Engr. Md. Imam Hasan

Engr. Md. Imam Hasan

System Engineer

Followers of Engr. Md. Imam Hasan6000 followers
location of Engr. Md. Imam HasanDhaka, Bangladesh

Connect with Engr. Md. Imam Hasan to Send Message

Connect

Connect with Engr. Md. Imam Hasan to Send Message

Connect
  • Timeline

  • About me

    Sr. Manager-Electrical, Maintenance & Utility at Windy Group, Certified Energy Manager(SREDA)

  • Education

    • Ghatail Cantonment college

      2007 - 2008
      H.S.C Science 3.8
    • Cantoment Board High School, Ghatail.

      2005 - 2006
      S.S.C Science 4.31
    • University of Information Technology and Sciences

      2009 - 2013
      Bachelor of Science - B.Sc. Electrical and Electronics Engineering 3.70 (out of 4.00)

      Activities and Societies: Electro-Fest

  • Experience

    • Brother's Telecom

      Aug 2012 - Feb 2013
      System Engineer

      1. Visit the site daily and report to the boss2. Manage and control the technician3. Work plan4. Network towers are searched all the time

    • A.K.M Knit Wear Ltd

      Feb 2013 - Jan 2014
      Assistant Engineer

      1. Responsible for machine conditions monitoring and reporting the same to the head of operation. Assigned to work as quality inspector for spare parts quality checking.2. Assigned to develop SOP for preventive maintenance 3. Manage and Facing All Electrical Buyer Related Audit 4. Assigned to develop SLD

    • Al-Muslim Group

      Jan 2014 - Jan 2022

      Responsibilities: 1. Utility:Directly monitor & Control below all areas, Power Plant:Responsibility: -a) Troubleshooting, installation, maintenance and repair of the equipment b) Experience about Preventative and Breakdown maintenance of Equipment like Generator, Alternator, Cooling Tower, Pump etc.Boiler: Responsibility: -a) Troubleshooting, installation, maintenance and repair of the equipment b) Experience about Preventative and Breakdown maintenance of Equipment like Boiler, Blower Fan, Blower Motor, Condensate Recovery System, Incineration Boiler, Steam Trap, All types of Valves, EGB, Incineration, TDS Base Automatic Blow down System, Insulation, Burner, Regulator, Solenoid Valve, Softener, etc.Compressed Air:Responsibility: -a) Troubleshooting, installation, maintenance and repair of the equipment b) Experience about Preventative and Breakdown/Shutdown maintenance of Equipment like Compressor Motor, Screw, Panel Board, etc.2. Substation: Have good knowledge about sub-station. Have experience in installation and commissioning of HT-LT Switchgears, Power transformer, PFI, Earthing system, Mesh Earthing System, Lightning Protection System etc. Work of 11KV & 33KV both Sub-Station. a) 12.5 MVA 33KV Outdoor Sub-Stationb) 4 MVA, 1MVA,1.28MVA & 2MVA 11KV Indoor Sub-Station3. Installation: Supervise all kinds of Installation & Commissioning of Sub-Station and other Electrical & Utility equipment including Compressors, Diesel & Gas Generators, etc.4. BBT System:Have a good knowledge of BBT installation, Maintenance and all relevant types of work. Brand: EAE, Megaduct, Automation, 5. Design & Drawing: Have a good knowledgeable in preparation of Electrical Plan & Layout using Auto CAD drawing (Design & Implementation). Electrical as Built Drawing[SLD] 6. Construction Work:Wiring & Load Estimation. Electrical Load Estimation For whole Project, Wiring follows BNBC Code. 7. Buyer Issue: Have work experience with RSC Audit Team Show less Duties/Responsibilities: 1. Utility: Specially assigned for analyzing and troubleshooting to the critical problems of Utility's machineries:Power Plant Capacity = 9.2 MW:Boiler Plant-24 Ton/Hrs :Exhaust Gas Boiler- 4.23 ton/hr.:Compressed Air:Compressors (Atlas Copco 4 units, Belgium, 49.11 cu.m/min. ELGI 4 units=28.571 cu.m/min, Total 8Nos= 77.681 cu.m/min2. Installation: Supervise all kinds of Installation & Commissioning of Sub-Station and other Electrical & Utility equipment including Compressors, Diesel & Gas Generators, CNG Conversion, etc. 3. CNG Conversion:CNG System Capacity 2760 cu.m, RCU- Reducing Control Unit. - 01 Nos, Brand: Intraco CNG, RCU- Reducing Control Unit. - 02 NosPRS- Pressure Reducing System. 01 No. = 200 cu.m, Brand: NAVANA CNG 4. BBT System: Have a good knowledge of BBT installation, Maintenance and all relevant type of work. Brand: EAE, Megaduct, Automation, Naxso- 09 Nos.5. Design & Drawing: Have a good knowledgeable in preparation of Electrical Plan & Layout using AutoCad drawing(Design & Implementation).6. CCTV: Have a good knowledge of CCTV installation and maintain. Total 200 Nos, (Type: Dom, Bullet, PTZ, Varifocul Cemera), 7. Construction Work:All Electrical Related Work for Construction Building, Building 85,000.00 Sq. feet. Wiring & Load Estimation. 8. Substation: Have good knowledge about sub-station. Have experience in installation and commissioning of HT/LT Switchgears, Power transformer, PFI, Earthing system, Lightning Protection System etc. 9. Safety Issue: Have proper knowledge on electrical safety factor standards and experience on implement the safety standards of a factory. Have work experience with ACCORD/ALLIANCE.10. Monitoring & Reporting: Responsible for machine conditions monitoring and reporting the same to the head of operation. Assigned to work as quality inspector for spare parts quality checking. Show less Duties/Responsibilities: 1. Utility: Specially assigned for analyzing and troubleshooting to the critical problems of Utility's machineries:Power Plant Capacity = 9.2 MW:Boiler Plant-24 Ton/Hrs :Exhaust Gas Boiler- 4.23 ton/hr.:Compressed Air:Compressors (Atlas Copco 4 units, Belgium, 49.11 cu.m/min. ELGI 4 units=28.571 cu.m/min, Total 8Nos= 77.681 cu.m/min2. Installation: Supervise all kinds of Installation & Commissioning of Sub-Station and other Electrical & Utility equipment including Compressors, Diesel & Gas Generators, CNG Conversion, etc. 3. CNG Conversion:CNG System Capacity 2760 cu.m, RCU- Reducing Control Unit. - 01 Nos, Brand: Intraco CNG, RCU- Reducing Control Unit. - 02 NosPRS- Pressure Reducing System. 01 No. = 200 cu.m, Brand: NAVANA CNG 4. BBT System: Have a good knowledge of BBT installation, Maintenance and all relevant type of work. Brand: EAE, Megaduct, Automation, Naxso- 09 Nos.5. Design & Drawing: Have a good knowledgeable in preparation of Electrical Plan & Layout using AutoCad drawing(Design & Implementation).6. CCTV: Have a good knowledge of CCTV installation and maintain. Total 200 Nos, (Type: Dom, Bullet, PTZ, Varifocul Cemera), 7. Construction Work:All Electrical Related Work for Construction Building, Building 85,000.00 Sq. feet. Wiring & Load Estimation. 8. Substation: Have good knowledge about sub-station. Have experience in installation and commissioning of HT/LT Switchgears, Power transformer, PFI, Earthing system, Lightning Protection System etc. 9. Safety Issue: Have proper knowledge on electrical safety factor standards and experience on implement the safety standards of a factory. Have work experience with ACCORD/ALLIANCE.10. Monitoring & Reporting: Responsible for machine conditions monitoring and reporting the same to the head of operation. Assigned to work as quality inspector for spare parts quality checking. Show less

      • Manager (Electrical, Maintenance & Utility)

        Jul 2017 - Jan 2022
      • Assistant Manager (Electrical & Utility)

        Feb 2016 - Jul 2017
      • Sr. Engineer (Electrical & Utility)

        Jan 2015 - Feb 2016
      • Electrical Engineer

        Jan 2014 - Jan 2015
    • Windy Group

      Jan 2022 - now
      Manager- Electrical, Maintenance & Utility

      Duties/Responsibilities a) Troubleshooting, installation, maintenance and repair of the equipmentb) Experience about Preventative and Breakdown/Shutdown maintenance of Equipment like Generator c) Experience about Preventative and Breakdown/Shutdown maintenance of Equipment like Boiler, Blower Fan, Blower Motor, Economizer, Condensate Recovery System, Incineration Boiler, Flash Steam Recovery System, Steam Trap, All types of Valves, EGB, Incineration, TDS Base Automatic Blow down System, Insulation, Burner, Regulator, Solenoid Valve, Dosing Pump, Softener, etc.d) Electrical as Built Drawinge) Electrical Single Line Diagram [SLD]f) Air & Steam Line Systemg) Electrical Design & Drawing for New Buildingh) Have work experience with ACCORD/ALLIANCEi) Monitoring & Reporting: Responsible for machine conditions monitoring and reporting the same to the head of operation. Assigned to work as quality inspector for spare parts quality checkingj) Electrical Load Estimation For whole Project, Wiring follows BNBC Code. Show less

  • Licenses & Certifications

    • GHG Emissions(Scope 1 2 & 3) & Science-Based Target Setting

      Engineering Resource Institute (ERI)
      Apr 2024
    • Energy Efficiency in Textile and Garments Industries

      SREDA
      Dec 2019
    • ABC License

      Electricity License Board
      Jan 2021
    • Communications and Soft Skills Development

      Engineering Resources International (ERI) Ltd
      Apr 2021
    • ACCORD on Fire and Building Safety in Bangladesh

      International Accord
      Jan 2017
    • Phase-2: KEEP SAFE

      RMG Sustainability Council (RSC)
      Feb 2024
    • Health & Safety Training

      International Accord
      Jul 2017
    • ISO 14001:2015 (Internal Auditor Course)

      SGS
    • LEDVANCE Middle East FZE

      LEDVANCE
      Apr 2024
    • Power transmission & distribution

      DESCO