Reddy Nagaraju

Reddy Nagaraju

Assistant Electrical Engineer

Followers of Reddy Nagaraju574 followers
location of Reddy NagarajuVijayawada, Andhra Pradesh, India

Connect with Reddy Nagaraju to Send Message

Connect

Connect with Reddy Nagaraju to Send Message

Connect
  • Timeline

  • About me

    Renewable energy professional with 11+years of experience

  • Education

    • DMS SVH COLLEGE OF ENGINEERING

      2008 - 2012
      Bachelor’s Degree Electrical and Electronics Engineering A

      Graduation

    • Nagarjuna University

      2008 - 2012
      Bachelor of Technology (B.Tech.) electrical and elctronics engineering distenction

      Activities and Societies: national service scheme member and active team player Graduation

  • Experience

    • Greenko Energies Pvt Ltd

      Oct 2012 - Oct 2014
      Assistant Electrical Engineer

      • Execution of USS erection work as per approved drawing, Co-ordination with HT line contract team to track the project status.• Erection, commissioning and testing of CT, PT & VCB etc.• Installation And Commissioning of 33kv HVAC transmission lines on poles. • Operation and maintenance activities of 220/33kv substation, As a Team lead and active team member.• 33kv Line maintenance and isolator alignment work.• Monitor and track project progress and managing a team of electrical supervisors and technicians.• Regular updating to management on the status of all the Project activities & load details.• Designing and review of LV system, light and power distribution, low current systems, emergency services and fire alarm systems.• To monitor the Turbines through Wind SCADA & ensure 100% availability.• Trouble shooting for 33kv yard equipment with reference of drawings and cable schedule.• Preparation of daily generation reports, MIS reports and maintaining substation documents. Show less

    • Continuum Wind Energy Pvt Ltd.

      Nov 2014 - Jul 2017
      Engineer- OMS

      • Installation of 33kv HT yards and 33kv line, Which includes 2.5MVA Transformers, VCB, CT, PT, Battery banks, control relay panels, Isolators And LA in double pole structures. • Laying, installing and terminations of 690V to 33KV UG power cables from power generating plant to control unit. • Monitor and track project progress and managing a team of electrical supervisors and technicians.• Regular updating to management on the status of all the Project activities & load details.• Commissioning of 33kv switch yards and preparing punch points in yards And HT line.• 33KV Line maintenance and isolator alignment work.• Operation and maintenance activities of 220/33KV substation, as a Team lead and active team member.• Trouble shooting for 33KV yard equipment with reference of drawings and cable schedules.• Operation and maintenance of Skid mounted substation(SMS).• Planning and preparing the schedule for preventive maintenance and manage the machinery and resources management.• Preparing Daily and Monthly Generation reports, MIS reports and well known with the Substation documentation. Show less

    • VESTAS WIND TECHNOLOGY INDIA PRIVATE LIMITED

      Jul 2017 - May 2019
      Engineer-BOP

      • 220kv bay extension and transmission line constructions are completed within a project deadline.• successfully completed all the HOTO process between project and operations team.• Attended all the breakdown and preventive maintenance activities of 220/33kv pooling substations.• Material and contractor management at site for all the preventive Maintenance of 33kv transmission line, HT yards and pooling substation.• skill development to the contract employees by providing various technical and safety related trainings.• stabilize the site connectivity by trouble shooting all the IT devices and OFC network restoration.• Error analysis for the different service providers and notifying them till closure. Show less

    • Axis Windfarms Anantapur pvt ltd

      Jun 2019 - now
      Deputy Manager

      • 210MW wind assets and 40MW Solar assets management in different states.• Due diligence for the solar and wind assets from operational point of view before Mergers and acquisition.• Successful implementation of all 15 elements in wind site, which fall under worker culture, management culture and expert culture. • Enhancing safety procedure implementations and employee training to adopt the safety culture at site.• Budget preparation and handling for all the sites related to operations Opex and Capex.• Ensuring team to follow all the required compliance through PWC portal.• Enhancing site related issues like security, land, safety compliances and documentation etc.,• Continuous follow ups with Forecasting service providers for accuracy and applying different strategies to get minimum DSM penalty.• value creation projects to get additional revenue for the existing projects.• Service agreement negotiations and contractor management.• Identified issues, analysed information, and provided solutions to problems.• Preventive and breakdown maintenance of 220/33kv PSS, 33kv Transmission lines, HT yards and turbines through central maintenance monitoring system (CMMS).• Provided number of trainings to service provided to enhance their performance towards technical and other aspects.• Closely worked with service provider for required documents, audits to get the CDM benefits on time. Show less

  • Licenses & Certifications

    • Work at heights

      Global Wind Organisation
      Dec 2021
    • Lean Six Sigma Green Belt

      KPMG
      Jan 2023
    • NEBOSH International General Certificate in Occupational Health and Safety

      NEBOSH
      Nov 2024
    • Auto cad

      CMTES Informatics (P) Limited
      May 2012
    • Certificate automation professional

      Automatic Control Systems
      Aug 2012