Harshal Sherekar

Harshal Sherekar

Asst Team Manager

Followers of Harshal Sherekar232 followers
location of Harshal SherekarDubái, Emiratos Árabes Unidos

Connect with Harshal Sherekar to Send Message

Connect

Connect with Harshal Sherekar to Send Message

Connect
  • Timeline

  • About me

    Lead Engineer - Energy at Emirates Global Aluminium (EGA​)

  • Education

    • B.E.E India

      -
      Certified Energy Manager and Auditor from B.E .E India Energy Efficiency
    • National Power Training Institute, Gopal Nagar

      1999 - 2000
      Post graduate Diploma Thermal Power Plant Engineering
    • Rani Durgavati Vishwavidyalaya

      1995 - 1999
      Bachelor of Engineering (B.E.) Mechanical Engineering
  • Experience

    • CLP India Pvt. Ltd.

      Aug 2000 - Mar 2004
      Asst Team Manager
    • CLP India Pvt Ltd

      Apr 2004 - Jan 2007
      Deputy Manager: Operation
    • CLP India Pvt. Ltd.

      Jan 2007 - Dec 2009
      Team Manager ( shift Incharge )

      Key Responsibilities:- Lead Shift team to ensure safe and efficient operation of the plant.- To act as Operation head on need basis.- Processing PTW/LOA safety documents on NISOFT and Coordination with Maintenance team for maintenance planning- Coordination with Load Control Center (Gujarat), Regional electricity Board (West India) and Gas suppliers like G.S.P.L and CAIRN for power dispatch, availability and managing gas contracts operational agreements in terms of gas nomination, TOP and other daily requirements.- Worked as Maintenance Coordinator in CLP to ensure smooth coordination of maintenance planning with maintenance team to achieve the plant availability and reliability at the highest level.- Preparation of all routine operation and availability reports.- Hand on Experience of Maximo Software.- To conduct routine safety audits and review of risk assessments.- Preparation of Safety procedures and standard operating procedures.Key Achievements: Experienced working with CLP in Hongkong for One year under international regional development program and exposed to world class best practices in power plant business Key Project Member involved in successful completion of project execution planning, erection, commissioning of NG Station Extension at site.  Handled successful implementation of NISOFT Permit system Formulate the Strategy for Compressor offline/online washing for the V94.2GT on site Show less

    • Ras Girtas Power Company

      Jan 2010 - Dec 2018
      Shift Incharge

      - Experience: -Lead the shift team in safe operation, monitoring of 8 X 235 MW gas turbines supplied by MHI, 4 x260 MW Steam Turbines and 6.49 X10 MIGD Desalination and potable water plants.- Ensure to maintain the plant reliability and availability at the highest level.- Ensure to operate the plant safely within the PWPA and Environmental limits and to achieve the Plant KPIs set by the management. - Lead the Operation Team in absence of Lead Operation Engineer on need basis.- Senior Authorized Person by Kahramma for switching on 400KV Grid located inside RGPC boundary.- Played Key role in Establishing PTW system on site , trained staff, contractor in PTW system, - Actively involved in developing and training the operation team for plant operation.Key Achievements: Established the PTW system on site. Played Key Role in timely commissioning of 400KV GIS on site. Proposed MDI modification project which is having huge potential of water conservation and commercial benefit to the Company.Played key role in resolving the Cooling tower make up Issue. Show less

    • Emirates Global Aluminium (EGA​)

      Apr 2018 - now
      Lead Engineer - Energy

      EGA’s Jebel Ali power plant has 23 Gas Turbines including GT 13E2 from Alstom , GE frame 9E , Frame 9B, Frame 5 and seven steam turbines with a total generating capacity of 2,350 megawatts.Jebel Ali site also has a desalination plant with a capacity of 30 million gallons (136,000 cubic metres) of water per day, meeting both water needs and supplying external water customers. Roles and Responsibilities :Responsible for High Voltage and Low Voltage switching and ensure release of plant through issuing of safety documents to maintenance.Interact with Potline supervisor for power reduction and rectifier isolation on HV, LV and Plant Outage.Identifies problem area of plant and equipment, diagnose fault and take corrective actions to minimize production losses arising from Plant Outage.Support Sr. Manager in initiating power shutdown as required and also ensure power restoration activities with minimum disruption in the event of emergency.Support the Sr. Manager to ensure the correct power flows, power flow simulation studies, fault level calculations and coordination with control room staff and handling of high voltage equipment abnormalities.Ensure all shift staffs are trained across the operational area to carry out all duties in safe and effective manner. Show less

  • Licenses & Certifications