Vategaonkar Krunal

Vategaonkar Krunal

Followers of Vategaonkar Krunal500 followers
location of Vategaonkar KrunalGujarat, India

Connect with Vategaonkar Krunal to Send Message

Connect

Connect with Vategaonkar Krunal to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager (BOE)

  • Education

    • GATE-2019

      2019 -
      GATE-2019 Mechanical Engineering 483 out of 1000
    • Gyanmanjari Institute Of Technology

      2019 - 2019
      Bachelor of Engineering - BE Mechanical Engineering
    • Shree Swaminaraya High School

      2013 - 2015
      HSC Science 84 %
  • Experience

    • Nirma Limited

      Aug 2019 - Dec 2023

      Operation of captive power plant (Operation of rotating and static equipment) like,✓ 4 X 100 TPH CFBC Boilers backed up by M/s. Lentjes, Germany(3 Nos) and M/s. IJT, India (1 Nos) {105 bar and 505 degree Celsius)✓ 2 X 16.34 MW (M/s. TOYO DENKI, Japan) condensing and extraction steam turbine with Woodward Governing System and related auxiliaries.✓ 1 X 6.4 MW (BHEL) Back pressure steam turbine with Woodward Governing System and related auxiliaries.✓ 1 X 22.85 MW (HTC GREEN SOUL, China) condensing and extraction steam turbine with Woodward Governing System and related auxiliaries.✓ 1 X 20 MW (HTC GREEN SOUL, China) condensing and extraction steam turbine with Woodward Governing System and related auxiliaries.✓ Multistage pumps like Boiler Feed Water pumps (08 Nos), Water injection pumps supplied by M/s. Sulzer India Ltd.✓ Vertical pumps (Capacity 9000 m3/hr-05 Nos) supplied by M/s. Kirloskar Brothers Ltd.• Boiler shutdown jobs like Hydrotest, DP test, 2nd pass and combustor cleaning, APH Checking, Tubes Checking etc.• To look smooth and trouble-free operation of various types of static and rotary Equipment like Various types of Centrifugal Pumps, Centrifugal and Screw Air Compressors by Atlas Copco, Blowers, Fans, Chillers, Centrifuge & Various types of valves.• Also looking for Steam and Power-Balancing in the plant and Emergency Monitoring System (EMS) too• Implementing of standard operating procedures, equipment lock-out tag-out procedures/work permit procedure of power plant as per company rules.• To maintain daily record of steam and water balance, to prepare monthly plant efficiency, plant production and equipment running hour report of the plant.• Recording of daily activities like pump change-over, start and stop timing of all equipment’s, amount of make-up of water and oil, daily water chemistry report and also work-permit entry in logbook and also maintaining the record of daily labor report entry during each shift. Show less

      • Boiler Operation Engineer (BOE)

        Jul 2023 - Dec 2023
      • Power Plant Engineer

        Aug 2019 - Jul 2023
    • Tata Chemicals

      Dec 2023 - now
      Assistant Manager

      Working as Shift Incharge in 129.3 MW CPP which includes safe and efficient operation of following Equipments.* 2 X 135 TPH PF boilers* 2 X 200 TPH cold cyclone CFBC boilers* 2 X 35 TPH AFBC boilers* 129.3 MW CPP which includes Back pressure cum extraction and Extraction cum condensing turbines.* Vertical Centrifugal pumps for Cooling water purpose* Providing Isolation and LOTO procedure for maintenance purpose* Shutdow activities for Boilers and Turbines* Coal handling plant operations * Manpower handling * Steam and Power balance within plant* Co-ordinating with Process departments for better operation within plant.* Preparation and Analysis of daily and monthly report. Show less

  • Licenses & Certifications

    • Certified Boiler Operation Engineer(BOE)

      Gujarat Boiler Board
      Jul 2023
    • ISHRAE Student member

      Indian Society of heating refrigeration and Air Conditioning
      Jul 2018