Ankur Gupta

Ankur Gupta

Followers of Ankur Gupta412 followers
location of Ankur GuptaGurgaon, Haryana, India

Connect with Ankur Gupta to Send Message

Connect

Connect with Ankur Gupta to Send Message

Connect
  • Timeline

  • Skills

    Actix
    Google earth
    2g
    Tems investigation
    Microsoft office
    3g
    Tems
    Mapinfo
    Drive test
    Network optimization
    Mapinfo 8.5
    Gsm
    Tems investigation tool
    Mcom 4.2
    Actix analyser
    Putty
  • About me

    6 Year 7 Month Work Experience Currently working in IP Access India Pvt. Ltd. This is a well-known organization in the field of Leading Small Cell and Pico cell Wireless Company Head quarter in Camborne ➢ Designation : SME-RF/RNO ➢ Industry : Telecom Small/Femto Cell ➢ Profile : LTE(FDD)/3G RF Optimization Engineer/SME ➢ Key Skill : LTE/WCDMA End to End KPI analysis, Log File Analysis, KPI optimization, performance monitoring, Pre health checkup with help of winfoil, Scft, Cluster Optimization, Neighbors Relations, customer Complaints, TAC-LAC audit Ura, Parameter Audit , Real Time KPI analysis on putty and route cause analysis ICA client and Report Fetching from BO, Small cell and Twin beam additions ➢ LTE(FDD) KPI Analysis and Cluster Optimization from 1st Dec 2012 –till date. ➢ 3g KPI Analysis and Cluster Optimization from 1st Dec 2012 –till date. ➢ 3g and 2g Drive test analysis from 1st Aug 2010 –till date. ➢ 3-month Experience in Nairobi, Kenya with Ericsson operator Zain 3G (AIRTEL/ZAIN) ➢ Working on Hetnet Technologies and Marco/Femto/Pico/Small Cell

  • Education

    • MAHARANA PRATAP ENGINEERING COLLEGE,KANPUR

      2006 - 2010
      Bachelor of Technology (B.Tech.) Electronics and communication engineering A

      Activities and Societies: 1. Organized Technical Fest “TECH-VOUGE-08” in college. 2. “LAN GAMING” Co-ordinator in “YANTRIKI-08” in college. 3. Participated in “Lan gaming” in college (Encarta 09) and secured second position. 4. Participated in “Scienctia” in college (Encarta 09) and made robot and secured first position.

  • Experience

    • MobileComm Technologies India Pvt. Ltd

      Jan 2010 - Nov 2012

      site audit ,scft,2G/3G DRIVE,Overshooting cell,bcch plan check ,and SC check for 3G ,migration activity,costomer compliants,Converting the drive test result to MapInfo Professional,report generation by tems Report generation,Attending all EDGE and GPRS related complaints.Able to analyze coverage holes, knowledge of basic hard optimization in Field like Azimuth change, Tilt change, can guide the Rigger for Field work.Responsible for soft & Physical optimization as per optimization requirement and submit the report.Involved in analyzing Coverage, Quality, and Handovers of the network and Height reduction of GSM Antenna.Network Planning for GSM network using MapInfo, Google Earth.TEMS Pocket Monitor.Familiar in Data-Collection, Optimization tools.Tools UsedMapInfo(8.5),Google Earth.tems investigation 8.0.3 , 9.1 , 10.0.5 , 11.0.4 , 12.2.0 , 13.1.1actix ,Mcom 4.2 Show less

      • RF Optimazation Engineer

        Jan 2012 - Nov 2012
      • RF engineer

        Jan 2010 - Jan 2012
    • Vodafone

      Aug 2010 - Oct 2011
      RF Engineer

      site audit ,scft,2G/3G DRIVE,bcch plan check ,migration activity,costomer compliants,Converting the drive test result to MapInfo Professional,report generation by tems Report generation,Attending all EDGE and GPRS related complaints. Able to analyze coverage holes, knowledge of basic hard optimization in Field like Azimuth change, Tilt change, can guide the Rigger for Field work.Responsible for soft & Physical optimization as per optimization requirement and submit the report. Involved in analyzing Coverage, Quality, and Handovers of the network and Height reduction of GSM Antenna.Network Planning for GSM network using MapInfo, Google Earth.TEMS Pocket Monitor.Familiar in Data-Collection, Optimization tools. Tools UsedMapInfo(8.5),Google Earth.tems investigation 8.0.3 , 9.1 , 10.0.5 , 11.0.4 , 12.2.0 , 13.1.1actix ,Mcom 4.2 Show less

    • Zain KSA

      Oct 2011 - Dec 2011
      3G RF DRIVE TEST ENGINEER

      Site audit ,scft,3G DRIVE,sc plan check ,migration activity,costomer compliants,Converting the drive test result to MapInfo Professional,report generation by tems Report generationAble to analyze Handover Problems, knowledge of basic optimization in Field like Azimuth change, Tilt change, can guide the Rigger for Field work.Responsible for soft & Physical optimization as per optimization requirement and submit the report.Involved in analyzing RSCP, EC/NO, and NAIBHORS of the network and Height reduction of GSM Antenna.See Network Planning for 3G network using MapInfo, Google Earth.TEMS Pocket Monitor.Tools UsedMapInfo(8.5),Google Earth.tems investigation 8.0.3 , 9.1 , 10.0.5 , 11.0.4 , 12.2.0 , 13.1.1actix ,Mcom 4.2 Show less

    • Cellplan Technologies Pvt Ltd - India

      Nov 2012 - Jun 2013
      Rf Consultant

      site audit ,scft,2G/3G DRIVE,Overshooting cell,bcch plan check ,and SC check for 3G ,migration activity,costomer compliants,Converting the drive test result to MapInfo Professional,report generation by tems Report generation,Attending all EDGE and GPRS related complaints.Able to analyze coverage holes, knowledge of basic hard optimization in Field like Azimuth change, Tilt change, can guide the Rigger for Field work.Responsible for soft & Physical optimization as per optimization requirement and submit the report.Involved in analyzing Coverage, Quality, and Handovers of the network and Height reduction of GSM Antenna.Network Planning for GSM network using MapInfo, Google Earth.TEMS Pocket Monitor.Familiar in Data-Collection, Optimization tools.Tools UsedMapInfo(8.5),Google Earth.tems investigation 8.0.3 , 9.1 , 10.0.5 , 11.0.4 , 12.2.0 , 13.1.1actix ,Mcom 4.2 Show less

    • Telecom Network Solutions Private Limited

      Jul 2013 - Mar 2015
      RF optimization engineer

       Working on physical optimization with the help of propogation delay ,SHO factor ,RRC success ,DCR and cell loading from past 6 Month to minimize pilot pollution and improve DCR.  Working on AZQ Drive Test Tool from past 6 Month  Report making (PPT) & Log file analysis using Actix analyzer Tools used- Genex Probe , actix analyzer ,MapInfo 8.5,10,Mcom 4.2, TEMS 8.0.3 , 9.0.1 ,11.0.4,12.0.2,13.0.2,13.1.3,14.0.1 GPS-72  Evaluates and analyzes Pilot Coverage, CPICH, RSCP, Ec /Io, Pilot Pollution, Accessibility and Mobility for Voice, CS 64, and PS Services. Worked on Nokia and Ericsson Bts. Propagation delay Knowledge of Channelization codes, Scrambling Codes, HSDPA.HSUPA. Network Optimization, walk test & Drive-Test. Subscriber's Complaints rectification. Verifying Lat-Long of the Site, Checking Sector Swap, and Rectifying Wrong Azimuths and giving proper Tilts, Checking Defined handovers and defining new handover while working in the field, Data analysis from the drive test log files. Making the necessary changes to improve the network quality.  Analyzing Interference, Call Drops, Rx Quality, Rx Level, Handover failures, etc.  Co-channel (C/I) and Adjacent channel (C/A) Interference analysis. Current Employer: TNS Pvt. Ltd, pune1.Project : Ericsson india, NCR circleDesignation : 3G RF optimizerDepartment : Network Optimization (2 month)Profile : DT coordinate,2G and 3G Drive Test, Site Audits, customer complaints, new site SCFT, Post Processing. Reduced Overshooting site , KPI analysis. 3G-3G and 3G-2G neighbor and DT alignment assigned activity to Drive test engineer. AZQ reports analysis Duration : 1th Jul 2013 –till date Show less

    • Ericsson

      Apr 2015 - Apr 2017
      LTE/3G RNO Engineer

      Working on LTE(FDD) accessibility and Mobility KPIs LTE Audit like LAC TAC and other required Timer and Parameter s and Four Carrier Network for 3G for KPI optimization RRC Success, DCR BCR Improvement Plan for NBH and 24 Hr.Working on Winfoil Tool and ITK for online report and KPI. and troubleshooting, End to End KPI analysis for 3G and LTE Small Cell and Twin beam addition

    • Ip.access

      Apr 2017 - Feb 2021
      Subject Matter Expert femto cell solution

      Working on LTE(FDD) accessibility and Mobility KPIs LTE Audit like LAC TAC and Network for 3G and LTE for KPI optimization RRC Success, retainability and Mobility DCR BCR Improvement Plan for NBH and BBH Working on putty and Winfoil Tool for online report and KPI. and troubleshooting, End to End KPI analysis for 3G and LTE Femto Small Cell and 2GBTS all for IP access Devices

    • Mavenir

      Feb 2021 - Jul 2022
      Senior Member of Technical Staff - II Ops

      Working on ORAN solution ,EPC and LTE(FDD) 3G and 2g femto cell solution and working for IOT, Open RAN system which support all vendor equipmemts also intregrated femto cell with Open RAN .Accessibility and Mobility KPIs LTE Audit like LAC TAC and Network for 3G and LTE for KPI optimization RRC Success, retainability and Mobility DCR BCR Improvement Plan for NBH and BBH Working on putty and troubleshooting, End to End KPI analysis for 3G and LTE Femto Small Cell and 2GBTS all for IP access Devices Show less

    • Mavenir

      Jan 2024 - now
      Lead Engineer
  • Licenses & Certifications

    • Ericsson-NERVE Assessment

      Ericsson
      Aug 2016
    • Ericsson Certified Associate - Radio Network Design

      Ericsson
      Nov 2016
    • Ericsson Certified Associate – Radio Network Optimization

      Ericsson
      Jun 2016
    • Unconscious Bias

      LinkedIn
      Feb 2021
      View certificate certificate
  • Volunteer Experience

    • how to express ericsson

      Issued by Ericsson TIFO challenge on Oct 2016
      Ericsson TIFO challengeAssociated with Ankur Gupta