heru tri kusuma

Heru tri kusuma

bookmark on deepenrich
location of heru tri kusumaEast Java, Indonesia
Phone number of heru tri kusuma+91 xxxx xxxxx
Followers of heru tri kusuma1000 followers
  • Timeline

    Jul 2010 - Jun 2011

    Mechanical Supervisor PT IMS

    PT Marine Survey Indonesia
    Jul 2011 - Dec 2011

    Superintendent Dock Monitoring PT JMPV

    American Bureau of Shipping (ABS)
    Jan 2012 - Mar 2012

    Marine Surveyor/Inspector

    BKI (Biro Klasifikasi Indonesia)
    Mar 2012 - Feb 2019

    Senior Teknikal Service Advisor

    Jotun East Europe and Central Asia
    Mar 2019 - Feb 2021

    Mechanical and Commisioning Supervisor / Inspector

    PT Chandra Asri Petrochemical Tbk
    Cilegon
    Sept 2020 - Apr 2021

    Site Mechanical Package (Piping-Static-Rotating) And Commisioning

    Marubeni Power Systems (Thailand) Co., LTD
    Current Company
    Apr 2021 - now

    Mechanical Piping Inspector

    Worley
    Balikpapan, East Kalimantan, Indonesia
  • About me

    Piping Inspector l Mechanical and Structural Coating l Commisioning

  • Education

    • Diponegoro university

      -
      Bachelor's degree naval engineering
  • Experience

    • Pt marine survey indonesia

      Jul 2010 - Jun 2011
      Mechanical supervisor pt ims

      Mechanical and Docking supervisor- review drawing general arrangement hull ship, Engine layout and Superstructure- Monitoring Hull Inspection welding inspection, NDT Inspection (MT,PT,UT), tank storage inspection and Cleaning, painting inspection, scantling check, Material replating identification.- Liaise with thitd-party to measuring and determine replating on vessel ( ship )- Supervising, inspection and record of fit-up, welding process during replating- monitoring activity replating on hull and superstructure- Engine test include Performance test and safety Device- Piping installation Check- supervise docking hull and superstructure- monitoring activity replating pipe, pump,overhaul and painting- Provide S-Curve project, review contract docking an new building, technical specification review according to client specification Show less

    • American bureau of shipping (abs)

      Jul 2011 - Dec 2011
      Superintendent dock monitoring pt jmpv

      - Machinery and out fitting installation inspection include overhaul main engine, auxiliary engine, stern and rudder alignment, shaft alignment, overhaul propeller and alignment.- Decide schedule docking and responsibility durring Ship Docking- Monitoring UT Activity prior replating- Monitoring replating hull, super structure, main deck, secondary deck and top deck.- Monitoring refurbishment pipe oil, fire hydrant, lubricant, scupper and pipe installation on ship- monitoring overhaul and test perform main engine and auxiliary engine during ship Docking.- Monitoring painting activity during docking bottom, hull and superstructurr.- Evaluate Man power and day schedule- Coordining all docking department mechanical, electrical, Piping and engineer. Show less

    • Bki (biro klasifikasi indonesia)

      Jan 2012 - Mar 2012
      Marine surveyor/inspector

      QAQC Junior Engineerliaise with Shipping Company during Check UT Thickness Plate Bottom and Hull Ship.liaise with Shipping Company and Thirdparty to Marking point to be Replating Hull and Bottom.liaise with Dock Mater during Inspection Construction Vesselliaise with Dock Yard during Inspection Propeller, Cathodic Protection and Superstructure

    • Jotun east europe and central asia

      Mar 2012 - Feb 2019

      Specialist inspection surface preparation blasting, Coating and painting to comply as per specifiction project and Standart ISO, SSPC, NACE, Norshok, BS also Manufacture Data Sheet.check abrasive quality and salt content, surface profile, thickness coating ( wet and dry), Quality result coating , adhession testing also and perform special test such as holiday test, adhesion test as per Client requirement, ASTM Standart, SSPC Standart, ISO Standart and Teknikal data sheet.Familiar with Base coating product, Application guide, Acceptance criteria using International standart Coating and painting for Onshore, offshore, Marine, Oil and Gas, Petrochemichal, FPSO, FSO, Tanker, Tugboat, Marine, Pipeline, Storage tank, Vessel, column destilation, Floorcoating, rubber lining, Field Joint Coating, Galvanized, Thermal spray coating, insulation and Fire proofing. Show less Expertise in Protective Coating , TSA Coating, Splash Zone coating,FBE, Shrink Sleeve Coating, Epoxy Coating, Floorcoating, Powder Coating and insulation and Fireprofing.- Familiar with Base product coating And Technology Coating Product wich use for paint specification Onshore and Offshore like above ground, under ground, Thermal spray aluminium, Marine coating, Protective coating, Powder Coating, Floor Coating, Epoxy Resin Coating, FBE, etc- Experience interpretation and imementation code and international standart Coating, painting on protective, Painting on Marine, power plant, oil and gas also petrochemical.- Familiar with code and Standart Coating & painting also familiar with paint Product use for Structure Fasility such as Tripod Jacket,Flare Tower, Bridge, living quarter, Piping, Piling system for Jetty facility, above ground, splash Zone, underground, marine, Offshore, internal tank, external tank, Vessel, heat exchanger, column etc. Show less

      • Senior Teknikal Service Advisor

        May 2014 - Feb 2019
      • Teknikal Service Advisor

        Mar 2012 - Apr 2014
    • Pt chandra asri petrochemical tbk

      Mar 2019 - Feb 2021

      Has been involved in the engineering, construction, fabrication, Petrochemichal plant. Experience in the Qa/Qc and inspection activities, mechanical installation, welding inspection and nondestructive testing. Has been involved in the installation of mechanical static equipment such as :- Pressure vessel as per API 510 : Vent KO Drum, Open Drain Drum, Closed Drain drum, Fuel Gas Scrubber, Coalescer separator, Slug catcher- Atmospheric tank and spherical tank as per API 650 : Fix cone roof tank, LPG tank- Heat exchanger : Static Cooler API 661 ACHE, Condensate Cooler API 662, Inlet Heater TEMA, Transfer line Exchanger. - Column or Tower Destilation: Gasoline Fractionator, Quench tower, C4 or c5 Hydrogenation reactor and Acetylene converter- Other Equipment : Stack, Ducting, silo, Flare stack, Burner package etc.Understood in interpretation for standard and specification, procedure, drawing, and good knowledge of project specification. skill levels supervision/inspection/technical/documentation. Understand of work sequence for both fabrication & installation include assembly/preassembly. Interpersonal skills, particular the ability to listen/ understand leader, co-worker. I am committed to being professional in my work displaying integrity at all time. Responsibilities of covered, but not limited to the following:- Supervision fabrication for mechanical equipment static, pressure vessel, athmospheric tank, spherical tank, Heat exchanger, column destillation etc- Check quality of the works to ensure the works are comply with standart and contract requirement.-Supervision installation for mechanical equipment - Ensure mechanical works are in accordance with design, drawing and code standart API, ASME, TEMA,ISO and AWS.- Monitoring Project achievement with related to work progress- Monitoring Blasting and painting equipment from fabrication and touch up on site Show less Experience as QA/QC Engineering Fabrication activity such as witnessing / monitoring welderqualification test and welding procedure qualification, Inspection monitoring PWHT activities and review PWHT Chart, Inspection Monitoring and review Test Package,Inspection and monitoring Hydrotest, Review and submission of NDT package prior testing, inspection Witness FAT activities, WPS/PQR, Welding Map, NDE Map, NDE Procedure, Fabrication Procedure, Welder Certificate, NDE Operator certificate, MDR/Dossier.Witness/Monitoring/surveillance fabrication Inspector of Welding Inspection, NDT activities and inspection test Plan, visual Inspection, Dimensional Check, Pressure Test ( Hydro and Pneumatic), Test equipment calibration control, PMI Test, fabrication and Errection Piping Construction, Line Check, Hydro Test, Valve Pressure Testing, Pre-commisioning, piping system, and Mechanichal Package Equipment ( Static – Rotating ). Show less

      • Mechanical and Commisioning Supervisor / Inspector

        Mar 2019 - Feb 2021
      • Fabrication Supervisor and Expiditer

        Mar 2019 - Jul 2019
    • Marubeni power systems (thailand) co., ltd

      Sept 2020 - Apr 2021
      Site mechanical package (piping-static-rotating) and commisioning

      Experience in various Site QA/QC Engineering activity :- Carry out running PQR and welder qualification test based on AWS D1.1 and Asme lX- Review Documen completion before conduct Inspection (Drawing Latest revision approve for inspection, WPS and welder register approve, Material certificate)- Daily Surveillance Erection mechanical Static, Free coupling Rotating and Preservation- Surveillance Fit-Up Inspection- Surveillance preheat temperature comply with WPS/Procedure- Surveillance of Piping Fabrication and erection regarding specification and ASME B31.3- Surveillance pinting qualification test- Surveillance installation and inspection pipe GRE (Glass Reinforced Epoxy) and GRVE (Glass Reinforced Vinyl Ester) - Surveillance HVAC Powerplant system- Surveillance Storage tank inspection as per ITP and API 650- Surveillance welding execution of structural and piping carried out visual inspection-Inspection monitoring PWHT activities and Review and submission of NDT package prior testing- Surveillance inspection Witness FAT activities.- Review WPS/PQR, Welding Map, NDE Map, NDE Procedure, Fabrication Procedure, Welder Certificate, NDE Operator certificate, MDR/Dossier.also Witness/Monitoring/surveillance (as Per ITP) fabrication Inspector of Welding Inspection, NDT activities and inspection test Plan, visual Inspection, Dimensional Check, Pressure Test (Hydro and Pneumatic), Test equipment calibration control, PMI Test, fabrication and Erection Piping Construction, Line Check, Hydro Test, Valve Pressure Testing, Pre-commissioning, piping system, and Mechanical Package Equipment (Static – Rotating).Has been involve installation and inspection equipment such as :Piping system, Pump Installation, Valve installation, Alignment Coupling pump, HRSG System, Steam Turbin Syatem, HVAC syatem, FAT, SAT etcPressure vessel, tank storage, Column Distillation, Heat Exchanger, Condensate, Flare Stack, ducting, silo, Burner package etc Show less

    • Worley

      Apr 2021 - now

      Profesional Experience as QA-QC / Construction Mechanical Piping and Welding Inspector for the Refinery, petrochemichal, power plant, oil and gas, Offshore and Onshore. involved in all Aspect of Project pre inspection Meeting, fabrication and welding, Set-up quality System, Develop Weld map, Non-Destructive test Requirement, Welder Qualification Test, Witness weld procedure and mechanical tested, pipeline and Hot Tap, pipe double Joint.review Specification and Approval Drawing, endorsed compiling Final documentation Package, Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) ensuring all works is carried out to Project specification and Procedure Test, also :Surveillance preheat temperature comply with WPS/Procedure- Review Vendor Documen, Certificate Compliance, Certificate Material, OSDR, MDR etc- Surveillance of Piping Fabrication and erection regarding specification and ASME B31.3- Surveillance pinting qualification test- Surveillance installation and inspection pipe - Surveillance Welding Qualification Test and Welder Test- Surveillance Post Weld Heat Treatment at Fabrication and Site- Surveillance Hardness Test- Witness and Monitoring PIM, Walkdown, Open and Closed Punchlist also HydroTest UG and AG Test Package.- Surveillance Mechanical Static Equipment- Surveillance fabrication activity to fullfil Requirement Quality- Surveillance Mechanical and piping Erection to comply with method Statement Show less Experience as QA/QC Engineering Fabrication activity such as witnessing / monitoring welderqualification test and welding procedure qualification, Inspection monitoring PWHT activities and review PWHT Chart, Inspection Monitoring and review Test Package,Inspection and monitoring Hydrotest, Review and submission of NDT package prior testing, inspection Witness FAT activities, WPS/PQR, Welding Map, NDE Map, NDE Procedure, Fabrication Procedure, Welder Certificate, NDE Operator certificate, MDR/Dossier.Witness/Monitoring/surveillance fabrication Inspector of Welding Inspection, NDT activities and inspection test Plan, visual Inspection, Dimensional Check, Pressure Test ( Hydro and Pneumatic), Test equipment calibration control, PMI Test, fabrication and Errection Piping Construction, Line Check, Hydro Test, Valve Pressure Testing, Pre-commisioning, piping system, and Mechanichal Package Equipment Show less

      • Mechanical Piping Inspector

        Apr 2021 - now
      • Mechanical Fabrication Piping Supervisor/Expiditer

        Apr 2021 - Mar 2022
  • Licenses & Certifications

    • Diploma coating inspector

      Jotun east europe and central asia
      Apr 2012
    • Asnt cri certified radiographic interpreter level ll

      Ut quality
      Jun 2020
      View certificate certificate
    • Asnt magnetic particle test - accp mt level ll

      Ut quality
      May 2020
      View certificate certificate
    • Asnt central certification program level ll liquid penetran

      Ut quality
      Mar 2020
      View certificate certificate
    • Lead auditor 9001 : 2015

      Bsi
      Jul 2020
    • Welding inspector

      Cswip - certification scheme for personnel
      Jun 2020
    • Senior certified coating inspector

      Ampp: association for materials protection and performance
      May 2014
    • Ahli k3 umum dan konstruksi

      Badan nasional sertifikasi profesi
      Jun 2020
      View certificate certificate