320,000,000 SR)Client: National Water Company(NWC)Project Components:1- Main pipelineCarbon steel pipe Pipeline of about 18 km length of 1800 mm Dia to convey water pumped from the site of the pumping station in Breiman to the reservoirs at the Quizah siteThe pipeline includes control valve rooms, air valve rooms, washout and 5 tie-in points) at a total cost of the pipeline segment 168,808,104 SAR= 52.78% of the project value,2- Pump station water pumping station with a capacity of 440,000 m3/day to pump water from the site of the strategicBreiman reservoirs to the Quizah reservoirs, which are about 18 km away.The pumping station consists of (Pump room, electrical room, workshop, diesel generators with fuel storage tanks, surge tanks with compressor room building, water balancing tanks, fire water utility building with fire water tanks, SEC electrical building, and security room building) with a total value for the pumping station part 151,051,783 riyals= 48.22% of the project value Show less Reinforcement of Community Irrigation System Phase Ill Al Jubail Industrial City KSA (project value: 89,000,000 SR)Client: Royal Commission for Jubail and YanbuProject Components:1- Pump Station(Pump Station Inlet, Pump House Building With 4 Pumps Capacity 33 L/S Each, RTR pipes lines irrigation network, Electrical Transformer Building, chlorination system, Control, communication, CCTV, fire alarm And Scada Systems)2- Replacement and Upgrading for the Existing Irrigation Remote Controllers (50 Units)3- Beautification of The Urban Roads and Interchanges,(Main Pipe Line Network Of (UPVC) Pipes varies Diameters (315-25) mm With a Total Length of 108,000 Meters, horizontal directional drilling under the roads, Washout Chambers, Air Release Valve Chambers, direct buried valves, solenoid valves Con trolled By Scada System, decorated reinforced concrete retaining walls with total length 14,000 m, hard &soft landscaping, flood lights &up lights 1200 units, and master remote controllers 19 units. Show less Implementation Of Pump Station and Irrigation Network With Farms Connections In Al Hasa KSA (SEC NO#1 PHASENO#7)(project value 40,000,000 SR)Client: Al Hasa Irrigation and Drainage AuthorityProject Components: 1- Pump StationPump Station Inlet, Pump House Building With 4 Pumps Capacity 33 L/S Each, RTR pipes lines irrigation network, Electrical Transformer Building, chlorination system, Control, communication, CCTV, fire alarm And Scada Systems)2- Main Pipe Line Network(GRP) Pipes Diameter 800&600 mm With Total Length 5,000 Meter, with Flowmeters Chambers, Butterfly Valve Chambers, Washout Chambers, Air Release Valve Chambers,3- Lateral Pipe Line Network (HDBE) Diameter 250mm With a Total Length of 30,000 Meters4- Farms Outlets with Diaphragm ValvesFARMS Outlets with Diaphragm Valves Controlled by Scada System with a Total Number of 1200 Farms Outlets) Show less Implementation of Irrigation Network with Farmers Connections in Alhasa KSA (Sec NO#7 Phase NO#S) (project value 80,000,000 SR)Client: Al Hasa Irrigation and Drainage AuthorityProject Components:1- Main Pipe Line Network(GRP) Pipes Diameter 800&600 mm With Total Length 21,000Meter, with Flowmeters Chambers, Butterfly Valve Chambers, Washout Chambers, Air Release Valve Chambers,2- Lateral Pipe Line Network (HDBE) Diameter 250mm With a Total Length of 85,000 Meters3- Farms Outlets With Diaphragm ValvesFarms Outlets with Diaphragm Valves Controlled by Scada System with a Total Number 2300Farms Outlet), Show less

      • Project Manager

        Jun 2022 - now
      • Project Manager

        Sept 2018 - Jun 2022
      • Project Manager

        Nov 2017 - Nov 2018
      • Project Manager

        Jan 2015 - Sept 2018
  • Licenses & Certifications

    • ISO19011 guidlines for auditing managment system

      QSCert Middle East
      May 2018
    • PMP® Certification Training Course

      PM-Tricks
      Oct 2021
    • Civil Engineer

      Saudi Council of Engineers
    • 5DAY construction managment safety traning

      Royal Commission for Jubail and Yanbu
      Feb 2020
    • BS OSHAS 18001:2007 - OH&S Mangment System Standard

      QSCert Middle East
      May 2018
    • Project Management Professional (PMP)

      Project Management Institute
      Oct 2023
      View certificate certificate
    • ISO 14001;2015 Environmental anagmemnt system standard

      QSCert Middle East
      May 2018