Mohamed Omar

Mohamed Omar

MEP Design Engineer

Followers of Mohamed Omar1000 followers
location of Mohamed OmarEgypt

Connect with Mohamed Omar to Send Message

Connect

Connect with Mohamed Omar to Send Message

Connect
  • Timeline

  • About me

    Operation Engineer @ Siemens O&M Power Plant world wide

  • Education

    • Zagazig University

      2006 - 2011
      Bachelor's degree Mechanical Engineering Very good with honors degree

      Academic Qualification :BSc. in Mechanical Power Engineering. Faculty of Engineering, Zagazig University, Egypt.Graduation year : May 2011. Cumulative Grade :"very good with honors degree". Cumulative ranking (mech. Dpt.) : 5th on class.Graduation Project grade "Excellent "

  • Experience

    • SMG for MEP works

      Mar 2013 - Dec 2013
      MEP Design Engineer

      Working at SMG Company for MEP works, Egypt.• HVAC System Design, installation and supervision.• Cooling load calculation and duct design.• Design using Hap, Ductlator, pipe flow wizard, and Autocad.• Drawing single line diagrams and shop drawing.• Fire Fighting System Design, installation and supervision.• Pump selection and pump room design.

    • SMG for MEP work

      Mar 2013 - Dec 2013
      Design Engineer
    • EDRA Power Holdings Sdn Bhd

      Dec 2013 - May 2016
      Power Plant Operation Engineer

      Operation Engineer at EDF (Électricité De France) Egyptian Operating Company (EEOC), & Powertek Berhad.East Port Said Power Plant, 2*341 MW Gas-Fuel Fired Power Plant. (ISO 14001:2004, OHSAS 18001:1999 and ISO 9001:2000 certified ) Currently owned by China General Nuclear Power Corporation CGN. • Working experience with Multi-national Engineers and Technicians from (US, France, Germany, Poland, India and Japan) during annual outage and Major Overhaul.• Operation of Natural Gas/Heavy Fuel power plants.• Inspects the units and its auxiliaries, electrical, mechanical, control and instrumentation equipment condition prior to start-up, during operations and after shutdown.• Preparation of risk analysis for critical maintenance activities.• Performing maintenance work requests and preparation of safety work permits.• Writing incidents reports and summarize feedback.• Performing Operating and Periodic Tests Procedures.• Performing Heat Rate tests and analysis of results. • Outage Coordinator.• Experienced in Electrical and I&C equipment.• Operation of Power plants form DCS (Alstom )• Operation of 220KV switchgear (GIS).• Records all plant/auxiliaries operating data, including all alarms and protective devices being actuated and reports any deviation to the Shift Charge Engineer .• Operation of plant common auxiliaries such as auxiliary boiler, emergency gas turbine, emergency diesel, demineralized water plant, desalinated water plant, And chlorination plant.• Member of emergency response team.• Attends required and non-required training for regulatory compliance as well as personal development.Training ,CoursesAt GP STRATIGIES, https://www.gpstrategies.com/ US Instructor. • Fundamentals of Power Plant Performance for Utility Engineers.• Advanced Performance Analysis and Trouble Shooting For power Plant. (Certified).Port Said East Power Plant, Egypt.• Steam Turbine and Generator Major Overhaul. (Certified). Show less

    • Siemens

      May 2016 - Sept 2016
      Power Plant Operation Engineer " Trainee"

      Training with Siemens, Germany :1- Foundation Training: - Language Training. - Fundamental Training.2- Basic Operation Training "Open Cycle " . - Simulator Training, in Erlangen Siemens training center, Germany. - Component Specific Training (Factory ) * Gas Turbine, in Berlin, Germany. * Generators, in Muelheim, Germany.3- Basic Operation Training " Combined Cycle " - Component specific training " Site Training " * HRSG Training. * Steam Turbine Trainig. Show less

    • EEHC " Egyptian Electricity Holding Company.

      Sept 2016 - Dec 2018

      Responsible for applying Performance & Heat Rate Tests for Egypt's Mega Projects: - New Capital Combined Cycle Power Plant 4800 MW, Cairo, Egypt. - Burullus Combined Cycle Power Plant 4800 MW, Cairo, Egypt. - Beni-Suef Combined Cycle Power Plant 4800 MW, Cairo, Egypt.Applying Performance Tests for all GTs individually and for the whole module (2x2x1).Comparing the results with the Contractual values in EPC Contract. Erection, Commissioning of New Capital Combined Cycle Power Plant 4800 MW . - Erection of Siemens Gas Turbines H Class (SGT5-8000H) and its auxiliary systems( Lube & lift oil sys., HCO sys., Hydraulic oil sys. , seal oil for GT Generator and Natural gas compressors station).- Erection of Siemens Steam Turbines (SST5-5000) and its auxiliary systems.

      • Power Plant Operation & Performance Engineer

        Oct 2017 - Dec 2018
      • Erection & Construction Engineer

        Sept 2016 - Oct 2017
    • Siemens Energy

      Jan 2019 - now

      Remote Shadowing/Operation for Siemens O&M Power Plant world wide Responsible for applying Performance & Heat Rate Tests for Egypt's Mega Projects:- New Capital Combined Cycle Power Plant 4800 MW, Cairo, Egypt.- Burullus Combined Cycle Power Plant 4800 MW, Cairo, Egypt.- Beni-Suef Combined Cycle Power Plant 4800 MW, Cairo, Egypt.

      • Power Plant Operation " ROaaS Team"

        May 2021 - now
      • Power Plant Operation & Performance Engineer

        Jan 2019 - May 2021
  • Licenses & Certifications

    • Steam turbine major overhaul, Power Plants Performance Analysis and Trouble shooting, HVAC system design and maintenance, Fire fighting system design and maintenance.