Pramod Kumar Singh

Pramod Kumar Singh

Followers of Pramod Kumar Singh158 followers
location of Pramod Kumar SinghBathinda, India

Connect with Pramod Kumar Singh to Send Message

Connect

Connect with Pramod Kumar Singh to Send Message

Connect
  • Timeline

  • About me

    Deputy Manager -Operations at HPCL-Mittal Energy Limited | Ex- RIL

  • Education

    • JNV Darbhanga

      2000 - 2007
      Schooling Physics chemistry and math

      Completed secondary & higher School education

    • National Institute of Technology Surat

      2009 - 2013
      Bachelor of Technology(BTech) Chemical Engineering CGPA - 8.14

      Completed B-tech in Chemical Engineering

  • Experience

    • Reliance Industries Limited

      Jul 2013 - Nov 2017

      Involved in pre-commissioning & commissioning of Refinery off gas Cracker (ROGC)of 1.5 MMTPA capacity of ethylene production ( Licensor - Technip)Job Performed- Reviewed PFD ,P&ID , cause & effect matrix - Develop SOP for safe and reliable operation of plant- Involved in DCS control /ESD logic check - involved in pre-commissioning and commissioning activity like preparation and execution of loop flushing, hydro/pneumatic test, chemical cleaning , catalyst loading, equipment internal inspection, steam blowing, cooling water network commissioning-Execution of test run of rotary equipment ( successfully commissioned ROGC cracked gas compressor of 56 MW ) Show less

      • Manager - operations

        Jan 2016 - Nov 2017
      • Manager - Operations

        Jul 2014 - Jan 2016
      • Graduate Engineer Trainee

        Jul 2013 - Jul 2014
    • HPCL-Mittal Energy Limited

      Dec 2017 - now

      Working in NHT /ISOM/CCR unit of Motor Spirit block Job role:- Plant performance monitoring-Process optimization and troubleshooting- SOP review, Alarm rationalization- PFD, P&ID review of new project or any process changes through MOC -Assuring functional integrity of process equipment for performing in a safe and reliable fashion.-Planning Turnaround activities -Implementing and strengthening Process safety, HAZOP Study - Handled emergency during plant operation upset- Developed sound knowledge of line sizing, pump hydraulic calculation, PSV sizing, control valve sizing Show less

      • Deputy Manager - Operation

        Feb 2024 - now
      • Assistant Operations Manager

        Dec 2017 - Feb 2024
  • Licenses & Certifications