Mohsin Mohammed

Mohsin mohammed

bookmark on deepenrich
Followers of Mohsin Mohammed202 followers
  • Timeline

  • About me

    Senior Mechanical Engineer at Drake & Scull International PJSC

  • Education

    • Vidya niketan high school

      2004 - 2008
      Bachelor of engineering (b.e.) mechanical engineering a
    • Mannan institute of science of technology

      2003 - 2008
      Bachelor of technology (btech) engineering mechanical engineering b
  • Experience

    • Othman saleh al gamadi contracting co

      Nov 2008 - Jan 2009
      Mechanical site engineer

      Performed installation and tested sewage and water lines.2) Inspected all materials associated with plumbing such as pipes.3) Coordinated with contractors on project.4) Performed tests on equipment and materials in accordance to specifications and codes.5) Guide the plumbing supervisor.6) Inspection and pressure testing of pipes7) Installation of sanitary sewer, oily water & utility water lines8) Wet type sprinkler Installation of automatic system and wet chemical fire extinguishing. Show less

    • Saudi bin ladin group

      Mar 2009 - Aug 2011
      Mechanical site engineer

      1) Performed installation and tested sewage and water lines.2) Inspected all materials associated with plumbing such as pipes.3) Coordinated with contractors on project.4) Performed tests on equipment and materials in accordance to specifications and codes.5) Guide the plumbing supervisor.6) Inspection and pressure testing of pipes7) Installation of sanitary sewer, oily water & utility water lines8) Wet type sprinkler Installation of automatic system and wet chemical fire extinguishing. Show less

    • Drake & scull international pjsc

      Sept 2011 - now
      Senior mechanical engineer

      1) Execution of piping works of sanitary sewer system, fire water lines, chilled water piping, high pressure portable & non portable water lines, fire protection system, testing and commissioning of workshop equipment.2) Studying detail structures of a project for Plumbing, Fire Fighting and Air/Conditioning.3) Material Take off and Material Request.4) Planning the material and manpower requirement & work to be done as per the program.5) Guiding the draftsman for preparing the As-Built drawing for the consultant approval.6) Attending Project progress meeting and coordinating meeting with main contractor, consultant and client Submittal and approval of material and equipment as per specification7) Monitoring site store, assuring safe storage and handling of site material.8) Supervision and coordination with draftsman.9) Promote work and motivate worker’s toward given specified job in pleasing manner.10) Coordinating with supplier for material requirement as per delivery schedule.11) Coordinated with contractors on project.12) Performed tests on equipment and materials in accordance to specifications and codes.13) Guide the plumbing supervisor.14) Preparation of Daily & Weekly program based on one month look ahead program.15) Coordination with all other services like Architectural & Electrical, etc towards successful completion of project. Show less

  • Licenses & Certifications

    • Autocad,

      Jul 2007
    • Process piping

      May 2007