Heriyanto .

Heriyanto .

Supervisor-Process Manufacture Assy.

Followers of Heriyanto .1000 followers
location of Heriyanto .Riau, Indonesia

Connect with Heriyanto . to Send Message

Connect

Connect with Heriyanto . to Send Message

Connect
  • Timeline

  • About me

    Ready for Survey CAD Specialist – Dimensional Control Engineer, Field Engineering, Piping Modeler

  • Education

    • Ikbal M Yos

      2008 - 2008
      Welding Engineering and Inspector Satisfactory
    • Offshore Technology Institute

      2010 - 2010
      PDMS Piping Design Satisfactory
    • PI.n.D Oil & Gas Design Course

      2016 - 2016
      SP3D Piping Mechanical Oil & Gas Design Satisfactory
    • Ladwer Institute

      2016 - 2016
      API 570 - Piping Inspector Satisfactory
    • Universitas Sumatera Utara (USU)

      1994 - 1997
      Diploma Mechanical Engineering Satisfactory

      Activities and Societies: Resimen Mahasiswa

  • Experience

    • PT Panasonic Shikoku Matshusita

      Mar 2003 - Apr 2010
      Supervisor-Process Manufacture Assy.

      • To provide and design tools or jig that required for SMT Process such us: stencil, support block, screen chuck printing, nozzle, PCB pallets, visual inspection template and etc.• Communicate to customer about tools, jig and fixture requirement.• Perform drawing design base on customer requirement.• Communicate and describe drawing detail to Fabrication Engineer regarding of customer requirement and delivery time.• Ensure tools, jig and fixture is fabricate and on time delivery.• To develop Process Management Plan and generate work instruction and manufacturing specification• Breakdown all issue during NPI Build and come out with proposal improvement action for next run. • Look into production method and process, standard time analysis, line balancing, man power requirement calculation.• To handle new project set up and ensure projects will be completed on time and within budget.• Leading and coordinating all resources such us training, jig or tools, methods, parts and system to improve process quality and outgoing product quality.• Perform other duties that may be assigned by Senior Supervisor. Show less

    • PT. Marine CadCam Indonesia

      Mar 2011 - Sept 2012
      Piping Modeler/Designer

      • Carry Out 3D Modeling of Piping, Piping Component, Mechanical Equipment by Tribon Application• Perform 3D Structure and Ventilation Ducting Modeling as Reference During Pipe Routing and Equipment Placement• Monitoring and Coordination of Document Submission such as Approval Drawings, MTO and Construction Drawings are Delivered to Customers / Production on Schedule.• Communicate and Update Drawings to Incorporate with Owner Comments, Design Change Note etc.• Carries Out Bill of Materials or Material Take Off for Requisitions.• Generate Tie-In Piping Register, Piping Arrangement & Isometric, Piping Support Arrangement, Spool Piece Drawing & P&ID Drawing.• Provide Typical Detail of Connection/Penetration & Piping Support.Project Involved:• Ruby Field Development Project (Plumbing & Sanitary for Living Quarter), Client: PEARLOIL (SEBUKU) LTD., Contractor : PT MEINDO ELANG INDAH• 59m Multi Purpose Offshore Support Vessel, Client: KHIAM CHUAN MARINE PTE LTD, Builder: ASL SHIPYARD PTE LTD / ASL MARINE, Class: ABS• 142.5m Submersible, Transportation, Float Over and Launch Barge, Client: SWIBER OFFSHORE MARINE PTE LTD, Builder: PT NEXUS ENGINEERING INDONESIA, Class: BV Show less

    • Bechtel Oil, Gas, & Chemicals

      Sept 2012 - Sept 2016
      Field Engineer-Survey CAD Specialist/Dimensional Control Inspector (Coordinator)

      • To coordinate and arrange all survey jobs as per SWR received and ensures all survey work is fully documented and recoverable (SWR Log).• Daily communication & coordination with Field Engineer and Site Superintendent in respect to planning and performing all required Dimensional Inspections.• Identify and record all out of tolerance dimensions to Field Engineer and expedite rectification of these out of tolerance dimensions by Site. Perform a Re-survey of areas where out of tolerance dimensions were recorded to verify that rectification works have been performed and all tolerances are within the project specification requirements.• Update and maintain Piping As Built data to the Team Works and PMOR system in order to the respective department will be able for getting to know the latest pipe line status.• Generate and review module to module interface point, then highlight out of tolerance to the Site Superintendent/Area Manager & Area Field Engineer to decide repairing action by Module Yard Batam or Job Site Australia.• To control dimensions of the assembled structure, piping, equipment (Fin Fan Cooler, Pressure Vessel) and other items so as to deliver modules with Interface Points (IP's) within the relevant pre-determined tolerances.Project Involved:• Wheatstone Project LNG Plant Mod Yard Batam, Client: Chevron.• Australia Pacific LNG Mod Yard Project , Client: Origin, Conoco Phillips & Sinopec. Show less

    • PT Inti Brunel Teknindo

      Sept 2014 - Oct 2014
      Deputy Lead Surveyor

      • To coordinate and arrange all survey jobs as per SWR received and ensures all survey work is fully documented and recoverable (SWR Log).• Daily communication & coordination with Field Engineer and Site Superintendent in respect to planning and performing all required Dimensional Inspections.• Identify and record all out of tolerance dimensions to Field Engineer and expedite rectification of these out of tolerance dimensions by Site. Perform a Re-survey of areas where out of tolerance dimensions were recorded to verify that rectification works have been performed and all tolerances are within the project specification requirements.• Update and maintain Piping As Built data to the Team Works and PMOR system in order to the respective department will be able for getting to know the latest pipe line status.• Generate and review module to module interface point, then highlight out of tolerance to the Site Superintendent/Area Manager & Area Field Engineer to decide repairing action by Module Yard Batam or Job Site Australia.• To control dimensions of the assembled structure, piping, equipment (Fin Fan Cooler, Pressure Vessel) and other items so as to deliver modules with Interface Points (IP's) within the relevant pre-determined tolerances.Project Involved:• Wheatstone Project LNG Plant Mod Yard Batam, Client: Chevron.• Australia Pacific LNG Mod Yard Project , Client: Origin, Conoco Phillips & Sinopec. Show less

    • McDermott International Inc.

      Dec 2018 - now
      Dimensional Control Engineer / Surveyor

      • To coordinate and arrange survey jobs as per RFI received and ensures all RFI is fully documented and recoverable in Register Log.• To establish dimensional control format and numbering system for capturing each process, stage or location and accommodate project requirement• Assist Lead Surveyor for reviewing project drawings, details design drawing, to review and distribute report to Fabrication, Engineering, QC and related Client• Identify and record all out of tolerance dimensions in the OOT Register table, then weekly updating to the both Production Engineer and Construction Team to expedite rectification of these out of tolerance dimensions.• Work with other discipline and department for any required survey and reporting during fabrication, assemblies and erection stages (Structural, Piping, Mechanical, Electrical, Construction Engineering Team• Generate spreadsheet and CAD report for below items base on the field sheet received from Surveyor:- Concrete block foundation layout, CL’s of concrete block and stools for set shim purpose (shim plate verification)- Dimensional check of structure assembly frame during fabrication and erection stage (fit-up, pre-weld and post-weld)- As-Built structure column position, plumb and beam elevation- Carries out piping layout survey of each module for construction reference- Piping fit-up and post welding dimensional check- As-Built piping coordinate (Piping Interface)• Liaise to Fabrication Coordinator for any Final DC As Built Dossier document prior to submit to Client for getting an approval.• To implement high standard of safe working practice, quality and productivity as well as compliance with the code of business conducts• Perform other duties that may be assigned by Lead SurveyorProject Involved:1. Saudi Aramco Marjan Increment Project Package 01 Offshore GOSP-4 Development2. Total Tyra Redevelopment Project _ TEG Process Platform3. Qatar Gas North Field Expansion Project _ NFE Jacket Structural Show less

  • Licenses & Certifications

    • API 570 - Piping Inspector, Welding Engineering and Inspector, SP3D Piping Mechanical, PDMS Piping Design