Glenn Ferrer

Glenn Ferrer

Section Leader

Followers of Glenn Ferrer434 followers
location of Glenn Ferrerالشرقية الجبيل السعودية

Connect with Glenn Ferrer to Send Message

Connect

Connect with Glenn Ferrer to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at Gruntechnology Corporation

  • Education

    • Colegio de San Juan de Letran

      1994 - 1999
      Bachelor of Science Mechanical Engineering

      الأنشطة والجمعيات:Gamma Sigma Scorpions, Letran Mechanical Engineering Society

  • Experience

    • FCC (Phils) Corp

      Sept 2000 - Jun 2004
      Section Leader

      Scope of Work:1. Prepares work allocation and schedule plans; implements the said plan after obtaining approval from the Assistant Manager.2. Submits to Asst. Manager Report on section activities and other related materials, obtains approval, orders and advice.3. Make known the Business Policy, Company Directives, Memorandum Order and other company regulations and related laws, and work toward their execution.4. Heighten work consciousness in work area, directs and oversees the work of members of the section; implements education of the work area.5. Maintains machineries and equipment as well as look after safety and fire control measure.6. Gives input to the Asst. Manager regarding members of the section; performs or participates in personnel evaluation. عرض أقل

    • NEC-TOKIN Electronics Philippines Inc.

      Dec 2004 - Apr 2005
      Production Group Leader

      1. Implementation and compliance of Company Rules and Regulations, Production Operational Policies and Procedures, and 5’s by direct subordinates.2. Monitor the daily output and records of all items in the Production area.3. Ensure the required quantity of product for weekly shipment.4. Monitor the attendance and work performance of direct subordinates.5. Educates all subordinates by conducting training and orientation.6. Responsible for weekly schedule of subordinates; Monitor and evaluate the performance of the subordinates and provides recommendation for promotion.7. Attend weekly meeting with the Department Head to deliberate on matters regarding the improvements of production activities عرض أقل

    • OGAMI Corporation

      Nov 2005 - May 2006
      Production Assistant Head

      1. Implementation and compliance of Company Rules and Regulations, Production Operational Policies and Procedures, and 5’s by direct subordinates.2. Monitor the daily output and records of all items in the Production area.3. Ensure the required quantity of product for weekly shipment.4. Monitor the attendance and work performance of direct subordinates.5. Educates all subordinates by conducting training and orientation.6. Responsible for weekly schedule of subordinates; Monitor and evaluate the performance of the subordinates and provides recommendation for promotion.7. Attend weekly meeting with the Department Head to deliberate on matters regarding the improvements of production activities عرض أقل

    • Daitoh Precisions International Inc.

      Sept 2006 - Mar 2007
      Production Supervisor

      Scope of Work:1. Implementation and compliance of Company Rules and Regulations, Production Operational Policies and Procedures, and 5’s by direct subordinates.2. Monitor the daily output and records of all items in the Production area.3. Ensure the required quantity of product for weekly shipment.4. Educates all subordinates by conducting training and orientation.5. Do kaizen or improvements inside the production area to minimize the non-conformance, increase productivity, and cost reduction.6. Responsible for weekly schedule of subordinates; Monitor and evaluate the performance of the subordinates and provides recommendation for promotion.7. Maintains machineries and equipment as well as look after safety and fire control measure. عرض أقل

    • Membrane Separation Technology (MST) Trading Inc.

      Jun 2007 - Oct 2008
      Sales Engineer

      Scope of Work:1. Expand the Sartorius filtration products to all Pharmaceutical, Food and Beverages, Electronics, Semi-Conductor, and Industrial Companies nationwide as leading filtration brand.2. Responsible for the delivery of products to our customers and collection of payments.3. Submit Weekly Reports to President/General Manager to evaluate the status of sales and collection.4. Weekly visit to our customers to follow up pending requisition and monitor their requirements.

    • First AVPR Venture Inc.

      Nov 2008 - Nov 2009
      Sales Engineer

      Scope of Work:1. Introduce the Becker Vacuum Pump to all Hospital, Pharmaceutical, Food and Beverages, Electronics, Semi-Conductor, and Industrial Companies nationwide as leading Vacuum System brand.2. Conduct Vacuum Technology presentation for the existing and prospect companies in able to give them knowledge and assistance to vacuum system in different applications.3. Create Vacuum System project to all Hospital, Pharmaceuticals, Food and Beverage, Electronics, Semiconductor, Packaging, and Industrial Companies as part of Energy Conservation and Cost Reduction.4. Responsible for the inquiry and concerns of all customers regarding vacuum system in my area of coverage. عرض أقل

    • Saudi Pipe Systems Co. Ltd.

      Jan 2010 - Mar 2013
      GRP Fittings Engineer

      1. Make design and fabricate the GRP Fittings and Polyurethane Insulation based on standard and customer’s requirement.2. Lay-out a Piping Design using Autocad 2007 and handling installation on site as Project Engineer.3. Lead the fabrication of the GRP Fittings in order to fabricate the material on schedule and deliver the material on time.4. Conduct Technical Support on site regarding the installation and testing of materials.5. Do improvements in the production area to minimize the non-conformance, increase productivity, and cost reduction.6. Responsible for weekly schedule of subordinates and delegate the task properly to ensure zero non-conformance or reject.7. Conduct training and awareness regarding proper GRP Fittings Lamination and Installation procedure. عرض أقل

    • Mastoura for Trading and Contracting Company Ltd.

      Jan 2014 - Jan 2016
      Project Engineer at Saudi Aramco

      1. Spearhead the renovation and repairs of Tank Storage facilities and foundation such as fuel tank storage concrete ringwall, piping concrete support, concrete slope protection of the storage tank, perimeter concrete dike panels, and other concrete support around the tank storage perimeter.2. Identify the scope of work based on the Purchase Order and Saudi Aramco Inspection Worksheet given by the Saudi Aramco Project Coordinator and Inspector.3. Responsible for the planning, scheduling, and execution of the project. Direct reporting to the Project Manager.4. Follow the Saudi Aramco Rules and Regulations and Safety Procedures for the safety of everybody and eliminate the possible destruction on Saudi Aramco properties.5. As Certified Saudi Aramco-Work Permit Receiver, I have permission to acquire work permit in the Saudi Aramco Restricted Area.6. Accompanied by the Saudi Aramco Operation (Permit Issuer) in Joint Inspection at Work Site before the issuance of Work Permit for the following permits: Hot Work Permit, Cold Work Permit and Confined Space Entry.7. Responsible for the daily production and monitor the progress of the project in able to complete the project within the target period of completion. عرض أقل

    • International Security and Communications Co. (ISC)

      Jun 2016 - Jun 2018
      Project Planner and Scheduler

      Scope of Work1. Create CMPS (Contractor's Master Project Schedule).2. Develop well-defined and properly sequenced work activities based on WBS (Work Breakdown Structure) and organize this information into Primavera or MS Project format.3. Create CMPS (Contractor's Master Project Schedule) baseline by identifying the critical milestones and develop manpower loaded schedules.4. Determine lead times in conjunction with various departments and sub-contractors and support. Execution departments on planning, milestone and deliverable for major projects.5. Support Project Management by defining overall time parameters of different project phases and preparing Gannt Charts that distinctly define timelines for each project phase.6. Anticipate schedule, cost and resource deviations and perform overall progress measurement using the EVM (Earned Value Management) approach.7. Update, maintain and compare project progress with the approved CMPS baseline throughout the project lifecycle.8. Update project schedules with progress percentage, prepare narrative explanations of delays, forecast the effect of delays on the critical path and propose required schedule optimizations to Project Manager.9. Identify the risks along the critical path, forecast their impact on the critical milestones and prepare mitigation plans.10. Monitor project milestones and participate in progress review meetings.11. Compose progress reports to help the Management in Project Analysis. عرض أقل

    • Saudi Arabian Kentz Co Limited K.S.A

      Nov 2018 - Oct 2020
      Maintenance Scheduler at Sadara Chemical Company

      1. Technical Support at Sadara Chemical Company as Maintenance Scheduler.2. Do maintenance schedule for Daily Maintenance (Compliance, Repair, and Preventive Maintenance Jobs), Pit Stop and Shutdown.3. Plan and allocate maintenance resources for effective resource leveraging and full net capacity utilization in assigned maintenance area and when utilizing side leveraged resources. 4. Sets net capacity for the craftsbased on information about the area turnaround schedules and related available labor. 5. Update the jobs to be included in the daily schedules. 6. Identify the resource requirements for the scheduled jobs using the plans. 7. Build the daily schedule making the most effective snd efficient use of available resources. 8. Publishes the schedule to Designed Server Location for other Roles to access. 9. Initiates material movement for scheduled jobs. 10. Identifies resource leveraging opportunities. 11. Communicates with Operations on scheduling improvement efforts. 12. Leads scheduling meetings / scheduling improvement efforts. 13. Monitor and review performance measures. عرض أقل

    • Eram Contracting Co.

      Nov 2020 - May 2023
      Maintenance Scheduler at Sadara Chemical Company

      1. Technical Support at Sadara Chemical Company as Maintenance Scheduler.2. Do maintenance schedule for Daily Maintenance (Compliance, Repair, and Preventive Maintenance Jobs), Pit Stop and Shutdown.3. Plan and allocate maintenance resources for effective resource leveraging and full net capacity utilization in assigned maintenance area and when utilizing side leveraged resources. 4. Sets net capacity for the craftsbased on information about the area turnaround schedules and related available labor. 5. Update the jobs to be included in the daily schedules. 6. Identify the resource requirements for the scheduled jobs using the plans. 7. Build the daily schedule making the most effective snd efficient use of available resources. 8. Publishes the schedule to Designed Server Location for other Roles to access. 9. Initiates material movement for scheduled jobs. 10. Identifies resource leveraging opportunities. 11. Communicates with Operations on scheduling improvement efforts. 12. Leads scheduling meetings / scheduling improvement efforts. 13. Monitor and review performance measures. عرض أقل

    • Gruntechnology Corporation

      Jul 2023 - now
      Project Engineer
  • Licenses & Certifications

    • Mechanical Engineer License

      Philippine Professional Regulation Commission
      Apr 2000
    • Professional Accreditation-Mechanical Engineer

      Saudi Council of Engineers | الهيئة السعودية للمهندسين
      May 2022