Misbah Uddin

Misbah Uddin

General Sr. Supervisor QA/QC

Followers of Misbah Uddin190 followers
location of Misbah UddinAl Khobar, Eastern, Saudi Arabia

Connect with Misbah Uddin to Send Message

Connect

Connect with Misbah Uddin to Send Message

Connect
  • Timeline

  • About me

    Quality Control Engineer/Supervisor at Group Five Pipe Saudi

  • Education

    • Govt jamilia institute of Techology

      -
      Bachelor’s of Techology in Mechanical Mechanical Engineering
  • Experience

    • Crescent Steel and Allied Products Limited

      Jan 1989 - Jul 2006
      General Sr. Supervisor QA/QC

      Responsible for maintaining records and destroy the obsolete documents.• To draw & review different tests related to Heat and Product (Bare Pipes) as per API-5L (i.e. Guided Bend, Tensile, Chemical, and Impact testing, etc.)• To check all Production & QC operations randomly and ensure that the procedures are strictly being followed up.• To liaise with the client inspector, whenever required.• To inform the manager about any non-conformance observed in the organization. • Fluoroscopy Testing• On Line UT Calibration & Testing • Radiographic Testing & Interpretation• Visual Inspection• Final QC Pipes Inspection COATING INSPECTION• Inspection of Three layer Polyethylene coating as per DIN-30670.• Inspection of Raychem’s Rayclad 120 heat sink tap coating.CONTROL OF COATING QUALIFICATION TEST• Cathodic Disbandment.• Peel Adhesion• Water Hot Sock.• Impact Strength.• Indentation.INSPECTION OF RAW MATERIAL• HOT ROLLER COIL• WELDING WIRE• WELDING FLEX Show less

    • Group Five Pipe Saudi

      Aug 2006 - now
      Quality Supervisor

      Coordination with clients and Third Party Inspectors for solving onshop inspection issues.• Coordination with QC Inspectors for Carried out Inspection as perMITPS (Manufacturing Inspection & Testing Procedure Specification) & Clients Specs for spiral seam submerged arc welded line pipes.• Recommendations of Repair areas according to applied procedure.• Analysis of defects occurring on daily/weekly basis.• Familiar with PSL 1, PSL 2 & Sour service specification.• Inspection Process Control, Lot size, and randomly.• Carried out Inspection for MPQT pipe (Manufacturing Procedure Qualification Test) first pipe of the order in front of client and Third Party Inspector.• Facilitate the product identification and segregation in respect of process required.• Preparation of Lot /packing list.• Coordination with clients for the final lot inspection. Show less

  • Licenses & Certifications

    • ASNT Central Certification Program Level II - Ultrasonic Testing (ACCP-UT)

      Global Quality Management Services & Certifications
      Aug 2009