Chakrit Udomsilp

Chakrit Udomsilp

Junior Supervisor

Followers of Chakrit Udomsilp90 followers
location of Chakrit UdomsilpMueang Nonthaburi district, Province de Nonthaburi, Thaïlande

Connect with Chakrit Udomsilp to Send Message

Connect

Connect with Chakrit Udomsilp to Send Message

Connect
  • Timeline

  • About me

    Researcher at Electricity Generating Authority of Thailand

  • Education

    • The Prince Royal's College

      1999 - 2005
      High School 3.60
    • Chiang Mai University

      2006 - 2009
      Bachelor’s Degree Mechanical Engineering 3.17
  • Experience

    • Nikon (Thailand) Co.,LTD

      Apr 2010 - Oct 2012
      Junior Supervisor

      Responsibilities:- Control production line (CNC machine process) follow 3 main KPIs (quality, cost and delivery)- Control manpower for optimize output- Plan machine usage for output management- Solve unexpected problems in production line- Design CNC process (Lathe and Milling)- Design tools, jigs and figures for support production line- Read and write technical drawing by using CAD/CAM software

    • Electricity Generating Authority of Thailand

      Nov 2012 - now

      Lamtakong Jolabha Vadhana Hydro Power Plant unit 3-4, Nakhon ratchasima, ThailandPump-Storage Francis Turbine Vertical Shaft with each of 250 MW capacity.Responsible for verify and approve the all of mechanical documents (consist of drawings, calculations, procedures, etc.) for the construction project and also responsible as site engineer for auxiliary system in power plant including cooling water supply system, compressed air supply system, hydraulic oil supply system for main inlet valve and governor system, shaft seal water system, drainage system, oil control system and bearing oil supply system. The scope of works are fabrication, assembly, erection and commissioning. My other important duties is welding engineer who is taking care all welding job in project. Verify the WPS, PQR, WQT and to be NDT inspector which consist of liquid penetration testing (PT), ultrasonic testing (UT), radiography testing (RT). Show less Chulabhorn Hydro Power Plant Renovation unit 1-2, Chaiyaphum, Thailand Vertical shaft Pelton turbine system with each of 23.4 MW capacityResponsible for plan and progress site mechanical works, procurement and verify supplied equipment, inspection for each mechanical process such as dismantle, repair, install and welding process also, consultant for any engineering issues or technical specification, design tools and piping systems for cooling water system, participate in commissioning team, contact with contractor and set up the standard document(ISO 9001) Show less

      • Researcher

        Aug 2020 - now
      • Leader, Mechanical Engineer Team

        Oct 2016 - Aug 2020
      • Site Mechanical Engineer

        Dec 2013 - Sept 2016
      • Mechanical Engineer

        Nov 2012 - Dec 2013
  • Licenses & Certifications

    • Senior Welding Engineer/Welding Engineer

      The Japan Welding Engineering Society (JWES) and The Thai Welding & Inspection Association (TWS)
      Oct 2015