Pawel Bielak

Pawel Bielak

Followers of Pawel Bielak669 followers
location of Pawel BielakWarsaw, Mazowieckie, Poland

Connect with Pawel Bielak to Send Message

Connect

Connect with Pawel Bielak to Send Message

Connect
  • Timeline

  • About me

    Chief Tender Specialist in SKANSKA

  • Education

    • Politechnika Warszawska

      2004 - 2009
      Master's degree Civil Engineering
    • Technical University of Gdansk

      2000 - 2004
      Engineer's degree Civil Engineering
  • Experience

    • Skanska Polska

      Apr 2006 - Dec 2015

      Assembling of a corrugated steel culvert, based on a reinforced foundation, placed on a small watercourse near the village of Somianka. Bottom of a watercourse has been sustained with fieldstone. a) Repair of a Leśna street in Nowy Dwór Mazowiecki (412 m)b) Przemysłowa street in Nowy Dwór Mazowiecki (496 m) 2014.11 - 2015.06 Office workTaking part in initial bids in Masovian Voivodeship 2014.09 - 2014.11Repair of a District road 2411W near Pomiechówek 4 km long. - Correction of a road course by its extension- Improved construction of road with the use of two bituminous layers,- public ramps and aggregate shoulder Tunnel under railroad in Ząbki near Warsaw with the reconstruction of a near-road network.- almost 4 km of a complete road construction- sidewalks, bicycle roads, slip roads, parking lots, public ramps and the intersection with Voivodeship Road 631 Office Work in Warsaw and as a Site Manager on the Voivodeship Road 637 Project near Węgrów Highway - A1 Project Phase IISection 4 - Toruń- Motorway Area Service Nowa Wieś - whole construction with sidewalks, and parking lots- Traffic arrangement temporary and taget Highway - A1 Project Phase ISection 6 - Grudziądz - Nowe Marzy- Temporary Roads, Inner roads, Cross roads - whole construction, - Main Roads ramps on road structures- Finishing works

      • Site Manager

        Oct 2015 - Dec 2015
      • Construction Manager

        Jul 2015 - Sept 2015
      • Construction Manager

        Nov 2014 - Jun 2015
      • Construction Manager

        Aug 2014 - Nov 2014
      • Site Manager

        Nov 2012 - Aug 2014
      • Site Manager

        Jan 2012 - Nov 2012
      • Foreman

        Mar 2009 - Dec 2011
      • Site Engineer

        Apr 2006 - Mar 2009
    • Skanska Polska

      Mar 2016 - Apr 2017
      Kierownik Projektów

      My responsibilities mainly involved cost calculation for public tenders, such as:Alteration of 5 streets (totaling 1.6 km) in JózefówModernization of district road nr 1507 near Grodzisk Mazowiecki (1.6 km)Rebuilding of a communal road nr 130424W between Górzno and Wólka Ostrożeńska (5.2 km)Renovation of Środkowa st. in Żyrardów (400 m)Pavement renovation on 8 streets in the Pruszków district region (5.3 km)In addition, I was responsible for budget preparation, ongoing project forecasting, and negotiation with sub-contractors. Show less

    • Skanska

      May 2017 - May 2018
      Senior Specialist

      As a member of the Sales & Marketing Team, I was responsible for cost calculations of various roadwork projects, including the renovation of Voivodeship Road 721 between Mleczarska St. and Julianowska St. in Piaseczno, the development of Bielska St. in Płock, and the reconstruction of Voivodeship Road 888 between Święcice and Zaborów. Another successful project I contributed to was the development of Łukasiewicza St. in Płock, which involved the construction of a roundabout at the intersection of Łukasiewicza and Długa St. Show less

    • Skanska

      May 2019 - now
      Główny specjalista ds. oferowania

      SKANSKA POLSKA restructured and renamed their Pre-construction Team to the Offer Team. I participated in tenders for several infrastructure projects, including the reconstruction of ul. Wał Miedzeszyński, voivodeship road 579, and Wybrzeże Helskie St. I was also involved in the construction of a noncollision interchange of Zwierzyniecka/Piłsudskiego St. with railroad line no 1 in Skierniewice, as well as the expansion of the viaducts along Trasa Łazienkowska at the Agrykola Park. In addition, I calculated risk issues and their impact on the final cost value of the offered contracts using the Monte Carlo method. Show less

  • Licenses & Certifications

    • FCE First Certificate in English

      Cambridge English Language Assessment
      May 1999