Boontham Hamhim, PMP

Boontham Hamhim, PMP

Engineer

Followers of Boontham Hamhim, PMP790 followers
location of Boontham Hamhim, PMPBangkok, Bangkok City, Thailand

Connect with Boontham Hamhim, PMP to Send Message

Connect

Connect with Boontham Hamhim, PMP to Send Message

Connect
  • Timeline

  • About me

    Engineer at WSP (Thailand)

  • Education

    • Chulalongkorn University

      1998 - 2000
      Master of Engineering (MEng) Civil Engineering
  • Experience

    • WSP (Thailand)

      Sept 2004 - now
      Engineer
    • Parsons Brinckerhoff

      Sept 2004 - now
      Trackwork Engineer

      Apr 2019 - PresentHSR Bangkok-Nong Khai (Section 1 Bangkok-Nakhon Ratchasima)Dec 2019 - Dec 2023HSR Bangkok-Nong Khai (Section 2 Nakhon Ratchasima - Nong Kai)Dec 2019 - PresentPMCSC MRT Orange Line (East) Project (Thai Cultural Center – Min Buri Section)Aug 2015 - Dec 2019PMCSC for MRT Green Line (North) Project (Mo Chit – Saphan Mai – Khu Khot Section)Apr 2013 - Jun 2020 Red Line Project, SRT, BangkokOct 2012 – Jan 2014OTP High Speed Railways in Thailand: HSR-N and HSR-NEMay 2012 - June 2015Feasibility Study, Review, Design, Tender Documentation and PPP for the Mass Rapid Transit (MRT) Orange Line and Purple LineSep 2011 - Jan 2013Design Consultant for Detailed Design of Double Track Project, Nakhon Pathom – Hua Hin, ProjectOct 2012 - Dec 2015TM for Double Track Project, Chachoengsao – Khlong Sip Kao - Kang Koi, ProjectFeb 2012 - Apr 2014ICE for BMA Mass Transit System – 5.3 km. Silom Line Extension, Taksin - Phetkasem, ThailandJuly 2011 - Apr 2014Track Rehabilitation Project Phase 6 for State Railway of ThailandJuly 2007 – Jan 2013 Mumbai Metro One Project, Mumbai, IndiaDesigner for Mumbai Metro One Private Ltd.Dec 2010 – Feb 2011Bangalore Airport Rail Link (BARL), India prepare tender documents for design and built proposalJune 2009 – Oct 2010SRT Double Track Feasibility Study and Preliminary Design, Thailand Feb 2010 – Apr 2010Blue Line Ext : Hua Lamphong – Bang Khae and Bang Sue – Tha Phra Section, Thailandprepare tender documents for design and built proposalNovember 2008 – September 2009Detailed Design Consultant for BTS Extension from Mo chit to Saphanmai to Lamlukka, ThailandApril 2007 – October 2009CSC for BMA Mass Transit System 5.25 km. Sukhumwit Line Extension, On Nut – Bearing, ThailandOctober 2008 – February 2009 Hyderabad Mass Transit system (HMRTS), IndiaAugust 2007 – April 2008Detailed Design Consultant for BTS Extension from Mo Chit to Saphanmai, Thailand Show less

  • Licenses & Certifications