Harshit Desai

Harshit desai

bookmark on deepenrich
location of Harshit DesaiAhmedabad, Gujarat, India
Phone number of Harshit Desai+91 xxxx xxxxx
Followers of Harshit Desai1000 followers
  • Timeline

    Sept 2015 - May 2018

    Electrical Site Engineer

    Pyramid Engineers
    Nov 2018 - Jan 2021

    MEP Project Engineer

    TAKENAKA INDIA PVT LTD
    Jan 2021 - Sept 2022

    Senior Engineer

    Sellowarp Epp India Pvt Ltd
    Oct 2022 - Jan 2025

    Senior Engineer MEP

    Knight Frank India Pvt Ltd
    Current Company
    Jan 2025 - now

    Assistant Manager MEP

    Befree - Finance and Accounting Business Process Outsourcing
  • About me

    Ex- Knight Frank I Ex-Takenaka

  • Education

    • National power training institute

      2014 - 2015
      Post graduate diploma thermal power plant engineering

      Activities and Societies: recently scheduled training in GURU GOBIND SINGH SUPER THERMAL POWER PLANT, ROPAR 6*210 MW Successfully completed 500MW simulator training at NPTI faridabad.

    • Indus institute of technology and engineering

      2010 - 2014
      Bachelor of engineering (be) electrical and electronics engineering distinction
    • National power training institute, nagpur (under ministry of power, govt. of india

      2014 - 2015
      Post graduate diploma thermal power plant engineering
    • Gujarat technological university, ahmedbabd

      2010 - 2014
      Bachelor of engineering - be electrical and electronics engineering distinction
  • Experience

    • Pyramid engineers

      Sept 2015 - May 2018
      Electrical site engineer

      Completed Projects. • Inductotherm India Pvt. Ltd., Sanand Ahmedabad • Hero Moto Corp Ltd., Halol • Munjal Kiriu Industries, Vithalapur • FTF pharma India Pvt Ltd, Ahmedabad Role and Responsibilities • Installation of 11KV HT Panels, 2000 KVA 2 no and 750KVA Genset is erected with Synchronizations Panel, 15 MLT Panels Testing & Commissioning of H.T/L.T.Panel, Transformer. • 250 KVA two Genset with Synchronization, 11KV HT DP Structure, Oil Type 1000 KVA Tap changing transformer is Installed. • 1000A VCB Panel, Cable tray layout, Wall & M&E coordination drawings. Industrial wiring as Well as installation of Highway Lights & Other Type of Light Fixtures in Show Room, HT/Lt Cable laying of HT/LT & Termination. • Fire Alarm System Work with the make of Coopers, Earthling works & Testing, Installation & Commissioning of Street Lighting and Industrial Lighting, Intercom system, Data telephone work. • Coordination with Other Vendors Preparation of Shop drawing. • Fire Alarm System PA (Public Address), and LAN Local area Network) & TEL Systems (Intercom System), Preparation of BOQ, Comparisons of Tenders, Selection of Sub contractors for main electrical work• Lux level Calculation, Voltage drop & cable size calculation, Bar Chart, Planning & Progress Report, Catch up schedule, Material Inspection report, and Site inspection report, Daily & Weekly Co-ordination.• Coordinate solving skills Checking of Sub-Con Running Bill, Factory Visits taking the writing approval in mails client as well as Sub contractors, handling a team of engineers, supervisor, and sub- at Project site. • Handling the activities going on in the Erection, Coordination with client, consultant etc. Show less

    • Takenaka india pvt ltd

      Nov 2018 - Jan 2021
      Mep project engineer

      Completed Projects: • Senko Gosei India Pvt. Ltd., Vithalapur, Ahmedabad • ASTI India Pvt. Ltd. Vithalapur, Ahmedabad • Techno Trend Industrial Park, Vithalapur, Ahmedabad • Indo Japan Lighting Ltd., GIDC Sanand, Ahmedabad • Assistance actively during each project phase from Initiation –tender, planning, executing, monitoring and controlling to closing and handing over of project phase.• Built strong relationship with stockholders and maintain communication.• Manage vendors and their conflicts and escalates the issues.• Understand project documents, agreements, work orders, MOM, schedules and drawings.• Prepare project status report (weekly, monthly), Project schedule and tracking, progress report.• Maintaining of handing over documents.• Review Project Shop drawing and co-ordinate with Civil and Mechanical and Electrical utilities.• Execution and testing commissioning of Electrical Installation (Transformer, HT LT Panel, DG set, Lighting and Power, UPS, Stabilizer, Earthing and Lightning Protection System) with proper finishing and Identification.• Execution testing commissioning of ELV system (Fire Alarm System, CCTV , Public Address System)• Execution testing commissioning of Mechanical Installation (Compressed Air Network, HVAC, AHU and Piping Utilities, RO).• Execution testing commissioning of Mechanical Installation (Fire Fighting and Sprinkler System)• Execution testing commissioning of Plumbing Installation (water supply pumps and pipes, sewerage pipes. Other important Plumbing works are drinking water, Drainage and Water treatment systems) as per drawing.• Preparation Of Testing and commission report.• Coordination for liaisoning activities with vendors. Show less

    • Sellowarp epp india pvt ltd

      Jan 2021 - Sept 2022
      Senior engineer

      Completed Projects • Sellowrap EPP India Pvt. Ltd. Kadi Gujarat Plant. Role and Responsibilities • Coordinate all MEP related activities at project sites and day to day operation along with Project Managers. Guide and advice to contractors. Preparing the all MEP GFC Drawing. • Refer to the tender specs for Electrical and HVAC plumbing, firefighting& follow up with Client. Organize the preparation of equipment and material specifications and data sheets, including the preparation of Single Line Diagrams, Schematic Diagrams and Layout Drawings, Cable Trench/Tray Layout Drawings, Isometric Diagrams of Sprinkler and Hydrant Piping layouts. • Check the RA Bills, Final Bill Quantity Inspection site measurement as per the tender Specifications • Responsible for commissioning of All MEP services as per design, Capable to work as a MEP Coordinator for multiple projects. • Reviews AutoCAD drawings, layouts, study models, documents and calculations prepared by external designers / consultant or client. Ensures all MEP compliance with applicable codes, standards. • Checking installation standards and specifications. Review of tender document including the scope of work, specifications, value engineering, and bill of quantities, technical offer, technical clarification, and list of deviation to the specification, list of deviation to the scope of work. Checking given estimation. Show less

    • Knight frank india pvt ltd

      Oct 2022 - Jan 2025
      Senior engineer mep

      Project DeliveredSkretting Aquaculture India Pvt. Ltd. – Surat 450000 sftTotal Energies - 8000 SftCitrin Copperman LLP - 36000 sftMovin Logistics - 4000 sftWellnest Tech - 14000 sftOmron Automation - 2000 sft • Responsible for day to day site activities by planning, master scheduling, organizing, monitoring all construction activities. • Study all drawings, specifications on all construction matters and resolve related issue. • Responsible to ensure that drawings, specification, procedures, work practices, method statements, risk assessments, quality plans are available and are effectively used. • Manage project resource allocation and provide direction and support to project team. • Coordinating with all consultants and fetch necessary details required for eliminating, Bottle necks during the project execution • Understanding on all contractual terms and conditions of the contract & thorough with documentation • Should be well verse with the contractual correspondences with the external Agencies. • Value Engineering & should be able to preempt the possible extra items and find the alternate solutions without compromising the specs and quality. • Hands on knowledge on IS codes and should have fair knowledge on MEP design, strength of Material aspects, good knowledge and experience in Quality control assignments in the earlier. • Responsible for procurement of material and its timely movement to the site. • Responsible for finalizing contractors and subcontractors, monitoring and accurately predicting job costs, maintaining billing and schedules • Responsible for erection and commissioning of all MEP Activities as per design specifications • Responsible to provide updates to the management on the day-to-day activities of assigned projects • Ultimately responsible for safety and quality, built as per the required project standards and within Budget Monitors personnel manning schedules to ensure they match Project Schedule. Show less

    • Befree - finance and accounting business process outsourcing

      Jan 2025 - now
      Assistant manager mep
  • Licenses & Certifications

    • Cert prep: revit mep electrical certified professional

      Linkedin
      May 2020
      View certificate certificate