Khaldoune ACHIRI

Khaldoune ACHIRI

Infrastructure Project Engineer

Followers of Khaldoune ACHIRI464 followers
location of Khaldoune ACHIRICasablanca-Settat, Morocco

Connect with Khaldoune ACHIRI to Send Message

Connect

Connect with Khaldoune ACHIRI to Send Message

Connect
  • Timeline

  • About me

    Construction Manager - JESA (JV OCP & Worley)

  • Education

    • Ecole Hassania des Travaux Publics

      2009 - 2012
      Degree of State Engineer (Ingénieur d'Etat) Hydraulic and Environmental Engineering (Génie de l'Hydraulique et de l'Environnement) Réussi

      Activities and Societies: Organisateur des olympiades de l'école dans la discipline Tennis, année 2011; Membre du club social de l'école

  • Experience

    • BET NECS

      Nov 2012 - Aug 2013
      Infrastructure Project Engineer

      *Technical Design and Supervision of Stormwater and Wastewater Sewerage Infrastructures Works;**Technical Design for Roads and Sanitation Networks of Real Estate Projects.

    • Entreprise HOUAR

      Aug 2013 - Dec 2013
      Project Manager Infrastructures Works

      Monitoring and Supervision of Road, Sewerage and Water infrastructures works for equipment of real estate project.

    • RADEEC

      Dec 2013 - Feb 2021
      Head of Design Department Water and Sanitation

      *Technical studies and planning of hydraulic infrastructures on behalf of Real Estate Projects (120 MMAD/Year) :- Water Networks;- Warer Storage Systems;- Wastewater Networks;- Storm Wastewater.Wastewater Treatment Plant**Supervision of Sewerage and Water Infrastructures Works :- Water and Wastewater off-site networks (66 MMAD);- Wastewater Treatment Plant WWTP (123 MMAD);***Management of Works with FIDIC Contract Conditions :- Conditions of Contract for Plant and Design-Build (FIDIC Yellow Book). Show less

    • Millennium Challenge Account-Morocco

      Mar 2021 - Jun 2022
      Infrastructures Manager

      *Implementation of off-site works for development of three sustainable industrial parks (PPP Partnership), with a budget of 610 MMAD :**Projects are managed under FIDIC Contract Conditions (Red and Yellow Book) and MCC Small Works Contract :o Wastewater and water off-site networks ;o Stormwater storage systems ;o Water storage systems ;o Electrical off-site grid ;o Bridge and hydraulic infrastructures ;o Wastewater Treatment Plant WWTP operating with “Activated Sludge Process” with a capacity of 5200 m3/day ;o Wastewater Treatment Plant WWTP operating with “Aerated Lagoon Process” with a treatment capacity of 2700 m3/day. Show less

    • JESA S.A

      Jul 2022 - now
      Construction Manager

      Construction of Sea Water Desalination Plant with a production capacity of 45 MM3/Year as part of the Emergency Water Program of El Jadida Region (Morocco) :- SWRO plant ;- Pumping station ; - Off-site pipeline ;- Water storage system.

  • Licenses & Certifications

    • Certificat général international NEBOSH de santé et sécurité au travail (IGC)

      NEBOSH
      May 2023