Erdem Sunar - CMgr FCMI

Erdem Sunar - CMgr FCMI

Part-Time Network Engineer

Followers of Erdem Sunar - CMgr FCMI618 followers
location of Erdem Sunar - CMgr FCMICarshalton, England, United Kingdom

Connect with Erdem Sunar - CMgr FCMI to Send Message

Connect

Connect with Erdem Sunar - CMgr FCMI to Send Message

Connect
  • Timeline

  • About me

    Technical Project Manager at Nokia

  • Education

    • Edirne Science High School

      2001 - 2004
    • Henley Business School

      2023 - 2024
      Senior Leader Apprenticeship Business Administration Distinction
    • Università di Catania

      2009 - 2009
      Bachelor's degree Telecommunications Engineering

      Erasmus

    • Yildiz Technical University

      2004 - 2010
      Bachelor of Engineering (BE) Telecommunications Engineering
  • Experience

    • Gentel Telecommunications

      Aug 2009 - Jan 2010
      Part-Time Network Engineer

      Part-Time Network Engineer

    • ALCATEL-LUCENT TELETAS

      Mar 2010 - Feb 2012
      Small Cells Global Product Expertise Centre Engineer

      Responsibilities:- Commissioning, integration and testing on the local test lab network.- Documenting and validating BSR Femto product release method of procedures.- Delivering classroom-based workshops on the Femto solution and releases.- Providing on-site and remote project support globally.

    • Alcatel-Lucent UK&I

      Feb 2012 - May 2012
      Integration and Testing Professional

      Responsibilities:- Commissioning, integration and testing of the individual network elements which the Femto clusteris composed of and the overall E2E solution.- Customizing the generic solution documentation and the procedures.- Troubleshooting the issues encountered and raising tickets into Nokia Support.

    • Alcatel-Lucent UK&I (Nokia)

      May 2012 - now
      Technical Project Manager

      Responsibilities:In summary, end-to-end technical project delivery comprised of the following stages but not limited to.- Pre-sales & design support- Detailed project & resource planning working with the PM- Test plan preparation & KPI bench-marking- Project execution- Regular & ad-hoc project status reporting & Customer meetings- Support ticket management, escalations & key decision making- Allocation of tasks to team members, providing guidance, coordination and tracking- Supporting Customer's internal processes, such as change management, operational acceptance,managed services and so on- Support investigation of operational issues and RCA process as and when required Show less

    • Nokia

      Jun 2019 - now
      Technical Project Manager

      IP and Optical Networks - Customer Engineering

  • Licenses & Certifications

    • Nuage Networks Virtualized Cloud Services (VCS) Fundamentals

      Nokia
    • Nokia Scalable IP Networks

      Nokia
    • Chartered Manager Fellow

      Chartered Management Institute
      Jan 2025
      View certificate certificate
  • Honors & Awards

    • Awarded to Erdem Sunar - CMgr FCMI
      Project Management Team of 2012 in EMEA - Olympic Games London2012 Alcatel-Lucent Jan 2013 London was the host city for the Olympic Games - and over 16,000 athletes were arriving en masse promptly on July 12. Purpose-built accommodation was built using a steel frame construction which may have facilitated construction but effectively acted as a Faraday cage - blocking mobile signals and cutting off the village. These young athletes would not be able to tweet or use their phones - a true tragedy in the making!However Alcatel Lucent had the answer using our Femto Solution. The… Show more London was the host city for the Olympic Games - and over 16,000 athletes were arriving en masse promptly on July 12. Purpose-built accommodation was built using a steel frame construction which may have facilitated construction but effectively acted as a Faraday cage - blocking mobile signals and cutting off the village. These young athletes would not be able to tweet or use their phones - a true tragedy in the making!However Alcatel Lucent had the answer using our Femto Solution. The configuration of 1,200 ALU Enterprise Femto cells around the new apartment complex, the largest and most dense deployment of 'indoor' small cells anywhere in the world. The risks were high as this has not been done before and there was no possibility of a revised timeline. This is schedule compression in practice. A very "fixed" end-date imposed on the team, with valuable added (and approved) new scope. Show less
    • Awarded to Erdem Sunar - CMgr FCMI
      Highest Performer Team of 2010 Q2-Q3 Alcatel-Lucent Teletas Nov 2010 Alcatel-Lucent Teletas branch managed to charge a Customer for a training first time within Wireless Vision Trainings for Middle Layer Management programme context. As a contributor of this training team I was awarded in 2010.