    Engineering Manager – PSI Engineering

  • Education

    • Kazakh state civil architectural academy, almaty, 1993

      1986 - 1993
      Engineer's degree civil engineer 4.8

      Activities and Societies: 1987-1989 Military service, sergeant. Industrial and civil engineering

  • Experience

    • Jv energoprojekt-kazzhol

      May 1999 - Dec 1999
      Structural engineer

      Development of project estimate documentation in Russian and English, preparation for issuing of CAD drawings based on geodesic data of “Ski-Pro” system. Site Inspections, review of site conditions of the existing structures and preparation of AutoCAD survey drawings.Development of project engineering and estimate documentation. Drafting and issuing steelwork, architectural drawings in AutoCAD.Engineering of container type buildings, modular building for the camps. Development of spreadsheets for calculation of the steelworks in ExcelTechnical support of approval processes by State Authorities. Show less

    • Kazgor

      Jan 2001 - Jun 2003
      Lead designer

      Prepeared structural drawings and performed structural calculations in Lira 8.0. Participated in preparation of explanatory notes and calculation reports.Developed Architectural drawings in AutoCAD, generated 3D Models and project general layouts. Performed cross disciplinary checks and approvals. Participated in development of software for assisting design processes based on Excel & Visual Basic 6.0. Assisted with site supervision for compliance with to the structural companies to conduct authorship supervision on site in accordance with engineering documentation. Show less

    • Pfd international, llc

      Jun 2003 - Jul 2008
      Site supervisor / lead engineer / civil engineer

      TCO Second Generation Plant ProjectProvide support to the Area Field Engineers in area of engineering change management providing technical expertise, analysis and recommendations to resolve conflicts in engineering drawings and specifications.Interface between engineering team and the contractor maintaining Authorship Supervision log books. Reviewe RFIs and NCRs assessing their impact on approved engineering drawings. When necessary approved changes incorporating them in the Authorship Supervision logs.Sulphur Forming Building: Coordination and technical supervision of engineering work in course of project development stage. Performed quality assurance of the engineering documentation and developed engineering guidelines. Participate in development of detailed design documentation and estimates. Provision conformity and compliance of engineering drawings with appropriate standards and specifications. Coordinate and control changes and amendments input into design estimate documentation as per comments made by appropriate review authorities, errors correcting. Project planning and reports for Project Control Group. Making of structural calculations (in English and Russian) as per British and Kazakh standards, checking of the structural design projects developed in PFD office of Kimberley, Houston against compliance with Kazakh Codes and Standards. Show less

    • Worleyparsons

      Jul 2008 - Sept 2013
      Chief csa / chief architect / chief civil structural / principal civil engineer

      JV Inkai. Feasibility Study of Glatt HCN/NaCN Plant Project.Input to coaching, teaching, mentoring and effective supervision of assigned personnel. Assisted in the developing and implementation of Civil/Structural Engineering administrative and technical practices, specifications, and procedures. Monitoring and implementation of Quality Checking Procedures and ensured they are adhered to.Responsible for developing Project Civil/Structural Engineering CTR’s for review with Chief Engineer.Responsible for input into the Plot Plan, General Arrangements and project Engineering guidelines.Kazakhmys Smelters Optimization ProjectResponsible for project execution planning with Customer, including issue of weekly project status reports. Coordinate and approve the accepted project solutions with Customer and related departments. Prepare a site survey report and assessment of building and structures conditions under the Smelter Optimization Project in Balkhash and Zhezkazgan. Responsible for developing specifications, for main shops and auxilliary facilities.110/10kW GPP-4 Upgrade ProjectResponsible for developing design documentation for substation facilities, prepeared all specification and project procedures. Show less

    • Psi engineering (пиэсай инжиниринг)

      Sept 2013 - now
      Engineering manager

      Aktogay Copper Project, Plant Offsite Permanent Water Supply Networks and Facilities (+30 km Water Supply Pipeline, Od800, 2000m3/hr, +25 pits, pump stations and reservoirs)Responsibilities included establishment and daily management of engineering team responsible for delivering detailed design of Aktogay Plant Offsite Permanent Water Supply Networks and Facilities Project. Project infrastructure includes: +30 km Water Supply Pipeline Od 800, +25 pits, four railway crossings (including Turksib), two pump stations, administrative block, two 10/0,4 Kv substations, OHTL power lines, collector piping, 10 000m3 and 1 200m3 water reservoirs. Project received GosExpertisa approval and currently is in construction phase.Project value +US $25 million Show less

    • Тоо industrial construction group (индастриал констракшн груп)

      Nov 2017 - Dec 2021
      Engineering manager

      Aktogay Sulphide Plant Expansion ProjectThe Board of Directors of the KAZ Minerals Group approved the project to expand production at the Aktogay GOK by building another concentrator. As a result, the volume of processing of sulphide ore should double - from 25 to 50 million tons per year.Responsibilities included establishment and daily management of engineering team responsible for delivering detailed design of Aktogay Permanent Camp (extended to 3000 employees) expansion and Camp Infrastructure Project, including new Zhuzagash raw water pipeline and Facilities (+30 km Water Supply Pipeline, Od800, 2000m3/hr, +25 pits, pump stations and reservoirs)Project value +US $1.2 billion (total) Show less

  • Licenses & Certifications

    • Revit structure 2014 + autocad structural detailing 2014

      Autodesk customer learning
      Nov 2013
    • Autocad civil3d

      Autodesk customer learning
      Mar 2013
    • Design in seismic areas

      Ргп "казнииса"​
      Jun 2016
    • Design in seismic areas

      Ргп "казнииса"​