Abdul Haris

Abdul Haris

Chief of Civil Works Laboratory

Followers of Abdul Haris101 followers
location of Abdul HarisMakassar, South Sulawesi, Indonesia

Connect with Abdul Haris to Send Message

Connect

Connect with Abdul Haris to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager at PT Kutai Refinery Nusantara

  • Education

    • Hasanuddin University

      -
      Civil Engineer
  • Experience

    • PT Tuju Wali Wali

      Nov 1991 - Sept 1993
      Chief of Civil Works Laboratory

      Lead and manage team to:- Conduct characteristic tests of soil, coarse aggregate, fine aggregate.- Provide mix design of road pavement (Aggregate Class A, Hot Mix Asphalt, Asphalt Treated Base)- Provide concrete mix design- Take sample for control quality during production of productThe project is for the construction of 3 box culverts and 1 fly over which crossing with Section III - Ujung Pandang Inner Ring Toll Road Plan.

    • PT Bosowa Marga Nusantara

      Oct 1993 - Aug 1996
      Project Officer

      Monitor and control progress and quality of field works.The project is for the construction of Section III - Ujung Pandang Inner Ring Toll Road along 11 km from central city to Soekarno Hatta Harbor, include re-alignment and construction non toll road at both side.PT Bosowa Marga Nusantara is a joint venture company between Bosowa Group and PT Jasa Marga (Persero).

    • Kumagai – Kadii Joint Operations

      Sept 1996 - Feb 1997
      Laboratory Engineer

      Lead and manage civil laboratory team to control quality of coarse aggregate production, fine aggregate from subcontractors, compressive strength test of concrete and socrete, pull out test of rock dowel and provide mix design of concrete and socrete, The project is for the construction of tunnel to divert Larona river before proceed Balambano Dam Construction. The length of the tunnel is 265 m. The works include drill and blasting rock, remove rock blasted material to disposal area, rock dowel and wire mesh installation, as well as socrete layering. Show less

    • PT Family Raya

      Mar 1997 - May 1998
      Construction Project Coordinator

      Lead and manage team for construction and maintenance of camp, housing and recreation hall for Senior Staff - PT INCO Expansion Project.

    • Astaldi – Thiess Joint Operations

      Jun 1998 - Jun 1999
      Field Engineer

      Assist and Control Field Team to maintain quality and progress of Rolled Concrete Compacted (RCC) placement.The project is for the construction of Balambano Dam with Rolled Concrete Compacted for producing 128 MW capacity of Hydroelectric Power Plant to support nickel mining activities at PT INCO Sorowako.

    • PT Thiess Contractors Indonesia

      Jul 1999 - Aug 2008

      Lead and manage project for construction of a river canal over the top of bulk dump materials along the western edge of the Jelamu Pit – Satui Mine Project. The project involves, receiving and compacting approximately 2.3 million bcm of selected material from mining operations (equal 1.7 km long of the river).The location of the works is the rivers original position prior to its diversion path around the eastern side of the pit. This was undertaken some years ago however the continuation of the pit excavation in an easterly direction now requires that the diversion by switched back to behind the pit.The project includes for the preparation of bulk fill areas prior to placement of compacted materials (trimming and shaping bulk fill buttress), receiving select fill materials, maintaining the work areas, placing and compacting the materials to the appropriate levels, trimming and preparing final surfaces, drainage works, as well as all works associated with inlet and out-let works. Show less Assist mining team to achieve production targets as per the requirements of time, budget and quality from Company and Client.The project is contract mining operations. The works are include clearing and grabbing, soil stripping, drill and blast for break of overburden and coal, overburden removal, coal mined and haul to crushing plant, and land rehabilitation. At the beginning project in 1999, production target 11 million bcm of OB and 1,2 million tonnes of coal, increased in 2003 to 49 million bcm of OB and 7 million tonnes of coal. Show less

      • Construction Manager

        Jan 2008 - Aug 2008
      • Construction Manager

        Jun 2006 - Dec 2007
      • Senior Project Engineer

        Dec 2005 - May 2006
      • Operations Engineer

        Jul 1999 - Nov 2005
    • PT Thiess Contrsctors Indonesia

      Sept 2008 - Mar 2011
      Project Support Leader

      Ensure that the Company’s objectives are met & to maximize funds employed; lead, organize and provide direction of processing invoices, progress claim, Monthly Contract Evaluation Report, identification of variations in actual vs financial year budget; lead, organize and provide direction of Administration: to control & maintain asset registers for TCI, Client and Sub-Contractors to support the various area of cost on monthly basis and document control procedures are in place and documented.In addition, lead and organize for Infrastructure works (maintenance, replacement and relocation) and building maintenance (camp and office). Show less

    • PT Thiess Contractors Indonesia

      Apr 2011 - Jan 2015
      Deputy Mining Manager

      Manage mining operations, in terms of operational, quality and administration to achieve the target and company goals. There are about 1,300 mining employees spread across at 6 mining pit locations to support the operations of circa 400 heavy equipment and achievement of the annual production and financial target (75 million bcm of waste and 9 million tonnes of coal).

    • PT Petrosea Tbk

      Sept 2015 - Jun 2016
      Construction Manager

      Manage all activities and resources and ensure that the entire process is done safely and its results meet schedule, quality and within the budget provided.The project is for the construction of camp pad and 12 km of road to Plan for Mine Site Lampunut. The scope of work is consist of clearing and grabbing, topsoil stripping, embankment construction (cut and fill), culvert installation, rock protection at inlet and outlet of each culvert, reinstate topsoil, grassing and rehabilitation.

    • PT Sinar Terang Mandiri

      Nov 2017 - now
      Project Manager

      Manage overall responsibility for the successful initiation, planning, implementation of design and specification, budgeting, execution, monitoring, controlling, forming a reliable team work and make sure all risks controlled, minimise uncertainty and rework.The project is for the construction of Toll Road from Ch 14+000 to Ch 39+000. The scope of work includes clearing and grabbing, topsoil stripping, embankment construction (cut and fill), backfill of structure, subgrade preparation, layering base course and flexible pavement. Show less

    • PT Kutai Refinery Nusantara, KRN Project Phase III

      Mar 2019 - now
      Assistant Manager

      Earthwork and breaking of concrete pad, piling, concrete pad foundation of 69 tanks farm and jetty construction

  • Licenses & Certifications

    • Certificate of Competency for Middle Operational Management

      Technical and Environmental Director of Mineral, Coal and Geothermal / Chief of Mines Inspector - Republic of Indonesia
      May 2009
    • Ahli Sumber Daya Air - Madya

      Lembaga Pengembangan Jasa Konstruksi (Construction Services Development Board)
      Jan 2017